Loading...
HomeMy WebLinkAboutApplicationsFOR OFFICE USE ONLY ~P&Z CASE NO.: C}- DATE SUBNIITTED:_~ 3 oc~o PM FINAL PLAT APPLICATION (check one) Minor Amending XX Final Vacating Replat The following items must be submitted by an established filing deadline date for P & Z Commission consideration. 11~IVIMUM SUBMITTAL REQUIREMENTS: /XX Filing Fee of $200.00. Development Permit Application Fee of $100.00 (if applicable). Infrastructure Inspection Fee of $300.00 (applicable if any public infiastructure is being constructed.). _~ Application completed in full. ~. Thirteen (13) folded copies of plat. (A signed mylar original must be submitted after staff review.) One (1) copy of the approved Preliminary Plat and/or one (1) Master Plan (if applicable). XX Paid tax certificates from City of College Statioq Brazos County and College Station I.S.D. XX A copy of the attached checklist with all items checked off or a brief explanation as to why they are not. ~ Two (2)copies of public infrastiuctitlre plans associated with this plat (if applicable). APPLICATION DATA NAME OF SUBDIVISION STEEPLECHASE, PHASE FIVE' SPECIFIED LOCATION OF PROPOSED SUBDIVISION Bounded by Navarro Drive to the northwest, .~'i'PPn~ PC`}1r7Ge Phase Six to th _ srn~thwe~i-, Snt~thwcXX~ V~1 1 eY S i On to the so ~ 'least nd West Ridge Subdv, to the northeast APPLICANT/PROJECT MANAGER'S INFORMATION (Primary Contact for the Project): Name Brazos Triad Land Development Partnership, Ltd. Attn: Mr. John Duncum, Gen. Partn Street Address 301 North Earl Rudder Freeway Ciry State TX Zip Code Phone Number 823-8111 Fax Number Bryan, TX 77802 E-Mail Address PROPERTY OWNER'S INFORMATION: Name Same as above 776-3089 Street Address State Zip Code Phone Number City _ E-Mail Address Fax Number ARCHITECT OR ENGINEER'S INFORMATION: Name McCLURE ELVTGINEERING, INC. Street Address 1008 Woodcreek Drive City College Station State ~ Zip Code 77845 E-Mail Address mcclure@tca.net Phone Number 693-3838 Fax Number 693-2554 FINAL PLAT APPLICATION 1 of 3 FNLPAPP.DOC 3/25/99 +TOTAI. ACRES OF SUBDIVISION 7.558 Ac. R-0 W ACREAGE 1 .27 Ac. TOTAL # OF LOTS 35 NUMBER OF LOTS BY ZONING DISTRICT R-1 / 35 / / AVERAGE ACREAGE OF EACH RESIDENTIAL LOT BY ZONING DISTRICT: R-1 / 0.18 Ac. / / / FLOODPLAIN ACREAGE none PARKLAND DEDICATION ACREAGE OR FEE AMOUNT A STATEMENT ADDRESSING ANY DIFFERENCES BETWEEN THE FINAL PLAT AND APPROVED MASTER DEVELOPMENT PLAN AND/OR PRELA~IINARY PLAT (IF APPLICABLE): REQUESTED VARIANCES TO SUBDIVISION REGULATIONS & REASON FOR SAME REQUESTED OVERSIZE PARTICIPATION TOTAL LINEAR FOOTAGE OF PROPOSED: qA 7 L F STREETS 928 L.F. SIDEWALKS 1042 L.F. SANITARY SEWER LINES 1100 L.F. WATER LINES 0 CHANNELS 299 L.F. STORM SEWERS ~ BIKE LANES /PATHS NOTE: DIGITAL COPY OF PLAT (IF APPLICABLE) MUST BE SUBMITTED PRIOR TO FILING. The appliamt has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true, correct and complete. The undersigned hereby requests approval by the City of College Station of the above identified frnal plat. 'e~ ~oJ~~T ~~/~cJE~ i i aiure Title ~/G/Oll Date F[NAL PLAT APPLICATION 2 oC3 FNLPAPP.DOC 3/25/99 SUBMIT APPLICATION APID TffiS LIST CAD oFF wrrII I3 FOLDED COPIES OF PLAT FOR REVIEW FINAL PLAT MINIMUM REQUIItEMENTS (ALL CITY ORDINANCES MUST BE MET) INCLUDING BUT NOT LIlVIITED TO THE FOLLOWING: (Requirements based on freld survey and marked by monuments and markers.) 1. Drawn on 24" x 36" sheet to scale of 100' per inch or larger. 2. vciniry map which includes enough of surrounding area to show general location of subject property in relationship to College Station and its City Limits. No scale required but include north arrow. ~ 3. Title Block with the following information: ~' Name and address of subdivider, recorded owner, planner, engineer and surveyor. ~ Proposed name of subdivision. (Subdivision name & street names will be approved through Brazos County 911.) (Replats need to retain original subdivision name.) ~ Date of preparation. Engineer's scale in feet. Total area intended to be developed. 4. North Arrow. ~ 5. Subdivision boundary indicated by heavy lines. tf1l~-~ 6. If more than 1 sheet, an index sheet showing entire subdivision at a scale of 500 feet per inch or larger. 