HomeMy WebLinkAboutMisc07/01/00 11:59 $409 764 3496 DEVELOPMENT SVCS 1Q.~001
*~* MULTI TRANSACTION REPORT ~~~
TX/RX N0. 2804
INCOMPLETE TX/RX
TRANSACTION OK 96932554
97763089
ERROR
07/01/00 11:57 $409 764 3496 DEVELOPMENT SVCS I~001
~~~ MULTI TRANSACTION REPORT ~~~
TX/RX N0. 2803
INCOMPLETE TX/RX
TRANSACTION OK 96932554
97763089
ERROR
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979) 764-3570 /Fax (979) 764-3496
MEMORANDUM
July 1, 2000
TO: McClure Engineering, Inc., Via fax 693-2554
FROM: Bridgette George, Asst. Development Coordinator
SUBJECT: Steeplechase Phase 5 - Frral Plat
Engineering staff completed their review of the above-mentioned final plat construction
documents as requested. The following page is a list of staff review comments detailing items
that need to be addressed. Please address the comments and submit the following for the plans
to be stamped approved by staff:
Six (6) copies of the revised construction documents; and,
Two (2) copies of the revised engineer's estimate.
If you have any questions or need additional information, please call me at 764-3570.
Attachments: Staff review comments
cc: John Duncum, Brazos Triad Land Development Partnership, Ltd., via fax 776-3089
Case file #00-104
Home of Texas A&M University
~C. ~Ar(:1 I IRF FNif~INFFRINC~ INS
~~~ ---- -
June 6, 2000
Mrs. Natalie Ruiz
Development Coordinator
CITY OF COLLEGE STATION
P.O. Box 9960
College Station, Texas 77842
RE: STEEPLECHASE SUBDIVISION
PHASE FIVE FINAL PLAT SUBMITTAL
Dear Natalie:
Attached please find the following items for the above referenced submittal:
1. Application form
2. Filing Fees of $600.00. (Final Plat Filing Fee: $200.00, Development Permit: $100.00 &
Subdivision Inspection Fee: $300.00)
3. Thirteen (13) folded blueline prints of final plat
4. Two Sets of Construction Plans
5. Drainage Compliance Letter
6. Engineer's Estimate of Construction Cost
It is my understanding that this plat will be reviewed by the Planning and Zoning Commission
on Thursday, July 6, 2000.
Should you have any questions or need additional information, please advise.
Very truly yours,
k~~
ichael .McClure P.E., R.P.L.S.
MRM/rrilrri
attachments
1008 Woodcreek Drive, Suite 103 • College Station, Texas 77845
(979) 693-3838 • FAX (979) 693-2554 • email: mcclure~tca.net
06/21/00 07:12 8`409 764 3496 DEVELOPMENT SVCS I~001
xe~k~k~~xe~kxe~k~k~k%~~k~k~k~k*ski:sk~k~kKS~k~kA~~k~ksk:k~kN~~k*~*
~~~c MULTI TRANSACTION REPORT ~~~
*~k~~kskac~~~k~k~k%~~%~~*~k~k~k~k*~k~sxc~k~~~k~k~ksk~k~%~~k~k
TX/RX N0. 2694
INCOMPLETE TX/RX
TRANSACTION OK 96932554
97763089
ERROR
COLLEGE STATION
P. O. Box 9960 1101 Texas Avenue College Station, TX 77842
Tel: 409 764 3500
MEMORANDUM
June 21, 2000
TO: McClure Engineering, Via fax 693-2554
FROM: Bridgette George, Asst. Development Coordinator
SUBJECT: Steeplechase Phase 5 -Final Plat
Staff reviewed the above-mentioned final plat as requested. There are no comments on
the plat and engineering is still reviewing the construction documents. Those comments,
if any, will be returned later this week. Please submit the following information by
Monday, June 26, 10:00 a.m. to be placed on the next available Planning and Zoning
Commission meeting scheduled for July 6, 2000, 7:00 p.m. in the City Hall Council
Chambers, 1101 Texas Avenue.
Ten (10) copies of the revised final plat; and
The Mylar original of the revised final plat with the owner's signature.
