Loading...
HomeMy WebLinkAboutStaff Reports STAFF REVIEW COMMENTS No. 1 Project: EAGLE AVENUE CHURCH OF CHRIST (CUP) (0-114) 1. Scale is off on several dimensions. 2. Label current zoning of all abutting parcels. 3. For the proposed driveway, give the separation distances of opposite and adjacent driveways. 4. Indicate driveway throat length. 5. Are all the easements shown? Utility lines must lie within easements. 6. If the site does not contain any floodplain, a note reflecting that fact must be placed on the site plan. (According to FEMA map.....dated.....) 7. Show meter and transformer locations. 8. Label the setback lines. (ex. 7.5' side setback line) 9. Need 360 sq. ft. of interior parking islands. 10. The end islands shown must be 360 sq.ft. The ordinance states 180 sq.ft. per parking row, the middle aisle contains two rows. 11. Where is the solid waste container? A container, with screening, will be required. 12. The City requires #4 bars on curb detail. 13. Label Eagle Avenue on all pages of site plan. Landscaping Plan Comments 14. Give caliper and type for non-canopy trees. 15. Canopy trees must have a minimum separation distance of 20 feet (trunk-to- trunk). 16. Irrigation is required; please show a general irrigation plan. 17. Need to screen parking. 18. What type of landscaping will the parking islands contain? Parking islands may not be concrete. *NOTE* The Planning and Zoning Commission may also impose reasonable restrictions or conditions such as an increase in the amount of landscaping and parking. Staff Review Comments Page 1 of 1 • NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Reviewed by: Shauna A. Laauwe Date: 06/21/00 Drainage Report 19 Need to add copy of Site Plan (sheet C-1) or similar drawing showing final grading of parking lot and surrounding area within drainage area 1-A. 20 Table 1-shouldn't detained be outflow? Site Plan (sheet C-1) 21.Detail for conc. Discharge flume-Typ. Curb-Refer to sheet C-2 Site/Paving Plan (sheet C-2 ) 22. Typ. Curb Detail- add dimensions-11 "tk.@ back; 5" tk. Pvt.; radii-front of curb 23. Need Engineer's seal, etc. General 24. Need details of water and sanitary sewer tie-ins to public system Reviewed by: Ted Mayo Date: 06/21/00 tZ~° Staff Review Comments Page 2 of 1 STAFF REVIEW COMMENTS No. 1 Project: EAGLE AVENUE CHURCH OF CHRIST (CUP) (0-114) 1. Scale is off on several dimensions. 2. Label current zoning of all abutting parcels. 3. For the proposed driveway, give the separation distances of opposite and adjacent driveways. 4. Indicate driveway throat length. 5. Are all the easements shown? Utility lines must lie within easements. 6. If the site does not contain any floodplain, a note reflecting that fact must be placed on the site plan. (According to FEMA map.....dated.....) 7. Show meter and transformer locations. 8. Label the setback lines. (ex. 7.5' side setback line) 9. Need 360 sq. ft. of interior parking islands. 10. The end islands shown must be 360 sq.ft. The ordinance states 180 sq.ft. per parking row, the middle aisle contains two rows. 11. Where is the solid waste container? A container, with screening, will be required. 12.The City requires #4 bars on curb detail. 13. Label Eagle Avenue on all pages of site plan. 14. Note utility demands (water/sewer) on site plan. 15. Provide parking requirement information. On the site plan, need to show how parking requirement was calculated and the number of parking spaces to be provided. Landscaping Plan Comments 16. Give caliper and type for non-canopy trees. 17. Canopy trees must have a minimum separation distance of 20 feet (trunk-to- trunk). 18. Irrigation is required; please show a general irrigation plan. 19. Need to screen parking. 20. What type of landscaping will the parking islands contain? Parking islands may not be concrete. Staff Review Comments Page 1 of 1 *NOTE* The Planning and Zoning Commission may also impose reasonable restrictions or conditions such as an increase in the amount of landscaping and parking. