Loading...
HomeMy WebLinkAboutMinutesLvTEZ~~I~~?\TD~,T~T DATE: US/1212000 TO: Northgate Review Board FROM: Jessica Jimmerson, StatTPlanner RE: La Bodega Site Plan '''his item was tabled at the Mav IUra meeting because the Board requested additional information in regards to four of the seven areas over which they had discretion. The seven decision points for the project are: • Sign • Building Colors and Aesthetics • Parking Requirement • Site Layout (including screening issues) • Covered Patio Design • Landscaping • Bike Rack Placement The Board requested additional information in regards to the site layout, specifically screening of the service area, the patio design, the landscaping/irrigation and the location of a bike rack. The applicant is prepared to present additional information for this project and is requesting that this item be removed from the table. Board members present at the May 10`~ meeting will only be receiving new information in their packets. Enclosures: Minutes from May 10~' meeting Agenda for May 17"' meeting Letter from applicant 3 Graphics Sheets 1 Photo Sheet Packet Information from May 10`~ meeting 2nd nrb labodega memo.doc Page 1 of 1 AGENDA Northgate Revitalization Board Review Subcommittee CITY OF COLLEGE STATION, TEXAS City Ha11 Council Chambers 1101 Texas Avenue Wednesday, May 17, 2000 10:00 A.M. La Bode a Restaurarrt.• Discussion and consideration of a site plan for a restaurant to be ocated in an existin building at 102 Church St. in Northgate. This item was tabled at a May 10, 200 meeting pending further drawings and information. (00-49) This building is wheelchair accessible. Handicapped parking spaces are available. Any request for sign interpretive services must be made 48 hours before the meeting. To make arrangements ca11409-764- 3547 or (TDD) 1-800-735-2989. Decision Points for La Bodega • Sign • Building Colors and Aesthetics • Parking Requirement Site Layout • Covered Patio Design • Landscaping • Bike Rack Placement ~.~~ ~o~-r~~ ~~~a I~ ~~ ~< ~,~ 1~~~ ~ ~ ~,~~ .~~ :~. ~P~ >~ u ~~ ~~ ~~~~ ~~ j/i~ ,~y ~ ~~ i~~ 11 lt~~ „ ,. U I / ' ,, ~~~~ ~ ~~. ~ t,9/~'~~ "~l ` r ~ ~~~~~ ~~~~ ~~ jRY~ 4 ~ ~~n~ B Q~f~z~ .~~~~~ ~ ~ ~~ `~ ~^~ / ~~,.F.~Y~»s ,. n ~- -- ~ ~Qy.i /~JL~'%N° ~~I ~~ ~ ~ ~ ~~~ f lL...~1~9~- f I /~ ~/z/z~ ,~ ,E'J~~P~a~ - l0~ G`turc~,S~~ Go~~~e ~ GI'e; ~/~C~c¢cJ ~-~ ~f/ ~. 3 r~~u ~~ J, %> U~ l~ ~~a--D7~ ~~o~" I~b ll) -~GCe v.~-~~ GL-C~ ~ 5~~- ~'1 ~ ~ ~u,~e s ~~im~~r~ ~ ,~~`"~ r`~b ~1,1~rr~PSf~/t, - ,~Le C~ `(J~/}'1 CQ;~ ~JBI~CC~ Ct/Y~C~ a~,~ • • E/C~ (X ~'~c.. ~ ~ ~ cc r~ .;2 `7~°f l (~ vZ C 1~-~-U`c.6~~ '~~. CJ~Cl lCe~i rr ~~ ~~ ~ a ri e ~p 3~ S e~-~~ ~ S~ ~ ~cF l~~^e,~? p 3 ~~6/~~'"~ ~~ ~~~aA /Q~rCtl®SU.// JG~~I r~P~' -~' a2 9'~9~~~ 1.~. ~ CR9'l~,,z.'~`~ _ Qt dl~ ~£- !~`~~ ~ r`Gl 167Sc~, Cl CC ~~ ~~`' ,- 3 ~~7~`f~ft9 ~~ ~ ~ ~' _ 1, i~?~ -- !r /_tr/~~P.~~,~~p~.~.1~ >~ ~~~6i _Q~ ~~ ~ ~~~-~-t/ ~~ ~~~ . ~~~ ~~ -a/~ ~-~,~ o~y~~`,.,fib''T"~ ~e+e~~e. ~io~^„~.5 m bz eyq,.e{ 3`•3'~'F.~ea- r~~ w~b~,~,A-ode ~QaJ a ^"'- !T ~ ~ ,CSC # ~.~ ~-d'y ~~ City of College Station Development Services P. O. Box 9960 — 1101 Texas Avenue — College Station, Texas 77842 (409) 764-3570 NORTHGATE REVITALIZATION BOARD (NRB) REVIEW SUBCOMMITTEE MEETING May 10, 2000 TO: Mr. Bill O'Brien, Via Fax — 822-0708 Mr. Costa Dallis, 104 Church St., College Station, TX 77840 FROM: NRS Review Subcommittee: Julius Gribou, NRS Chairman Elton Abbott, Jr., NRS Member Richard Senning, NRS Member Steve Parker, P&Z Commissioner Rick Floyd, P&Z Commissioner Judith Warren, P&Z Commissioner Staff Attending: Natalie Ruiz, Development Coordinator