If you have any questions or need additional information, please call me at 764-3570.
Attachments: Electrical & W/WW comments
cc: John Duncum, Brazos Triad Land Development Partnership, Via Fax 776-3089
Case file #00-104
Home of Texas A&M University
McCLURE ENGINEERING, INC.
1008 Woodcreek Drive, Suite 103
College Station, Texas 77845
(409) 693-3838, FAX 693-2554
TRANSMITTAL LETTER
TO: Ms. Bridgette George
Assistant Development Coordinator
CITY OF COLLEGE STATION
We are sending you the following: ®Attached
^ Invoice ®Prints ^ Plans ^ Contractor Invoice
^ Contracts ^ Other
Date: 6/26/00 Proj. #
Attn:
RE: Steeplechase Phase Five
^ Under Separate Cover Via:
^ Bid Books ^ Specifications ^ Change Order
Copies Date Description
10 5/00 Folded blueline prints of final plat
These are transmitted as follows
^ For Approval ^ Approved as Submitted
®For your use ^ Approved except as noted
® As Requested ^ Resubmitted after Revisions
^ For Review Comments ^ Other
REMARKS:
Sets to be approved and returned to me
Copies for your files
Corrected Prints
COPY TO: SIGNED: ry~l -Ic
Michael R. McClure, P.E., R.P.L.S.
