Loading...
HomeMy WebLinkAboutStaff Review_~ ~'~ c~ TfiP~~-i-1~<1~N ~ `1'v G~W~h1 STAFF REVIEW C( No. 1 ~TT~"1~ ~SC;Y.~ ~~~ ~i r~~ ~ov )MMENTS Project: HEAT TRANSFER RESEARCH INCORP. -SITE PLAN (00-123) PLANNING ~I : Please be aware that the subject property is zoned M-1, planned industrial, not C-1 as stated on the application. ~'~~.~ ~- ~ ~ °~_: '~~~ e- _ ~7 -! ~ "< ~ P ~_. _ ~ _ . ! (2. Site plan title block needs to provide the legal description and the design ~./ professional's address and phone #. (Several sheets in the submittal do not reflect ,,/the correct legal description of Block 3, Lot 1 A of the Business Center.) ` '~_ ~±' ~7a~= G` ~3. ShOW opposite and adjacent driveways per Driveway Ordinance 1961. ~d=~~ ~~ ~~ ~k: Show floodplain line on site plan..~~.>~:%° f ~ "~ ~~- # _ ~ ,~ Add note to site plan that at the narrowest point, all parking spaces are a minimum of 9 feet. f - ~ l"~ ` ~ >~-'i,~ ,~6' Show pavement details for circulation isles/parking and fire lanes. --~~yyt'~= ° ~' ' d"i ,rv ~'r_ ~h ~ ~~ ~ y#t ~a Show location of FDC (Fire Department Connection onto buildings-spr~nt~r~°.-"y'`'~ ~;N~~,~tN~ r.8°' State on landscaping plan that the tree barricades will be a minimum of 1 foot in radius per caliper inch of tree diameter. ; ' '. ~-F:= _ y r . _~~" L~=_, j ~ Provide details for the required gating of the dumpster enclosure. r'ay~~~~ °'.~tr` ~w~ :'r eater and sewer demands will be required before site plan can be stamped approved `=~`~~~` r~~ _ ,.~, - ;~ 1 t ~~rr-~ ~~~~.? ~~='.. ri-_' ~:a~~ ~ r ~~ T "~ - - _. :. r. , BUSINESS CENTER COVENANTS r,'<~„''~'' ~ "\' The Board has final authority over- ~e ~Tandscaping plan and since several ~, ~ elements were missing from the plan, the Board was unable to review the plan. Please address the following elements for further review by staff and the ,,a .~. Business Center Review Board. = ~ ,_ ~~t ~ ~ " ,~ ,~ °i_.r ~ -~, ~~ , ~ ~ ~. _ ~ .-t~C~-~ ~~ 1. Delineate the required protected area and provide square footage. ~ ~l~r ~~ ~' ~ ~' 2. Delineate the developed area and provide square footage. _:` ' "~~ '-~~?~ ~~ ~ _ -'~" 3. Provide square footage for the L.A.U.E./setback area ~"=~~'~ ~ ~ ~_~ '~' ~"~`~ ~_ ~-`__' I'' 4. Based on the developed area specification provided, the landscaping plan Y appears to meet the basic requirements, with the following exceptions.. "~~,r-_?=_:__ r=_~_~-< ~-~` 5. Additional parking screening is required along the drive parallel to the first ~. parking row. fi'~ ~. Y ~f- , ~ ,~,,;~ r ~- ~-~ a -~ , . ; I - ------- ~ 6. The Board will need to decide whether the first parking space after the parking island will also need to be screened from view of the R O.W 1-ti %~-p ~ r~`'-~7 ~=' ,f , ~~= ` `~' ;-.. a~~ ~/"~ 7. Barricade the trees in the L.A.U.E./setback area. t`~_ ,f J+-'- - =1• {~ ~_ 8. The Business Center Board will need to decide whether to allow credit for the 18 trees in the developed area that are being shown for points ° ~ T ~ .,T F~1NT5 , ~-- " 9. Canopy trees that are barricaded are generally awarded ~00-300 points de endin on sizes but the hoard Yhas mal authorit ~ ~ ,. - , ~ ._ -- - Reviewed by: _ -- __~ ____ _ ._-- - _ essica Jimmerson Date: July 20, 2000 J:IPZTEXT\PZ03373.DOC Pane ~ of ~ ", G ", ~ 1 fi"~ 7 ~~' ~ 9 - Il ~~ 1 ENGINEERING 1. Sheet C-1 Site Utility Plan -Add note to show 8" sanitary sewer.and,man~hole as ~. ~ _ _ . , existing. ' ~ ~ ~' ~ "~~. a~-rr_ ~: ~ ~ s~ ~ - ~ r~~;~ ~~~~~~f~~~ --~F ~~_s ~--~ J~~.~,~ _,~; 2. Sheet G1.1: Grading Plan- Add details for 3' wide concrete channel and grate inlets/concrete culverts (2). ~ ~""=~"~C=.L%~ ~~~ - - ~ ~ r ~: -7 i ; 3. Sheet D1.1: Silt Fence- Extend fence along southeast side approximately 250'. %tt=~~-1=' %t~`~• ~<< 4. Need plan/profile sheet for sanitary sewer in public easement with ,details -i.e.,, P~'~ip~ grades, slopes, sizes, lengths, flowlines; show manhole details ~ i~r ~'~`_ '- `~ c~'-Y ~O~'^ ~ °,• ~ ....:~ r a Cpl ~~~~ . 5. Need trench safety detail sheet. ~r ~ `'' 's ~ _ ~ '~~~~,~~~ c~~a~. ~~ 6. Need to submit drainage, IetterTeport analyzing pre vs. post development peak flows, etc. ~ `-; , r , -~ r ~_:,-~ - ~- ~ ~- ~~,1~ r, ~~ , 7. No pavement details shown ~ ~`~ ,~ ; ; ` ~~> ~ 3 -;~ ; -.~-~-:,~. ~- _` ~r~t= oIU G"i ~~ I _~_ _ -__ _ 8. All documents containing engineering details must be sealed by, a Registered Professional En sneer Texas . ~ ~ ~ ' "~~ - ~~~ ~~'' '~ t ' ~~'~ ~ ~~~~` " ~ ~ ~" ~'' '~~~~~ 9. Need sealed engineer's estimate~or all publ~-ir~fras~t~cture. ~'d`~4' ;l-~~- ~`" ~ ~- ,_ _ `~' -3r '~"` ~~~'-'''?'~l ="~~'(,",~?=~" fir':%i!.,1:~ , Reviewed by: Ted Mayo Date: 07/10/00 ELECTRICAL .- A C 1. Developer responsible for installing conduit per city spec and design. ~ :mss, j~'~' t~ 2. Developer responsible for pouring Transformer pad per city spec and esign. ~,i--~-;r, 3. Developer responsible for providing easements to cover all primary electric lines ~PS~° - equipment f~~`. ~.-_ ` r e.~ ~`' '__--~ ~~ -_ ~,~ --.. 