HomeMy WebLinkAboutMisc.Page 1 00-~3 From: Bob Mosley To: Bridgette George; Deborah Grace Date: 5/7/01 1:16PM Subject: Edelweiss The previously uncompleted portion of Phase 14 (detention and drainage flume) has now been completed and the financial guarantee can be returned. The estimate for uncompleted work on Phase 16 received by fax today accurately reflects the remaining work to be completed. The estimate did not include lime stabilization of the subgrade which has been completed. In the past we have not given partial credit for this because, without being paved and sealed, exposure to the elements will necessitate rework of the subgrade if not paved within a short period of time. CC: Vern Wright Bridgette George -New Development Page 1 From: Jennifer Reeves To: Bridgette George Date: 4/14/00 7:59AM Subject: New Development Week of 4/7/00 The Tradition at Northgate:(00-63) Developer responsible for installing conduit per city spec.and design. Developer responsible for providing easements to cover all Primary Electrical Lines and Equipment. The Tradition at Northgate: (00-65) Developer responsible for providing easements to cover all Primary Electrical Lines and Equipment. The Tradition at Northgate: (00-65) Developer responsible for providing easements to cover all Primary Electrical Lines and Equipment. The Tradition at Northgate: (00-66) Developer responsible for providing easements to cover all Primary Electrical Lines and Equipment. Kappa Kappa Gamma Sorority: (00-67) Any changes to existing Electrical service load, Developer will need to contact College Station Electrical Division. Fazoli's Restaurant: (00-68) Developer is responsible for installing conduit per city spec. and design, There will need to be 3-4" conduit's going to the building. Developer is responsible for providing and installing 30 x 30 Lockable CT-Can. City will provide service from transformer to building. If voltage is 208, meter will go on building, if voltage is 277, Developer needs to contact us ASAP, and meter will go on Transformer. Jefferson Commons: (00-70) Developer responsible for installing conduit p er city spec.and design. Developer responsible for providing easements to cover all Primary Electrica l Lines and Equipment. Williams Addition: (00-71) Developer responsible for installing conduit per c ity spec.and design. Developer responsible for providing easements to cover all Primary Electrica l Lines and Equipment. Developer will need to provide: Digital Site Plan & Temporary Blanket Easem ent as soon as possible. Edelweiss Estates Ph. 14 : (00-73) Developer responsible for installing con duit per city spec.and design. Developer responsible for providing easements to cover all Primary E lectrical Lines and Equipment. Developer responsible for installing street lights per city spec. an d design. Developer needs to provide digital site plan as soon as possible. --~ Edelweiss Estates Ph. 16 : (00-72) Developer responsible for installing conduit per city spec.and design. Developer responsible for providing easements to cover all Primary Electrical Lines and Equipment. Developer responsible for installing street lights per city spec. and design. Developer needs to provide digital site plan as soon as possible. Jennifer Reeves Electrical Division/Planning & Projects Assistant Tel: (979) 764-3502 Fax: (979) 764-3452 Mobile: (979) 777-1925 From: "Kent Laza" <klaza@tca.net> To: "Jeff Tondre" <jtondre@ci.college-station.tx.us> Date: 5/23/00 11:31 AM Sub'ect: Edelweiss Phase 14 and 16 ~ ~ ~ ~~ C_~ Jeff, / ~' `^'~//1~ Steve Arden has asked that we only build Phase 14 at this time until he can evaluate the effects of recent increases in the prime interest rate. This will require some modifications to the way we terminate Von Trapp Lane where it intersects with Hanover Street. Mike and I discussed two options: 1. A temporary turn-around that would be removed when Phase 16 is built, or 2. Construct the Von Trapp/Hanover intersection with this phase. Option 2 would require service vehicles to make a hammerhead turn on that street, but would lessen the wasted cost. Do you have any preferences or requirements? Also, in Phase 16 there is a water line connection to the 30" line on Wellborn Road. Would the city allow us to build Phase 14 without this connection or does it need to be part this project? Would a modeling study be required to show that it is or isn't needed at this time? We would appreciate your input on these two matters before we begin modifications to our plans. Thank you. Kent ~~MM Y ` `' Y [`~ _ .. S-a~- _~'~ ~ ~j-~.~ 5~ ~ ~f~~~ ~',~ !lam rl~~ ~-sa.eL /`' ~C/C~~J~ ~. ~/iL' r/ l ~On/C~ ~ l/~/~-T C.v-y~s~-~ /~ ~ ~~» ~~