ENGINEERING REVIEW
COMMENTS No. 1
Project: College Main Parking Garage (SP)-SITE PLAN (0-115)
1. Concerning the irrigation water service, please include note in Water Service
Notes- [2] "w/ Backflow Preventer (RPZ)". This note has been added by
myself to the submitted drawings after my conversation with Mr. Mike Record
(8/16/00).
2. Due to the fact that the water lines on College Main are Public Infrastructure
up to the meter and or backflow preventer, please submit a plan and profile
sheet detailing construction and any conflicts with other utilities.
Reviewed by: Spencer Thompson Date: 08/16/2000
STAFF REVIEW COMMENTS
No. 2
PROJECT: COLLEGE MAIN PARKING GARAGE (SP)-SITE PLAN (0-115)
PLANNING
1. Please make a note on the first page of the site plan that the site plan
consists of pages Al-2, A6-7, L1-2, and C1-8.
2. On Sheet A2, please show the overhead utility lines on the west side of
the building as ending at a pole.
3. Will the sidewalk that is planned for the south side of the building meet
minimum clearance when it reaches the transformer pad?
As discussed at the Northgate Review Board meeting:
4. Landscaping in the area of the detention pond will be reviewed after
detention pond changes are made.
~ 5. Bicycle rack(s) for the parking of 20 bicycles need to be added to the plan.
Standards for rack design, color, and signage are described in the
""~ Northgate Design Guidelines. Copies of relevant pages from the
Guidelines are attached to these review comments.
~- 6. A change from stamped concrete to brick pavers will be requested if their
use is determined to be economical.
~ 7. It need not be included on the site plan, but the addition of the Northgate
Logo on the eastern facade will be required as a condition of the building
permit.
Reviewed by: Molly Hitchcock Date: August 8, 2000
ENGINEERING
1. According to my conversation with Mr. Record, the design of the fire
system is being addressed in order to meet NFPA standards. This will
Staff Review Comments Page 1 of 1
J:\PZTEXT\PZ03548. DOC
affect the water meter and line size going to the building. It will also
eliminate the 2" connection of the domestic water supply to the fire line.
2. The final drainage report has not been reviewed. According to
conversations with Mr. Llewellyn, he will amend and resubmit the report
for final approval.
Reviewed by: Spencer Thompson Date: August 11, 2000
ELECTRICAL
1.
Reviewed by: Jennifer Reeves Date:
NOTE: Any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and
"bubbled" on your plans. Any additional changes on these plans that have not
been pointed out to the City, will constitute a completely new review.
Staff Review Comments Page 2 of 1
J:\PZTEXT\PZ03548. DOC
NORTHGATE REVITALIZATION BOARD (NRB)
REVIEW SUBCOMMITTEE MEETING
August 2, 2000
TO: Mike Record, Arkitex Studio, Via fax (979) 846-8224
Mark Smith, Via fax (979) 764-3489
FROM: NRB Review Subcommittee:
Elton Abbott, Jr., NRB Member
Cheryl Anz, NRB Member
Richard Benning, NRB Member
John Happ, P&Z Commissioner
Ray Harris, P&Z Commissioner
Karl Mooney, P&Z Commissioner
Staff Attending:
Sabine McCully, Senior Planner
Molly Hitchcock, Staff Planner
Bridgette George, Asst. Development Coordinator
Tammy Macik, Secretary
SUBJECT: College Main Parking College -request for approval for the development of a
parking garage to be located at 309 College Main in Northgate. (00-115)
The NRB Review Subcommittee held a meeting on Wednesday, August 2, 2000 to review the
above-mentioned item. Mike Record opened the discussion by informing the NRB Committee
that a change of design would be necessary for the water detention area since the city's
Economic Development Council had made an agreement to let the Traditions dormitory facility
drain its runoff water on the garage site. Therefore, the landscaping and the general presentation
of that area could not be considered by the NRB at this time. The NRB discussed different
issues pertinent to the development of the garage. The issues discussed were landscaping,
bicycle parking, sidewalks, sign types, awnings, and the architecture.
Commissioner Happ motioned to approve the landscaping from College Main to a portion of
Second Street. The motion was seconded by NRB Member Anz and passed 5-0.
Commissioner Happ motioned for the architects to investigate the parking, rack design color and
signage for 20 bicycles in the parking garage.
The motion was seconded by NRB member Benning and passed 5-0.
