Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Correspondence
0;11B12ee1 15:09 C S C 409-77E-0E20 CSC ENG & ENV PAGE 01 i7'ACCiMii ri TT?ANC1-diTTtl e[7as TO: FROM: Mr. Spencer G. Thornpsor-, Jr. Rick Conlin COMPANY: DATE: City of College Station Development Staff Thursday, 18th January 2001 FAX NUMBER: TIME: (979) 76434% 2:44 PM PHONE NUMBER: TOTAL NO. OF PAGES INCLUDING COVER: (979) 764-3570 7 RE: PROJECT NUMBER: Transmittal of Calculations of Peak 10008b-120 Domasdc Water Usage Rates for Courtyard Marriott at Wood Creak Project ^URGENT ®FOR REVIEW ®PLEASE COMMENT ^ PLEASE REPLY ^ PLEASE RECYCLE NOTES/COMMENTS: Dear Spenoar, Attached are the water quatttiry cal~lations for the Courtyard Marriott at Wood Creek development that we discussed today. Please call if you have any gaestio~s. a~EV!IEWED FOR Kindest regards, _ Rick .~~N2220 C(7L I~ta~w ~:;~ ~ ~ 4 ~I~i'v~ E GINEERING 3407 Tabor Road Phone (979)778-2810 Bryan, Texas 77808 Fax {979) 778-0820 0118/2001 15:09 409-778-0820 CSC ENG & ENV C Ci January 18, 2001 Mr. Spencer G. Thompson, Jr., Graduate Civil Engineer City of College Station Development Services Department P.O. Box 9960 110 i Texas Avenue College Station, TX 77842 Re: Submittal of Calculations in Support of Revised Domestic Water Demand Quantities Courtyard Marriott at Wood Creek Project Wood Creek Drive at State Highway 6 in College Station, Texas Dear Mr. Thompson: PAGE 02 CSC Engineering & Envirotkmental Consultants, Inc, (CSC) had earlier submitted a letter to the Ciry of College Station (City) revising the domestic water demand quantities for the proposed Marriott Courtyard at Wood Creek Development in College Station, Texas. A copy of that earlier letter dated December 11, 2000 is attached to this letter for ease of reference. In subsequent telephone conversations you indicated that the City would likt to have supporting documentation for the fixture unit calculations cited in the referenced letter, This letter transmits the requested calculations. Attached is a letter dated January 18, 2001 from Mr. Matthew Hicks of Swoboda Engineering, the mechanical/plumbing consultant for the project. Mr. Hicks' letter contains a table summarizing the types and number of fixture units (FU) employed in the calculation of the total F'U count of 1,343 FUs. That total FU count was used to determine the peak domestic water flow in gallons per minute (gpm} for tlxe proposed hotel development. The peak domestic water flow was determined using the total FU count along with Table II -WATER DEMAND BASED ON FIXTURE UNITS {Page 4-7) of the draft joint Bryan/College Station ' Destgrt Manual for Streets and Alleys, Storm Drairra~e, Domestic Water, and Sanitary Sewer (revised 1/29/98), and was also determined using a similar Figure F102 in the Standard Building Code. A pedk domestic water flow of 251 gpm was calculated and is indicated both in Mr. Hicks letter and the CSC letter,of December 11, 2000. We trust that this prcsdntarion~~~and explanation of the calculations used to determine the peak domestic water flow meets the City's re uirernants. Please do not hesitate to contact us should any questions arise or if additional supporti~tg do~ct~tnentation is necessary. ;~ ~I: ;, -- 3407 Tabor Road Phone {878) 778.2810 6ryan. Tsxes 77808 Fez (979) 778-0820 0111E/2001 15:09 409-77E-0E20 CSC ENG & ENV S . C Mr. Spencer G. Thompson, Jr. Page 2 January l8, 2001 CSC appreciates the opportunity to work with the City's development staf let us know if any additional information is required. Kindest Regards, ~' !,` y~ ~ .~ 5; .; 9~, { ...• *. M. Frederick Conlin, Jr., P.E. o ~'•"""""""""' ~~ Senior g /, M ;F. CONLIN, J En ineer .... ..... MFC:mE ,,j9; dgggl'lt~, . ~~ Via: Fax and U.S. Mail Ito•" 9 ~~.•'•~~'S ,r.