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Reviewed by: Shauna A. Laauwe Date: 06/22/00 Drainage Report 21. Need to add copy of Site Plan (sheet C-1) or similar drawing showing final grading of parking lot and surrounding area within drainage area 1-A. 22. Table 1-shouldn't detained be outflow? Site Plan (sheet C-1) 23. Detail for conc. Discharge flume-Typ. Curb-Refer to sheet C-2 Site/Paving Plan (sheet C-2 ) 24. Typ. Curb Detail- add dimensions-11 "tk. @ back; 5" tk. Pvt.; radii-front of curb 25. Need Engineer's seal, etc. General 26. Need details of water and sanitary sewer tie-ins to public system Reviewed by: Ted Mayo Date: 06/21/00 Staff Review Comments Page 2 of 1 r STAFF REVIEW CUMMENTS No. 2 Project: F~4GLE AVENUE CHURCH OF CHRIST (CUP)-CONDf710NAL USE PERMIT (0-114) PLANNING 1. OK 2. OK 3. 4K 4. OK 5. OK 6. OK ~j N ?. Show location of the water meter. L 8. OK 9. Need 288 square feet of interiar islands. Must have 1 SO sq. ft. of interior islands far 15 interior parking spaces. 10.Ok ~ 0~} e11. Need to show where solid waste container will be located. 12.OK 13.OK 14.OK 15. Under Total Parking Required, list the total parking provided. In addition, the parking spaces at the end of the row nearest the structure need to be redrawn. 16. Give the caliper of the crepe myrtles. At one foot of height, the trunk caliper must measure at least 1.25". 1720. OK NOTE: Eagle Avenue is a minor collector, thus no streetscape is required. Please remove the streetscape calculations from the landscape plans. OT~18i00 10:5 '$`409 764 x496 DEVELOPMENT SVCS X002 Reviewed by' Shauna A_ Laauwe Date: July 17, 2000 Staff Review Comments Page 1 of 1 t .•7!18!00 10:54 $409 764 5496 DEVELOPMENT SVCS f~j005 ~~ ENGINEERING 1. Items 19-24 of StafF Review Comments 1 have been addressed satisfactorily. Before a development permit can be issued an erosion control plan must be submitted and approved- Reviewed by; Ted Mayo ~ ~ s `- ~ ` ~ ;_{ Date: July 18, 2(jD0 ~~/C~l , NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes an these plans that have not been pointed out to the City, will constitute a completely new review. 5ta€f Review Comments Pdge 2 of 1 STAFF REPORT Item: Public hearing and consideration of a Conditional Use Permit, site and use for a religious facility, Eagle Avenue Church of Christ to be located at 1815 Eagle Avenue. (0-114) Applicant: John Rhodes for Stylecraft Item Summary: The applicant is proposing to construct a 2,000 square foot religious facility to be used weekdays and weekends during the day and evenings for various church and related activities. The proposed hours of operation are on Sundays 9-1 lam and 6-7pm and on Wednesdays from 7:OOpm-8:15pm. In addition, afull-time minister will utilize the building Monday through Friday from Sam-Spm. The church currently has approximately 15 members. At this time no daycare or playground usage is anticipated. The church would need to come back to the Planning and Zoning Commission for a new Conditional Use Permit if such usage is proposed at a later date. The proposed church is to be developed on approximately one acre out of a 5.751 acre tract that is currently zoned C-1, General Commercial. The total tract is split into two sections by a 30' Public Drainage Easement. The section to the east, which fronts to State Highway 6, is approximately 3.652 acres and is currently developed as the office, showroom and model homes for Stylecraft Builders. The approximate one-acre to be developed for the proposed church is part of the remaining 2.099 acre section to the west of the easement. The church is reserving the remainder of the section for possible future expansion. The tota15.751-acre tract currently has the same property owner. If a separate owner purchases any of the sections/phases, a replat will be required. The subject property is adjacent to R-1, Single Family to the west and to the south across Eagle Avenue. As stated earlier, Stylecraft Builders has developed the portion of the C-1 tract to the east. The Land Use Plan shows Single Family Residential in this area. Religious facilities are allowed in any zoning district with a Conditional Use Permit granted by the Planning and Zoning Commission. Staff Recommendations: Section 14 of the Zoning Ordinance authorizes the existence of conditional uses. The Commission may permit a conditional use subject to appropriate conditions and safeguards, when after public notice and hearing the Commission finds that: (Staff comments are in italics) 1. "The proposed use meets all the minimum standards established in the ordinance for the type of use proposed." Staff conducted a technical review and found general compliance with development regulations with the exception of items listed in Staff Review Comments #3. 