HomeMy WebLinkAboutStaff ReportsSTAFF REVIEW COMMENTS
No. 1
Project: PEBBLE CREEK PH. 8-B (FP) (0-116)
1. It appears that changes have been made to four lots (15, 16, 17 and 18) not
just three. Change the title block.
2. Show existing conditions and proposed changes side by side. (Only the
affected lots need to be shown, in fact they should be bolded.)
NOTE: Any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and
"bubbled" on your plans. Any additional changes on these plans that have not
been pointed out to the City, will constitute a completely new review.
Reviewed by: JESSICA JIMMERSON Date: 06/21/00
Staff Review Comments Page 1 of 1