-. FGA a 1 F'••., STE ... ~~~ I~t~ ONAL ~N6`r Robert L. Payne 8t Associates `O°~~ Swoboda 1 X09 Emerald Parkway, Suite 104 7010 Coy College Station, TX 77845 Bryan, T~ Attention: Mr. Robert L. Payne, AIA Attention: Via: Fax and U.S. Mail Via: U.S. Peters Canstruetion Company 29b0 Fairview Drive P.O. Box 99 Owensboro, KY 42302 Attention: Mr. Dennis Bates, Project Manager Mr. Chris McCarthy Via; U.S. Mail PAGE 0~ on this project. Again, please to Run 77808 sir. Matthew Hicks, P.E. 2 ~1118I2001 15: D9 4©9-?7~-©82© +-: •--~ TI' ,~ -...,. January I8, 200I i Mr. Frederick Conlin CSC EttQlnoerittg & Fnviranrt~eutnl Consultants 3ao~ ?3bor Road Bryan..t.X 77sos Re: Courtyard Marriott Plumbing Load Mr. Conlin, CSC ENG ~ ENV PAGE D4 - -.., ~ o - u i ~ 0: 4 TAM; ..._~_,--~_ Rage 2/3 Attached ig s su~ry of fixture unit calculatiot~ ~~sod for the, t'o ~utyard Marriot project per your request. I7u tst~mary ddaiJe tlx number of fixtures u_gcd and the )o~td vrilues assigned W each fixtucz. I used pubic Instal}anon load values fur this building, If the City of C~~Ilege Stt~tion boliev~es we should cnnside< this as a private installation,, the secorjd co}~unn of figtuza in the Extended Crtleululiun of Water Supply Fixture tltiit, wlvmn should ba used to dttortnine the peak load fat tfie building. sincerely, /~ /~ Matthew Hicks p,ww RI[',!~inac ,ROOEIT f~1'~ sae E~111EI2001 15:09 409-77E-0E20 CSC ENG & ENV PAGE 06 S C. December 11, 2000 Mr. Spencer G. Thompson, Ir., Graduate Civil Engineer City of College Station Development Services Department P.O. Box 99b0 1 I OI Texas Avonue College Station, TX 77842 Re: Revised Domestic Water Demand Quantities Courtyard Marriott at Wood Creek Project wood Creek Drive at State Highway 6 in College Station, Texas Dear Mr. Thompson: This letter documents changes in the domestic water demands Environmental Consultants,lnc. (CSC) for the proposed Marriott Cc in College Station, ?axes. In a telephone conversation of December 1, 2000, the project architect, Mr. Payne & Associates, telephoned to inform us that some of the domestic wa1 t17c above-referenced project should be revised based upon newly develo flows were estimated for both "normal" domestic demand and for irrigati were presented in tabular form on Sheet C-1 of the site drawings that have City of College Station for review, ed by CSC Engineering c~ at Wood Creek Development Ebert L. Payne, AIA of R. L. flows estimated by CSC for j information. Those water flow. The estimated flows •eady been submitted to the Basically, the revised estimates in the water demand are required because more extensive design work has been performed to better define the water demands for the project. For example, at the time that the site drawings were submitted for, review, no detailed design of the irrigation water system had been performed. Therefore, CSC based the estimate of maximum irrigation water demand on similarly sized previous projects. A maximum irrigation water demand of 27.8 gallons per minute (gpm) was estimated. However, as Mr. Payne has informed us, a more extensive landscape design for the project has since been undertaken. Analyses performed as part of the new design indicated that a larger maximum irrigation water demand water would be appropriate. The new increased irrigation water demand was determined to be approximately 75 gpm. Similarly, the normal domestic water demands should be revised. The normal domestic water demands computed by CSC were based upon the land use determination method outlined in the draft joint Bryart/College Station Design Manual for Streets and Alleys, Storer Drainage, Domestic Water, and Sanitary Sewer (revised 1/29/98), hereinafter referenced as Joint Design Manual (Method 2 -Land Use Determination {Page 4-8]). However, as pointed out by Mr. Payne, the mechanical/plumbing engineer for the project, Mr. Paul M. Swoboda, P.E. of Swoboda Engineering, also calculated the water demand for the proposed building using the Fixture Count Determination (Method 1 -Fixture Count Determination of the Joint Design Manual). As you are aware, the Fixtwe Count Determination method is based upon a specific count of the plumbing fixtures in a building and should produce a more accurate determination of water demand than the more general Land Use Method. Mr. Swoboda computed that the maximum domestic water demand would be 25 i gpm, as summariud along with other water demands in tabular form on drawin P3.4. 