Commissioner Happ motioned to accept the design and placement of the sidewalks. The motion
was seconded by NRB member Benning and passed 5-0.
NRB member Benning motioned to investigate the use of brick pavers instead of stamped
concrete for the sidewalks.
Commissioner Harris seconded and the motion passed 5-0.
NRB member Benning motioned to use the Northgate logo between the buttresses and also
motioned to approve the proposed sign types and their placement.
Commisioner Happ seconded and the motion passed 5-0.
Commissioner Happ motioned to accept the awning as presented.
NRB member Anz seconded and the motion passed 5-0.
Commissioner Happ motioned to accept the architectural style, mass and scale and the building
color, elements and orientation.
NRB member Anz seconded and the motion passed 5-0.
NORTHGATE REVITALIZATION BOARD
STAFF REPORT
For
College Main Parking Garage (00-115)
All proposals involving site development or redevelopment in the Northgate District shall require a
review by a review subcommittee of the Northgate Revitalization Board (NRB).
Zoning District: NG-1
Location: At the corner of Church Avenue and College Main
Item Summary: Urban renewal
Issues/Items for Review:
1. Additional parking and traffic impact studies, a review of existing occupancy, and other reasonable
appropriate data to determine the impact of the project may be required. Additional parking or
landscaping may be required where studies reveal that it is necessary to relieve or mitigate this
impact.
2. Bicycle Parking Location
3. Bicycle Rack Design/Color
4. Bicycle Parking Signage
5. Streetscaping/Landscaping
6. Sidewalks
7. Sign type
8. Sign Design and Placement
9. Awnings and Canopies Design and Color
10. Architectural style
11.Architectural mass and scale
12. Building color
13. Building elements
14. Building orientation
City of College Station
Development Services
P. O. Box 9960 ~ 1101 Texas Avenue ~ College Station, Texas 77842
(409) 764-3570
NORTHGATE REVITALIZATION BOARD (NRB)
REVIEW SUBCOMMITTEE MEETING
October 24, 2000
TO: Mike Record and Chad Grauke, Arkitex Studio, Via fax (979) 846-8224
Mark Smith, City of College Station, Via fax (979) 764-3489
FROM: NRB Review Subcommittee:
Elton Abbott, Jr., NRB Member
Cheryl Anz, NRB Member
Richard Benning, NRB Member
Ray Harris, P&Z Commissioner
Karl Mooney, P&Z Commissioner
Carolyn Williams, P&Z Commissioner
Staff Attending:
Natalie Ruiz, Development Review Manager
Molly Hitchcock, Staff Planner
Jessica Jimmerson, Senior Staff Planner
Tammy Macik, Secretary
SUBJECT.' College Main Parking College -request for approval for the landscaping of the
parking garage to be located at 309 College Main in Northgate. (00-11 S)
The NRB Review Subcommittee held a meeting on Wednesday, October 11, 2000 to review the
above-mentioned item. Jessica Jimmerson opened the discussion by informing the NRB
Committee that this item has come before the committee previously but there were landscaping
issues, bicycle racks and the type of sidewalk to be decided upon. Also, the mural needs to be
voted on even though there was a consensus previously. NRB Member Benning began the
discussion of how high the mural will be. Commissioner Mooney had a question about the
maintenance of the mural and NRB Member Anz had questions about the cost. Mr. Gauke gave
an idea of the type of mural they are planning to have and what the cost will be.
Home of Texas A&M University
NRB Meeting
College Main Parking Garage
October 29, 2000
Page 2 of 2
NRB Member Anz motioned to approve the concept of a mural instead of landscaping on the
south side of the building with the design of the mural to come back to the board at a later date.
NRB Member Benning seconded the motion and it passed 5-0.
The next item to be considered is landscaping. Jessica mentioned some items have been
approved but there were a few items left to be approved. NRB Member Anz had a question of
how tall the fence was around the detention pond and how safe it was. Mr. Record stated that the
fence is 4 feet tall. There was further discussion about the type of fence needed for the detention
pond and for it to go with the motif of other fences in Northgate. NRB Member Anz motioned to
accept the fence at 4 feet with intermittent masonry columns along Second Street. Commissioner
Harris seconded and it passed 5-0.
The possibility of using of brick pavers instead of stamped concrete for the sidewalks is still
being investigated. Commissioner Mooney recommended that this item go before the city to find
out what the standard is for sidewalks in Northgate.
