Loading...
HomeMy WebLinkAboutStaff ReviewSTAFF REVIEW COMMENTS No. 1 Project: RAMSEY TWINS SUBDIVISION (FP) (0-96) 1. Why do the metes and bounds differ from the preliminary plat to the final plat? Was the prelim. from deed and final from survey? Reviewed by: JESSICA JIMMERSON Date: 31-May-00 J:\PZTEXT\PZ03169.DOC Page 1 of 1 ELECTRICAL COMMENTS Project: RAMSEY TWINS SUBDIVISION (FP) (0-96) 1. Developer installs conduit per city spec and design. 2. Developer responsible for providing a 10' easement along West Side of property, and additional easements to cover all primary electrical lines and equipment. Reviewed by: Jennifer Reeves Date: June 1, 2000