President
Steeplechase Subdivision, Phase 5
Engineer's Estimate
.Tune 5.2000
Item
Description
Unit
Quantity Estimated
Total
No. Unit Price
Pavin Construction
1 Mobilization Lump Sum 1 5,000.00 5,000.00
2 Earthwork C.Y. 2,530 3.50 8,855.00
3 1.5" HMAC Surface Course S.Y. 1,994 4.00 7,976.00
4 6" Lime Stabilized Subgrade S.Y. 3,911 3.00 11,733.00
5 Extra Lime Ton 30 80.00 2,400.00
6 6" Crushed Limestone Base S.Y. 1,994 5.50 10,967.00
7 Concrete apron S.Y. 1,354 33.50 45,359.00
8 Type 1[I Curb and Gutter L.F. 1,473 6.50 9,574.50
9 4" Sidewalk S.F. 3,733 2.50 9,332.50
Paving Subtotal 111,197.00
Drainage System Construction
10 18" Reinf. Concrete Pipe, Str. Backftll L.F. 31 31.00 961.00
11 24" Reinf. Concrete Pipe, Str. Backftll L.F. 268 36.50 9,782.00
12 5' Curb inlet EACH 2 2500.00 5,000.00
13 Remove plug & connect to 24" RCP EACH 1 200.00 200.00
14 Silt Fence L.F. 1,160 2.00 2,320.00
15 Inlet Protection EACH 4 25.00 100.00
16 Trench Safe storm drain L.F. 299 0.50 149.50
Drainage Syst em Subtotal 18,363.00
Water System Construction
17 6" PVC Water Line, Str. Backftll L.F. 318 22.00 6,996.00
18 6" PVC Water Line, Non-Str. Backftll L.F. 792 15.50 12,276.00
19 Fire Hydrant Assembly EACH 1 1800.00 1,800.00
20 6" Gate Valve EACH 1 400.00 400.00
21 6"x 13" Anchor Coupling EACH 1 100.00 100.00
22 6"x 45 degree bend EACH 4 100.00 400.00
23 6"x 1.5" tapped tee EACH 1 150.00 150.00
24 Remove plug & connect to existing pipe EACH 2 200.00 400.00
25 1.5" Water Ser. >l0 ft (avg. = 37 ft.) EACH 9 700.00 6,300.00
26 1.5" Water Ser. <10 ft (av . = 9 ft.) EACH 2 450.00 900.00
27 1" Water Ser. >10 ft (avg. = 50 ft.) EACH 1 550.00 550.00
28 Trench Safe water line L.F. 710 1.00 710.00
Water System Subtotal 30,982.00
Sewer System Construc tion
29 6"PVC, D-3034, Str. Backftll L.F. 709 34.00 24,106.00
30 6" PVC, D-3034, Non-Str. Backftll L.F. 314 16.50 5,181.00
31 6" PVC, D-2241, Str. Backftll L.F. 10 35.50 355.00
32 6" PVC, D-2241, Non-Str. Backftll L.F. 10 17.50 175.0
33 Standard Manhole, 0-6 ft. deep EACH l 1100.00 1,100..
34 Standard Manhole, 6-8 ft. deep EACH 4 1300.00 5,200~fl
e
35 Connect to existing manhole EACH 1 400.00 400
36 4" Sewer Service < 10 ft. (avg. = 7 ft.) EACH 7 200.00 1,400.
37 4" Sewer Service > 10 ft. (avg. = 46 ft.) EACH 12 750.00 9,000.
38 Trench Safe sewer line L.F. 1,043 1.00 1,043.00
Sewer System Subtota l 47,960.00
Total Construction Cost 208,502.00
,~~~~`~t
s
.i""~E OF T qty
5~... ..,-v~, t8A
i ~a* o
..w..eo. . ssu~anew~~o~
IICNAEL Fl. c~~"^C'I ~.~?""
~~~,
i :9~
`'` .'~.~,` 1~.
€„~ ;,.;r' 1A
~, ~ 0
~I!<
fateeple/p5/excel/estimate and proposal
McCLURE ENGINEERING, INC. /~~~~
1008 Woodcreek Drive, Suite 103 ,~? ~~ ~~
College Station, Texas 77845
(979) 693-3838, FAX 693-2554
TRANSMITTAL LETTER
TO: Mrs. Natalie Ruiz
Development Coordinator
CITY OF COLLEGE STATION
We are sending you the following: ®Attached
^ Invoice ^ Prints ^ Plans ^ Contractor Invoice
^ Contracts ®Other
Date:
Attn:
RE:
10/13/00
Proj. #
Steeplechase Subdivision, Phase Five
^ Under Separate Cover Via:
^ Bid Books ^ Specifications ^ Change Order
Copies Date Description
1 5!2000 Mylar Original of Final Plat to be filed for record
These are transmitted as follows
^ For Approval ^ Approved as Submitted Sets to be approved and returned to me
®For your use ^ Approved except as noted Copies for your files
^ As Requested ^ Resubmitted after Revisions Corrected Prints
^ For Review Comments ^ Other
REMARKS:
COPY TO: SIGNED: ~/I~~ ~~
Michael R. McClure, P.E., R.P.L.S.
President
r
FACSIMILE COVER SHEET
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979)764-3570 /Fax (979)764-3496
Date: June 21, 2000 # of pages including cover: 2
Ifyou did not receive a complete fax, please call our offce immediatelyfor a new transmittal.
TO: Mike McClure,~Tohn Duncum FAX: 693-2554776-3089
COMPANY: McClure En ing Bering, Brazos Triad Land Dev. Partnership
RE: Steeplechase Ph. 5
FROM: Bridgette George PHONE: (979)764-3570
COMPANY: City of College Station
REMARKS: ^ Urgent ^ For your review ^ Replay ASAP ®FYI
I'm not sure if the you received the following comments yesterdax, so I'm
refaxing them today.
Thank, Brid„~ette
06/21/00 11:09 '$409 764 3496 DEVELOPMENT SVCS I~001
~~~ MULTI TRANSACTION REPORT ~~~
TX/RX N0. 2705
INCOMPLETE TX/RX 97643570
TRANSACTION OK 96932554
ERROR
06/21/00 15:46 '$`409 764 3496 DEVELOPMENT SVCS
~ ool
~xx~:x~:~~x~~c~~c~~e~xc~c~sxc~:~csk~xc~cxc~c~c~c
~~~ ACTIVITY REPORT ~c~c~c
~c~~c~c~:~xc~~~~c~~~~~s~~~~~~~~c~~~
TRANSMISSION OK
TX/RX N0. 2717
CONNECTION TEL 97763089
CONNECTION ID BOSSIER CHRYSLR
START TIME 06/21 15:46
USAGE TIME 00'42
PAGES 2
RESULT OK
~~ ~~~~~
Filed for Record in:
t~[NVtY,
an: act 19, R at t~3:38PfM
Q5 d
pIatS
Dpocwtent Nuabe~t t1Tc'~
Rsount
55. ~
Receipt Nu~6er - 16t~769
BY,
Flo Workran
S1~ItE ff 1E~ i~iilt ~
I hereby certify that this in~trulent Mas
filed on the date dnd the ~tdlped hereon by le
and gas duly recorded in the volute and page
of the Haled recordf af;
B(~~S (~lR(f Y,
a5 ~td[ped hereon hY le.