Commissioner Harris motioned to approve landscaping and bicycle racks with the sidewalks
issue to be placed on a future agenda. Commissioner Williams seconded and it passed 5-0.
NRB Member Abbott abstained from voting on this item since he is directly involved with it.
Home of Texas A&M University
STAFF REVIEW COMMENTS
No. 1
Project: COLLEGE MAIN PARKING GARAGE (SP) (0-115)
mar a... ~...-. S'vv.s_k ~ 'i .t.. ~a:~ L.~, ~\O-/~.
1. Show all existing curb cuts-for parking as well as driveways.
,+-~;~ 2. Please note: The Lutheran Church on the abutting property is determining
~~~ ~~~~ here to place a sidewalk across their frontage. Sidewalk placement against
their property line should be coordinated with them.
3. Show all existing easements. ~•~.~~~ ~, ~--~ ~ ~~1N.o.+~'~C..~•,;,,~rv~.
4. Please include the building height in the project description. v~63,~.~ ~,..~.~~. ~~.. ~..o~-L
5. Parking spaces need to be dimensioned. v~~ .. ,~,~~.~~ ~„~_ ~!
6. Please identify all handicap parking spaces. Space and identification details
need to be provided with a note that states they will all meet ANSII standards.
7. Dimension the distances between proposed and existing curb cuts.
8. Indicate the driveway throat lengths. ``~ ~`~'~~ N ef-k . ~' w~ v,~~c Z.,~ Q
`--man the location of the ticket dispenser be adjusted to provide enoug~i queue
for at least 2 cars?
-~$-'Show all proposed easements on the site plan. Meters will have to be
located in the public ROW or in a public utility easement. ~~~~~-~ v,~p ~~~
-- -1-1--There is an unmarked line ending on College Main on Sheet A2. What is it?
12.AIso on Sheet A2, The overhead utility lines on the west side of the building
need to be shown ending at a pole.
13.On the landscaping plan, there appears to be:
• Only 3 Leyland Cypresses ,
• Only 22 Nellie Stevens Hollies~,,,~0.1`~L ~rL ~
• And 7 Crepe Myrtles (4 more than identified in the landscape legend).
14. Trees are evaluated by their caliper size. Please remove gallon sizes from
the landscape legend and replace with caliper sizes.
15. There is a 20' separation requirement between canopy trees. Please adjust
the placement of the Leyland Cypresses to meet this.
i. The detention pond needs to be screened from the ROW with landscaping.
Please consider planting grass over the weir. ° ~^"~ ~. ~-~ -~-
'.Show meter and transformer locations on the landscaping plan and show that
they will be screened with landscaping.
Staff Review Comments Page 1 of 1
.~-~'
18. Some type of decorative element is needed west of the garage entry on
Second St. (e.g., plantings and period light standards) ~.a.*~ ~ ~ s~,~,, ~~,,~
There are five lamp posts along College Main but none along Second St. Will ~~Ov'^`~~.
any be needed?
hat are the hatch marks on sheet C-2? ~~ ~'~ ~~
~~~ _
'~~ Q ,~
Reviewed by: MOLLY HITCHCOCK Date: 07/07/00
ENGINEERING REVIEW
21. A Drainage Report has not been submitted for this project. Staff has reviewed a
preliminary drainage report, however, the report was not stamped and signed by a
registered/ professional engineer, as is required, and some calculations were not
performed as per City requirements. These calculations may affect the detention
pond sizing and the outlet piping sizing.
22. A 3" domestic water meter is specified for this project. The engineer needs to tee off
this line and install two separate meters; one for domestic use and one for irrigation,
along with the required irrigation check valve. According to plan estimates, domestic
water flow rates would require, at most, a 1" meter (PM5). Irrigation flow estimates
are not provided.
23. The fire line connection to the City's water main does not appear on the plans. A 6"
tap should be made onto an 8" water main to supply fire flows to the building fire
system. A 2" connection is shown going to the fire pipeline (PM2). This connection
should not be installed.
24. Sheet C2 shows a 6" PVC drain pipe. This pipe apparently drains the swale along
the east side of the building. It is not clear whether this drain connects to the 24"
storm drain or drains to the street gutter If it drains to the gutter, a 6"pipe may be too
large to penetrate the curb?
Reviewed by: Spencer Thompson Date: 7-Jul-00
NOTE: Any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and
"bubbled" on your plans. Any additional changes on these plans that have not
been pointed out to the City, will constitute a completely new review.