Loading...
HomeMy WebLinkAboutMisc.MEMORANDUM December 17, 1999 TO: Blake Cathey, 6345 Smith Road, Bellville, TX, 77418 FROM: Bridgette George, Asst. Development Coordinator SUBJECT: Campus Park Ph. 1 -B - Site Plan Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: Three (3) complete sets of building construction documents for the proposed development with the revised site and landscaping plans attached; and The attached redlined site plan with staff comments. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764 -3570. Attachments: Staff review comments Electrical & W /WW comments cc: Debbie Keating, Via fax (409) 696 -9752 Case file #99 -507 apmjai instructions: PROJECT: CAMPUS -PARK SUBDIVISION C k> Construction Plans with Redlines for Phases 1 -A 1 -B and Phase 2. Revised Cost Estimate for Phase 1 -B. And Site Plan's with Redlines for Phases 1 -A and 1 -B. TRANSMITAL LETTER TRANSMIT.DOC 03/23/99 JAN f, 2000 1 (� MEMORANDUM January 28, 2000 TO: Debbie Keating, Via fax (409) 696 -9752 FROM: Bridgette George, Asst. Development Coordinato SUBJECT: Campus Park Ph. 1B - Site Plan Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. If all items have not been addressed on the next submittal, another $100 processing fee will need to be submitted for the subsequent set of three (3) reviews. Please address the comments and submit the following information for further staff review: Two (2) revised site plans (once plans have been approved additional sets will be requested to be stamped approved and distributed); If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764 -3570. Attachments: Staff review comments cc: Blake Cathey, 6345 Smith Road, Bellville, TX, 77418 Case file #99 -507 <nruiz @ci.college- station.tx.us >, <msmith @ci.college - station.tx.us> qq- 5z-7 LJ3G Urban IJesic 11 P.O. Box 10153 College Station, Texas 77842 Ph: (979)- 696 -9653 Fax: (979 696 -9752 1 1 TRANSMITTAL LETTER TO: Jessica Jimmerson FROM: Deborah Keating rb� Citv of Collece Station Re: Campus Park Date: December 1, 1999 please find : ❑ attached ✓ as requested ❑ original sent via mail ❑ for your information ❑ plans ❑ for your files ❑ specifications ❑ for your approval ❑ other ❑ for your review *"�� �E � ���i a� ` � d R ��:s� i y � �s ,. E xe E � ��+���r 3" . a � � � `� � �•�.�a� � a� 'a qFk y �� :•. 2 t:. ;� g ,..,.x�....' A , �.`�".:��x:° , h �::;.. as �'........ ... COMMENTS: Enclosed is the plans that you reges°7 i � 777-- p MAR 1 J L.I 77'' v C: office /transmit. doc DEVELOPMENT SERVICES TRANSMITTAL LETTER Name/Firm: Urban Design Group Date: January 10, 2000 Address: 909 Southwest Parkway East, Suite E Phone: (409) 696 -9653 College Station, Texas 77840 Fax: (409) 696 -9752 We are transmitting the Following for Development Services to review and comment: (Check all that apply.): • Master Development Plan • Preliminary Plat • Final Plats • FEMA CLOMA/CLOMP,/LOMA/LOMR ✓ Site Plan (1 -A and 1 -B) • Grading Plan • Landscape Plan • Irrigation Plan • Building Construction Documents w/❑ Redlines ❑ Development Permit App. w/❑ Redlines ❑ Conditional Use Permit w/❑ Redlines ❑ Rezoning Application w/❑ Redlines ❑ Variance Request w/✓ Redlines ✓ Other - Please Specify w/❑ Redlines Revised Site Plans: 1 -A,1 -B w/❑ Redlines with Redlines w/❑ Redlines Construction Plans: I -A, I -B, w/❑ Redlines and 2 with Redlines Revised Cost Estimate: 1 -B INFRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete set. The following are included in the complete set: ✓ Waterline Construction Documents w/ ✓ Redlines ✓ Sewerline Construction Documents w/ ✓ Redlines ✓ Drainage Construction Documents w/ ✓ Redlines ✓ Street Construction Documents w/ ✓ Redlines • Easement application with metes & bounds description • Drainage Letter or Report w/ ❑ Redlines ❑ Fire Flow Analysis w/ ❑ Redlines Special Instructions: • TxDOT Driveway Permit • TxDOT Utility Permit ❑ Other — Please Specify PROJECT: CAMPUS -PARK SUBDIVISION C k> Construction Plans with Redlines for Phases 1 -A 1 -B and Phase 2. Revised Cost Estimate for Phase 1 -B. And Site Plan's with Redlines for Phases 1 -A and 1 -B. TRANSMITAL LETTER TRANSMIT.noC 03/23/99 JAN 1 2000 ¢- ys Bridgette George - New Development Page 1 From: Jennifer Reeves To: Bridgette George Date: 12/14/99 11:OOAM Subject: New Development Week of 12/9/99 Texadelphia: (99 -455) Developer installs conduit per city spec and design. VCampus Park Phase 1 -13: (99 -507) Developer installs conduit per city spec and design. Developer needs to provide easements per electrical design. Woodlake Subdivision Section 2 Phase 1: (99 -260) No Comment. 2 -13 Homes: (97 -441) Developer needs to provide temporary blanket easement. Developer needs to provide load information, and service requirements. Ordonez Residence: (99 -733) Owners need to contact Electrical Division if there is going to being additional load to existing service. Sweetwater Ph. 2: (99 -319) Developer installs conduit per city spec and design. Developer provides easements per Electrical design. Chimney Hill Townhomes: (99 -261) No Comment. CITY OF COLLEGE STATION PLANNING DIVISION POST OFFICE BOX 9960 1101 TEXAS AVENUE COLLEGE STATION, TEXAS 77842 -9960 TELEPHONE: (409) 764 -3570 MEMORANDUM December 17, 1999 TO: Blake Cathey, 6345 Smith Road, Bellville, TX, 77418 FROM: Bridgette George, Asst. Development Coordinat SUBJECT: Campus Park Ph. 1 -B - Site Plan Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: Three (3) complete sets of building construction documents for the proposed development with the revised site and landscaping plans attached; and The attached redlined site plan with staff comments. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764 -3570. Attachments: Staff review comments Electrical & W/WW comments "��2�tl�ne�, C Qi�ase Pick u ,,) a}- l)ev0c eS� cc: Debbie Keating, Via fax (409) 696 -9752 ' Case file #99 -507 a me c u y - Campus Par Gar age Containers f�age From: Blake Cathey <bcathey @flash.net> To: Debbie Keating <udgcs @txcyber.com> Date: 12/1/99 7:38PM Subject: Campus Park Garbage Containers Debbie, I met with Mark Smith this afternoon and we mutualy agreed on the location /style of the garbage collection containers. It was decided to utilize the 300 gal containers which will be placed on a 8'x8' concrete pads. Each container will service 6 townhouse units. The location of these containers is indicated on the sketches provided this afternoon and described briefly as follows: Ir Phase IA - A single container located next to townhouse unit no. 7 and directly behind the 8x10 patio. Phase 2 - Three containers servicing 16 townhouse units (no's 13 -28) clustered together and located in front of unit 17 near the cul -de -sac. Phae IB - A single container located next to townhouse unit no. 4 and directly behind the 8x10 patio. Blake \Vk, i J CC: "McCully, Sabina" <smccully @ci.college- station.tx.us >, Natalie Ruiz <nruiz @ci.college- station.tx.us >, <msmith @ci.college- station.tx.us> qq