7. All applicable certifications based on the type of final plat. L~ Ownership and Dedication ~ Surveyor and/or Engineer C~ City Engineer (and Ciry Planner, if a minor plat) ~ Planning and Zoning Commission (delete if minor plat) ~ Brazos County Clerk Brazos County Commissioners Court Approval (ET'J Plats only) ®~ 8. Paid tax certificates. U~~ 9. If submitting a replat where there are existing improvements, submit a survey of the subject property showing the improvements to ensure that no encroachments will be created. N~`" 10. If using private septic systems, add a general Holton the plat that no private sewage facility may be installed on any lot in this subdivision without the issuance of a license by tbe Brazos County Health Unit under the provisions of the private facility regulations adopted by the Commissioner's Court of Brazos County, pursuant to the provisions of Section 21.004 ofthe Texas Water Code. f\'1~ 11. Location of the 100 Year Floodplain and floodway, if applicable, according to the most recent available data. 12. Lot corner markers and survey monuments (by symbol) and clearly tied to basic survey data. FINAL PLAT CHECKi.rST 1 oC2 FNLPCKDOC 0325/99 ~ '' 13. Matches the approved prelimuiary plat and/or master development plan. 14. The location and description with accurate dimensions, bearings or deflection angles and radii, area, center angle, degree of curvature, tangent distance and length of all curves for all of the following: (Show existing items that are intersecting or contiguous with the boundary of or forming a boundary with the subdivision, as well as, those within the subdivision). Exist Pro~sed Streets. Continuous or end in a cul-de-sac, stubbed out streets must end into a temp. turn around unless they are shorter than 100 feet. 8'i ~~ Public and private RO.W. Locations and widths. (All existing and proposed RO.W.'s sufficient to meet Thoroughfare Plan.) Q- t`7- Street offsets and/or intersection angles meet ordinance. ~' ~'~ Alleys. ~- ®' Easements. ~' ~'~ A number or letter to identify each lot or site and each block. r1~ ~" Greenbelt area/park linkages/parkland dedication (All proposed dedications must be reviewed by the Parks and Recreation Board prior to P & Z Commission consideration.) ~" 15. Construction documents for all public infrastructure drawn on 24" x 36" sheets and properly sealed by a Licensed Texas Professional Engineer that include the following: ~'- Street, alley and sidewalk plans, profiles and sections. One sheet must show the overall street, alley and/or sidewalk layout of the subdivision. (may be combined with other utilities). 0~ Sanitary sewer plan and profile showing depth and grades. One sheet must show the overall sewer layout of the subdivision. (Utilities of sufficient sizeldepth to meet the utility master plan and any future growth areas-) ~~~ Water Line plan showing fire hydrants, valves, etc. with plan and profile lines showing depth and grades. One sheet must show the overaII water layout of the subdivision. (Utilities of sufficient sizeldepth to meet the utility master plan and any future growth areas.) Storm drainage system plan with contours, street profile, inlets, storm sewer and drainage channels, with profiles and sections. Drainage and runoff areas, and runoffbased on 5, 10, 25, 50 and 100 year rain intensity. Detailed drainage structure design, channel lining design & detention if used. One sheet must show the overall drainage layout of the subdivision. [~ Detailed cost estimates for all public infrastructure listed above sealed by Texas P.E. ~~,Drainage Report. pp~~ Erosion Control Plan (must be included in construction plans). ~~ 16. All off-site easements necessary for infrastructure construction must be shown on the final plat with a volume and page listed to indicate where the separate instrument easements were filed. Separate instrument easements must be filed prior or concurrently with Final Plat. [~ 17. Are there impact fees associated with this development? O Yes ~No Impact fees for R-1, R-2, & R 3 zoned final plats, must be paid prior to filing. ~ 18. Will any construction occur in TexDOT rights-of--way? ^ Yes ~No If yes, TexDOT pernut must be submitted along with the cooshuction documents. NOTE: --- 1. We will be requesting the corrected Final Plat to be submitted in digital form if available prior to filing the plat at the Courthouse. If the construction area is greater than 5 acres, EPA Notice of Intent (N01) must be submitted prior to issuance of a development permit. FINAL PLATCHECKLISr 2 oC2