QC's f ~! _~~~
<.
i
I~NLE MARY 1~1 ~}, C~lTY ~(
B1~taS fAlgiTY,
MAR--06-2001 TUE 04 ~ 35 PM C, S, PUBLIC WORKS FAX N0, 9797643489 P, O 1
/~~~~ ~~ ~3~9~
02/08/2001 THU OJ:41 FAx 0001/001
FILE Ne.388 02108 '01 Ph Q2:38 tD~Y0l1NC CONTACTORS FAXi9788$32'767 PAS 2
LFTTEB QF COMPLETION ' ~, C
CITY Z;:1C}INIiBIt UATtL:
CITY O[~ COLLI~G~ ST:ITIUN -~
r70LLL[7T~ 9T,~TIOIJ, TLa~CA9
kL: CUMPLZ,:TIVN U6 ..,,,, ,
.,..s~f~£A ~ SP Ti~1ti3.0
Dour Slri
T1~r pc~cp~sN~ of our luet.ur ix eay rr~+~iti,i,~~ ch«t ``' ' . ~: ;R li~wct imNrravMmant~ Ise +-ppre-v+arl
end s1~•~:a15t:c~rt RN 1:u1nc~ Ci111RtYLCL(ici uit+,lur pity in+spc~ti~ri tend totnplacad nccnrdinr cn piurtu
end ep+l+,;~i~~:ltiona ~a Zpi~rc5~e+i +~ncl re~,~ulred by thu City ~t1('+~11~Q~ betitSnn.'l'c~xad. 'Cl~iy
Ai5p1UVt11 tlfid Al'OQlntllnnil by ~il<< Cit_r i.ti ~aqt+~acac{ !R nrtl4r Chile w~ ma+' linulizo un~- Nul+•
uuntencts +]1lc~ to :l!'flrm th~cr ~vnrranty o~ Gh~ wot}c, T1ue ~tppt'nval and r~ecAprQtlCd b~' nc~!
(;it;.• ~~)f cl1c: imptovements listed belo«• noes htiraby void cha lat.Cmr o!' Kunrunt~M fnr chc
linrc=d improvements nn thc~ sbovc~ reierNn~:e prejeeL,
Thy +sno year wurrroltiLy i~ hurhY ut'6r+i~~d ncsd ngro.d Pp t~v ~1Qt.c Ca~-~rr~~nrs ,z+t~f
by Chair eicU-~;nner~+;tAr' nca iucliotsr,e;1 by ~i0nmcuc'+es below.
~YOI;K cOM ~ ,ET i.D
,s~'c~F~' ~aLK~
_~~f~~ ice....--
-. 5.~~ cd~~.(,..Lh.~° ..._-
f~~.j i~
(3wnr.r; I f ~~'~~u~W~Lr'I
~+~n c ~s ~ p 1..4D ~ q
~tl~{ros~; ,...__._.~L_ t~I Ea~t.L euclc,~tc f"~"~'!
~wa~
bi~n.~curt .,
DATt4
~~e1~~a~
~ 1~ .
,.., ~
+~ntr:ccsc~r: ,~ ~~h(,.
_ 3~~.~ ~ ~~ eon
~fL;tl~liurc!:
..-~._
li 'ly Rcpreaeil~rlliaa
~-CCEPTANCE d~ APPItOVA1..
` ~ li ~ 1
Ctly n,Qlrrttr
„~. ,
. Mp-'~ -1.~~
MAR-06-2001 TUE 04 35 PM
Mar 06 O1 03:57p
March b, 2001
C, S. PUBLIC WORKS
Michael Mc lure
McCLURE ENG NEERING.