4. Developer needs to coordinate with City of College Station Electrical Division on where to stub conduit up at proposed 200 Amp Junction Box location. tA~ ~ ~-~~ ~~i~= 1, ~% ' ~ ~~~`~ ' 5. Developer needs to provide Electric Load Information ASAP ~~ ~r~X-~-+i.~~/~%IV'~ltck Reviewed by: Jennifer Reeves Date: July 20, 2000 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. J:\PZTEXT\PZ03373.DOC Page 2 of 1 STAFF REVIEW COMMENTS No. 1 Project: Heat Transfer Research Inc. -Site Plan (00-123) The revised landscaping plan has some significant changes from the approved landscaping plan. It is short 5 trees and relocates 42 shrubs, though it does also add 47 new shrubs. PLANNING 1. The 47 new shrubs were placed in landscaping beds adjacent to the building, and while all of these should be counted toward the overall landscaping on the site, their placement cannot be considered when evaluating the 42 relocated shrubs, which were planned to serve a different purpose. Staff does not have a problem with landscaping planted above and beyond the approved plan, so long as it does not interfere with visibility triangles or hamper something else required on the site. 2. Forty-one of the originally approved shrubs were moved from locations intended to provide parking and drive aisle screening to the landscaping beds adjacent to the building. While their placement may improve the aesthetics of the building, this change puts the site plan out of compliance with an ordinance requirement. The screening method originally approved with the site plan was through landscaping. The existing plants do not meet this requirement. Additional landscaping will need to be installed in these areas. 3. FYI - In this same vein, staff is concerned after visiting the site that the existing landscaping, which is intended to provide screening, will not do so after one growing season as required. The placement and size of the shrubs is of concern. However, this issue may be addressed next year by code enforcement if there is still an issue. Business Center Board 4. Removal of the two trees along the frontage will cause the plan to no longer meet streetscaping requirements. The previously approved plan just met the minimums for streetscaping. Staff has no objection to the two trees being relocated within the L.A.U.E., with Board approval. 5. Removal of the trees in the island at the back of the property does not affect the required landscaping or streetscaping. They were, however, considered by the Board when approving the aesthetics of that area. The Board will need to decide if new trees or other landscaping need to be located in that island to replace the removed trees. Reviewed by: Jessica Jimmerson Date: 6-18-01 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 2 of 2 J:\PZTEXTISR5.DOC v 1 STAFF REVIEW COMMENTS No. 3 Project: HEAT TRANSFER RESEARCH INCORP. (SP)-SITE PLAN (0-123) PLANNING Sign Review 1. Meets City of College Station Zoning Ordinance sign regulations. Business Center Covenants and Restrictions 1. Does not meet any of the requirements of Article-XV Section 15:40 1.a-d. Reviewed by: Jennifer Reeves Date: 03/19/01 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 1 of 1 STAFF REVIEW COMMENTS No. 2 Project: HEAT TRANSFER RESEARCH INCORP. (SP)-SITE PLAN (0-123) REMAINING COMMENTS FROM 1ST ROUND REVIEW: 7. We look for the location of the FDC at the site planning stage, so that we can assure that the fire department will have a clear shot to run the hose from the firetruck on the nearest firelane to the FDC. Please provide some indication of its location. 9. What is the material of the doors? Are they galvanized as well? 10. Sewer demand needs to be in gallons per day not fixture units. NEW COMMENTS -LANDSCAPE PLAN RELATED: 1. The Business Center Advisory Board approved the landscape plan as submitted with the following additions: brick pavers across driveway entrances and colored concrete sidewalk ramps (matching color throughout Business Center). Reviewed by: Jessica Jimmerson Date: 8/9/00 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. J:\PZTEXT\PZ03464.DOC Page 1 of 1 STAFF REVIEW COMMENTS No. 4 Project: HEAT TRANSFER RESEARCH INCORP. (SP)-SITE PLAN (0-123) PLANNING Sign Review 1. Meets City of College Station Zoning Ordinance sign regulations. Business Center Covenants and Restrictions 1. Please submit the actual wording, as it will be displayed on the sign, with the Business Center Logo. 2. Please be aware that the Business Center Covenants and Restrictions require signs be double faced. It is our understanding that the location of your sign is to help screen utility equipment. You may be able to submit this to the Business Center Advisory Board for a variance on this restriction. 3. It is the applicant's responsibility to insure the sign will not interfere with any utilities in the easement. 4. Attached is a copy of the City of College Station Business Center Logo. Reviewed by: Jennifer Reeves Date: 04/04/01 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 1 of 1