17/99 11:16 $409 764 3496 DEVELOPMENT SVCS 0 002
STAFF REVIEW COMMENTS
No. 1
Project: Site Plan Campus Park Phase 1 B
1. Change the note under "required" parking to match what was approved with
the PDO for this phase.
Reword the easement to clarify that the cross access and parking easement
is private and is at 1east'24'.
3-. The private access easement needs to meet alley standards, which requires
6' instead of 5' of concrete. The parking spaces may continue to show 5" of
concrete.
A4. - Clarify the variable width easement between Lots 3 & 6 as a private drainage
and,A.- public utility easement.
/5. Clarify the boundaries of the 5' utility easement near the water meters. This
easement also needs to connect to another easement or right -of -way. co 17 r PCf �p
Designate the driveway throat as a fire lane.` 3 r r > K <<
V4. Where will the electrical meters be? They will need to be screened from the
Right -of -way.
On the southwest side of the property you show a 6' wood fence by others.
You also show it as proposed. When? F r , or ao or CiU r• r5 COnnr ✓C.1;o• - ) 0�'OY11C� F'acE'�
Curbing is required around the entire perimeter of the parking area. Curb' aCovnd e9 -4 pc��Me¢u
' S prov ded
Handicap ramps do not meet requirements. aF - ue �Qr
11. Reminder: an irrigation system must be installed before C.O. oK
12. Reminder: no construction can begin until the detention pond in Phase 1A is
completed.. o k
c A. The Fire Department will not cross Holleman Drive, a minor arterial, therefore
a fire hydrant will have to be installed. fa F; re h I has beer) a dried •to
ConSn'JGt r.�n pI��S i$ c �ho..J , �1
on •f-,•s s f' p �� •
Reviewed by: Jessica Jimmerson pate: 12/16/1999
J:IPZTEXT%PZ02422.00C
Page 1 of 1
I
STAFF REVIEW COMMENTS
No. 2
Project: Site Plan Campus Park Phase 1 B
Private access easements are required to meet alley standards, which do not
allow for asphalt paving. The drive areas must be concreted (6- inch). Only
the parking spaces may be asphalt. See note #3 of first round staff review
comments.
2. The parking table needs to show the required parking as 21.
Reviewed by: Jessica Jimmerson Date: 1/25/00
J: \PZTEXT \PZ02598. DOC
Page 1 of 1
Bridaette George -New Development Page 1
From:
Jennifer Reeves
To:
Bridgette George
Date:
12/14/99 11:OOAM
Subject:
New Development
Week of 12/9/99
Texadelphla: (99 -455) Developer installs conduit per city spec and design.
✓Campus Park Phase 1 -13: (99 -507) Developer installs conduit per city spec and design. Developer
needs to provide easements per electrical design.
Woodlake Subdivision Section 2 Phase 1: (99 -260) No Comment.
2 -D Homes: (97.441) Developer needs to provide temporary blanket easement. Developer needs to
provide load information, and service requirements.
Ordonez Residence: (99 -733) Owners need to contact Electrical Division if there is going to being
additional load to existing service.
Sweetwater Ph. 2: (99 -319) Developer installs conduit per city spec and design. Developer provides
easements per Electrical design.
Chimney Hill Townhomes: (99 -261) No Comment.