Loading...
HomeMy WebLinkAboutStaff ReportsSTAFF REPORT Item: Consideration of a Preliminary Plat of approximately 15.162 acres for the Jefferson Commons at College Station Subdivision located at 819-903 Krenek Tap Road. (0-70) Applicant: Kling Engineering for JPI Student Housing Item Summary: The subject tract is currently unplatted. A plat is now being submitted for future development of an apartment complex. The property is shown on the Land Use Plan as Single Family Residential -Medium Density, however, the tract was recently rezoned to R-5, Apartment Medium Density on March 9, 2000 based on higher density residential development patterns in the area. The proposed lot meets the zoning requirements. The parkland dedication requirement will be accomplished through fees in lieu of land dedication/development. The fee will be calculated based on the number of dwelling units proposed. The subject property is located adjacent to the forthcoming Dartm The extension is currently under design and construction is schedi 2000 with an estimated completion date of January 2001. The ext feet ofright-of--way with 74 feet of road section. Dartmouth Drive minor arterial on the Thoroughfare Plan, the same as Harvey Roac Krenek Tap Road is classified as a minor collector. Due to the mi classification of Krenek Tap, any proposed development will neec from the higher designated Dartmouth extension. outh Drive extension. sled to begin in June ension is to have 90 is classified as a l and Holleman Drive. nor collector l to take primary access Item Background: The subject tract and the surrounding area was annexed into the City in 1971. The subject property has remained undeveloped and in its present configuration since the time of annexation. Staff Recommendations: Staff recommends approval of the preliminary plat. Commission Action Options: The Commission has final authority over the preliminary plat. The options regarding the preliminary plat are approval as submitted or denial. Defer action or table only at applicant's request. Supporting Materials: 1. Location Map 2. Application 3. Infrastructure and Facilities 4. Copy of Preliminary Plat INFRASTRUCTURE AND FACILITIES Water: An 8" water line currently exists along Krenek Tap Road. The plat also shows the extension of the 12" line that is parallel to the upcoming Dartmouth Drive extension. Sewer: Adequate sewer is available to the subject property via a 12" line that currently exists along Krenek Tap Road. Streets: A 10' Public Utility Easement has been dedicated along Dartmouth. Off-site Easements: Not required. Drainage: The site will be required to meet the Drainage Ordinance at the site plan stage. Flood Plain: None. Oversize request: No oversize participation is anticipated. Impact Fees: None NOTIFICATION: Legal Notice Publication(s): None Required.