Jessica Jimmerson, Staff Planner Molly Hitchcock, Staff Planner Shauna Anderson, Staff Planner Amber Kelly, Secretary SUBJECT: La Bodega Restaurant — D-iscusslon and consideration of a site plan for a restaurant to be located1n an exlsting bwYd1ng at 102 Church St. in Northgate (00-49) Staff Planner Jimmerson stated that the applicants, Mr. William O'Brien and property owner, Mr. Costa Dallis, want to remodel an already existing building to meet the needs of a new restaurant. They propose to enlarge and cover an outside patio, move a walk-in cooler, and relocate a portable building, as well as make landscape and sign changes Staff Planner Jimmerson pointed out that the City has a bike rack requirement in the Northgate area. There are no bike racks on the La Bodega plan at this time, although Mr. Dallis stated that he wanted to share the rack at Cafe Eccell, a restaurant across the street. Commissioner Warren asked staff how to accommodate handicapped citizens who wish to frequent this establishment. Staff Planner Jimmerson answered the City looks to the Building Code to regulate handicap space and accessibility requirements. Northgate Review Board (NRS) Member Senning stated that an irrigation system should be installed now. He asked staff if the NRS could require irrigation. Staff Planner Jimmerson acknowledged that the Board could require in -ground plantings and irrigation. There are existing planter boxes on site that the Cafe Eccell staff is currently caring for. Commissioner Home of Texas A&M University NRBMeehrg Project: La Bodega Restaurant Date May 10, 2000 Page 2 oft Warren asked the applicant to consider at least a drip irrigation system to allow consistency in the Northgate area. NRB Chairman Gribou stated that the portable building, cooler and dumpster should be screened. Mr. Dallis stated that he is willing to erect a screen that will be aesthetically pleasing to the Board. Mr. O'Brien mentioned a privacy fence with gates for access. Commissioner Floyd moved to table the item until the applicants could produce drawings of the screening and bike rack locations. He also asked for more detailed landscape drawings including irrigation. Commissioner Warren 2nd the motion. The motion passed unanimously, 6-0. Home of Texas A&M University City of College Station Development Services P. O. Box 9960 — 1101 Texas Avenue — College Station, Texas 77842 (409) 764-3570 NORTHGATE REVITALIZATION BOARD (NRB) REVIEW SUBCOMMITTEE MEETING May 17, 2000 TO: Mr. Bill O'Brien, Via Fax — 822-0708 Mr. Costa Dallis, 104 Church St., College Station, TX 77840 From: NRB Review Subcommittee: Richard Benning, NRB Member Elton Abbott, Jr., NRB Member Steve Parker, P&Z Commissioner Joe Horlen, P&Z Commissioner Ron Kaiser, P&Z Commissioner Staff Attending: Bridgette George, Assistant Development Coordinator Jessica Jimmerson, Staff Planner Molly Hitchcock, Staff Planner Amber Kelly, Secretary SUBJECT: La Bodega Restaurant — Reconsideration of this item, which was tabled at a May 10, 2000 meeting pending more information regarding dumpster screening, bike rack locations and irrigation and landscape drawings. Staff Planner Jimmerson reviewed the items discussed at the May 10th meeting with the Board, and presented the new information provided by the applicant. NRB Member Abbott asked Mr. O'Brien to confirm his proposed irrigation system, and Mr. O'Brien stated that it would be a drip system. Commissioner Kaiser moved to approve the item, as the applicants have met all of their requirements. Commissioner Horlen 2nd the motion. Motion passed unanimously.