Mr. Bob Mosley, P.E.
City Engineer
CITY OF COLLEGE STATION
P.O. Box 9960
College Station, TX 77842
RE: Steeplechase Subdivision, Phase S
Reinfoneed Concrete Pavement
Dear Bob;
FAX N0. 9797643489
~'/~ ass-caa~
INC.
P. 02
p. L
Please be advised that I have revic ed the following data, construction procedures and remedial
efforts provided to me by your office and Y ung Contractors, Inc. relative to the placement of reinforced
concrete pavement at Steeplechase Phase S:
1. Concrete cylinder compression t
2. Concrete core measurements an~
3. The minimum City Specification
4. City initiated revisions to the exl
5. Project construction drawings ~
6. The limits of concrete removal
knuckle portion of the cast cuid~
culdesac were removed and real
I concurthat the areas not meeting mi
I believe that the concrete pavement
of College Station Standards and Specific
No. 30?) and therefore should be formally a
Should you have any questions,
very truly yours,
•~~-w
Mi 1 R. McClure, P.E., R.P.L.S.
MRMlmlm
it data.
compression test data.
or concrete pavement in a residential area.
~nsion joint pattern shown on the plans.
I concrete spedfications.
~d replacement as completed by the Contractor. (The entire
sac and the most westerly portion of the knuckle in the south
:ed,)
strength requirements have been properly reconstructed.
;e today meets or ezceed~ the current minimum City
for residential pavement construction (Specification
sd for City ownership.
do not hesitate to call me.
1008 Woodcreak Drive Suite 103 • College Station, 7ezas 77845
(979) 6933838 ^ FAX 979) 693-2664 • email: mcclure®tca_noi
h1AR~ 06-2001 TUE 04 ~ 35 PM C, S, PUBLIC
h1Lt No.li~'t U~iUEi 'U1 Nf3 1~~43 1ll~YUl1NG
~ YOUNG C
PHONE IOG/7T9-1112
v,o. Dox e~•
MArC11 fi. 2OUI
WORKS FRX N0, 9797643489
ONTAC i l1KS I-H1S ~y'ly2SGSGlyr
NTRACTORS, i NC.
FAX X09'81,5-2787
AY~N, TExA3 71I10lI ~1lCt W. ST4TE NWY. 11
Cily Of ColiogC Slxlion
!?ngincering Dcparuncm
' P,O, Box 99C{)
College Stltiion. Tc~tts, 77842
17x1%: 7b4-~48~J
Atlc~ntion: htr. Ftnborl rvto,lcy
Rcfcrcllce: Stccplcchasc Phssc 5 Subdivisi tt
W;i,rrnn(y Fxtcttsiv+>i For Concr tc P;1Ying
Uear Mr. Moslor,
This letter is to ucknowlcdKc Young Contl clots ogreentient to extend tilc stl+ndatd one-yettc wt+rranty to
two years in re~lyds to the cnncretc paving according to the rylindcr test that wcrs ttlktn, shat did ttol
tuo~t 3,opu psi cornpressive strength Ul 28 ays. 's'hank ,you ,for your anentlun to this mattet~.
Sirtccroly,
Keith J, Plarsotl
YUUng COnIrACIAtS, Ino,
P, 03
rr1u~ t
CITY OF COLLEGE STATION
REPRINT
OPER: NFORD CUSTOMER RECEIPT +~~
DATE: 6/05/00 0A~ DRAWER: 1
RECEIPT: 0234897
DESCRIPTION OTY AMOUNT TP TM
2000 104 1 5200.E ^PL CK
PLANNING & ZONIN CK:
2000 500047 1 5400.00 +PLS~
PLANNING & ZONIN CK: 5050
TENDER DETAIL
CK 5600.00
DATE: 6/060 TIME: 15:12:22
TOTAL PERSONAL CRECK 5600
AMOUNT TENDERED ,~
TNANK YOU
~~ /'
~~ ~~~~ ~~
~ s ohs ~~
~a