3407 Tabor Ro+~d P1ion® (9T9} 776-28i 0 Bryan, Texas 77908 ~ 1`ax (879) 778-0820 01f18f2001 15:09 409-778-0820 CSC ENG & EN'J PAGE 07 $ . C Mr. Spencer G. Thompson, ]r. Page 2 December 11, 2000 Therefore, based upon the previously outlined discussion, we respectfully request that the water demand tables on Sheet C-I of the CSC drawings be modified to the following tables. DOMESTIC WATER DEMAND Minimum Daily Ftow Average Daily Flow Maximum Daily Flow Peak Fire Flew gpm gpm gpm gpm 0 3.13 251 2,970 ]RRIGATION WATER Minimum Daily Flow Average Daily Flown Maximum Daily Flow gpm gpm gpm 0 32 ~5 Please do not hesitate to contact us should any questions arise or if we might be able to provide additional information. Kindest Regards, M. Frederick Conlin, Jr., P.E. Senior Engineer MFC:mf Via Hand Delivery Robert L. Payne & Associates 1509 Emerald Parkway, Suite l04 College Station, TX 77845 Attention: Mr. ]~bert L. Payne, AIA via: U.S. Mail Swoboda Engineering 7010 Coyote Run Bryan, TX 77808 Attention: Mr_ Psu1 M. Swoboda, P.E. Via: U.S. Mail Peters Construction Company 2960 Fairview Drive P.O. Box 99 Owensboro, KY 42302 Attention: Mr. Dennis Bates, Project Manager Mr. Chris McCarthy Via: U.S. Mail ~~ ~~, R. L. Payne and Associates, Inc. Architecture, Planning, Interior Design, & Graphics Project: Marriott Courtyard Woodcreek East Bypass College Station, Texas Transmittal Letter Architect's Project No: 98.09ND Date: 11/7/00 To: City of College Station 1101 Texas Ave. College Station, TX 77842 Attn: Spencer G. Thompson, Jr. WE TRANSMIT: (X) Herewith ( )Under separate cover via ( ) In accordance with your request FOR YOUR: ( )Approval ( )Review & comment ( ) ( )Distribution to parties (X) Record THE FOLLOWING: (X) Drawings ( )Specifications ( )Change Order ( )Shop Drawings Prints ( )Shop Drawing Reproducibles ( ) IF ENCLOSURES ARE NOT AS NOTED, PLEASE NOTIFY OUR OFFICE IF CHECKED BELOW, PLEASE ( )Acknowledge receipt of enclosures ( )Return enclosures to us (X) Information (X) Use ( )Samples ( )Product Literature COPIES DATE REV. NO DESCRIPTION ACTION CODE 3 11/07/00 Utilit Drawin s AL t IUN A. ACtIOn IntllCated On Item transmltteo u. ror signature tx rorwaramg as notes unaer ncnnHnna CODE B. No action required E. See REMARKS below C. For signature and return to this office REMARKS: COPIES TO: BY: Robert Payne 1509 Emerald Parkway, Suite 104, College Station, Texas 77845 (409) 696-7272 Fax (409) 696-8114 ~~~~c~ From: Pete Caler To: Bridgette George Date: 8/3/00 10:27AM Subject: Re: New Development Courtyard by Marriott: The gated enclosure measures less than 10 feet in width. The approach, curb to curb, is 13 feet wide, so all we need is some minor adjustments. We didn't see a detail section of the service area. Is there one? Sanitation is OK with the other two projects. Thanks!! »> Bridgette George 08/01 /00 11:36AM »> Attached is the list of new development received this week in Development Services. Thank you! Bridgette George :o) Asst. Development Coordinator City of College Station baeoraeCa ci.colleae-station.tx.us (979) 764-3570 (979) 764-3496 {Fax} R.L. Payne & Associates, Inc. 1509 Emerald Parkway, Suite 104, College Station, Texas 77845 (979) 696-7272 Fax (979) 696-8114 R.L. Payne & Associates, Inc. 3114 R.L. Payne & Associates, Inc. 1509 Emerald Parkway, Suite 104, College Station, Texas 77845 (979) 696-7272 Fax (979) 696-8114 From: Spencer Thompson To: Rick Conlin Date: 10/ 18/00 11:09AM Subject: Marriott I appears that the architect sent in the old site plans and not the revised set. I was asked to return comments directly to you. The civils look ok except for one comment I have (I found the drop manhole detail): 1. Please ensure that the information referring to the 18" waterline on the profile view on Sheet C-9 is correct. It looks like what refers to the new 12" line should be 18" Let me know. Thanks, Spencer Spencer G. Thompson, Jr. Development Services, Engineering City of College Station PO Box 9960 College Station, TX 77842 Ph 979-764-3570 Fx 979-764-3496 sthompson@ci.college_station.tx.us CC: Bridgette George ~~ FACSIMILE COVER SHEET CITY OF COLLEGE STATION DEVELOPMENT SE RVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texa s 77842 Phone (979) 764-3570 /Fax (979) 764-3496 Date: October 30.2000 # of pages including cover: 2 If you did not receive a complete fax, please call our office immediately for a new transmittal. TO: R.L. Panne F COMPANY: RE: Fire Lanes that need to be painted FROM: Tammy Macik PHONE: (979) 764-3570 COMPANY: REMARKS: ^ Urgent /For your review George or Jon Mies at 764-3750. ^ Replay ASAP ^ FYI Thank You, Tammy Macik