2. "That the proposed use meets the purpose and intent of the ordinance and is in harmony with the development policies and goals and objectives as embodied in the Comprehensive Plan for Development of the City. The request is in compliance with the Comprehensive Plan. 3. "That the proposed use will not be detrimental to the health, welfare, and safety of the surrounding neighborhood or its occupants, nor be substantially or permanently injurious to neighboring property." It is my understanding that the applicant has met with the Homeowners Association regarding the proposed use and site. The public hearing is an opportunity for the Commission to measure the potential impact on surrounding land uses. The Commission may impose additional reasonable restrictions or conditions to carry out the spirit and intent of the ordinance and to mitigate adverse effects of the proposed use. These requirements may include, but are not limited to, increased open space, loading and parking requirements, additional landscaping, and additional improvements such as curbing, sidewalks and screening." A six foot wood fence and a 20' Public Utility Easement currently separate the subject property and the R-1 Single Family Residential. The Planning and Zoning Commission may impose more screening and buffering to separate these two uses. Unless the public hearing brings to light any new information indicating potential negative impacts, Staff recommends approval with the condition that Staff Review Comments #3 be addressed. Commission Action Options: The Commission has final authority over the Conditional Use Permit and associated site plan. The options regarding the use permit are: 1. Approval as submitted; 2. Approval with conditions relating to specific site characteristics or with time limitations; 3. Denial with specified reasons for denial; 4. Table; or, 5. Defer action to a specified date. Supporting Materials: 1. Location Map 2. Application 3. Infrastructure and Facilities 4. Copy of Site Plan 5. Staff Review Comments #3 INFRASTRUCTURE AND FACILITIES Water: Adequate water service is currently provided to the site by a 12 inch water line that runs along Eagle Avenue. Sewer: Adequate sewer service is currently provided to the site by an existing sewer line that runs through the subject property. Streets: The subject property will have adequate access via a driveway onto Eagle Avenue, a local street, that intersects with State Highway 6. Off-site Easements: A 20' Public Utility Easement on the west side of the property separates the C-1 tract with the R-1 Single Family tract. Drainage: All drainage is oriented toward the existing 30' Public Drainage Easement located on the east side of the site. Flood Plain: None. Oversize request: None anticipated. NOTIFICATION: Legal Notice Publication(s): The Eagle; 7-19-00 Advertised Commission Hearing Dates(s): 8-03-00 Number of Notices Mailed to Property Owners Within 200': 28 Response Received: I have had several inquiries. Most callers did not indicate an opinion for or against the proposed church, however I have had three callers who are concerned with potential traffic impacts. STAFF REVIEW COMMENTS No. 3 Project: EAGLE AVENUE CHURCH OF CHRIST (CUP)-CONDITIONAL USE PERMIT (0-114) PLANNING 1. All comments, except #7 have been addressed. The water meter must be located in a public utility easement. This may be done in an existing easement, or one dedicated by separate instrument. 2. Please indicate the scale on the site/paving plan. Reviewed by Shauna A. Laauwe Date: 07/27/00 ENGINEERING 1. Need detail showing installation of fabric (silk) erosion control fence. 2. Fabric erosion control fence also needs to include the site area facing Eagle Avenue. Reviewed by: Ted Mayo Date: 07/27/00 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 1 of 1