HomeMy WebLinkAboutStaff ReportsCommissioner Hall opened the public hearing.
Representative of the applicant Russ Hutchins of 2207 Woodsong Trail in Arlington, approached
the Commission and offered to answer questions about the proposed development. A total of 136
units are planned consisting of 13 buildings with 12 living units per building. He stated that the
proposed retirement community will consist of 70% affordable housing retirees and the remaining
30% of the units will be at market rate. The rents will range from $350 - $550 per month. Mr.
Hutchins stated that the actual density of the project is less than 10 units per acre. Access to the
site will be from a proposed street that will connect to Wellborn Road. There will be no direct
access from the proposed site to Wellborn Road.
Commissioner Hall closed the public hearing.
Commissioner Gribou moved to recommend approval of a rezoning request for 4.314 acres
located along the east side of Wellborn Road approximately 500' north of the Graham Road
intersection from C-2 Commercial Industrial to R-5 Medium Density Apartments. Commissioner
Lightfoot seconded the motion which passed unopposed (6 - 0).
AGENDA ITEM NO. 3: Consideration of a variance request to the minimum parking
lot standards for the First Federal Savings and Loan building located at 2202 Longmire
Drive. (94-403)
Project Engineer McCully informed the Commission that the parking lot plan for the First Federal
Banking facility on Longmire Drive was approved by staff in the course of the normal review
process. The Project Review Committee (PRC) approved the site plan on March 4, 1994.
However, approval of the site plan does not exempt an applicant from meeting all ordinance
requirements even if certain requirements were not mentioned in the PRC review. At the
completion of site construction, an inspection was made and it was found that the southern limit
of the original parking area, which extends a length of approximately 180 feet, had not been
curbed in accordance with the Zoning Ordinance. It was determined that the marking on the
plans was consistent with that of a proposed curb, but no note or direction was included on the
plans which would ensure that the curb would be installed. The applicant and contractor were
notified of the deficiency, and directed to install the curbing as required. Instead, the contractor
installed concrete wheel stops along the edge of paving, believing that the wheel stops would
meet our Ordinance. Because the discrepancy was not specifically noted during the original plan
review, and due to the concerns of staff to not hinder the occupancy of the building, a temporary
certificate of occupancy was prepared, with the curbing required to be bonded by the applicant.
This agreement has not been signed by the applicant because a variance to the standards is
pending. There is therefore no certificate of occupancy at this time and technically the building
should not be occupied. Since the occupancy of the building, the applicant has resisted efforts to
install the curbing based on the following reasoning: the original parking lot was not curbed, the
intention of the applicant is to further expand to the south and would have to remove this curbing
at some point and because the comment was not made during the original plan review process.
Several telephone meetings were held to inform the applicant of the City's intention to pursue
code enforcement options to have the curb installed. During the course of these meetings, it was
decided that because the curbing requirement could have been appealed to the Planning and
Zoning Commission after PRC, and since the applicant was not aware of this opportunity, that the
applicant should be allowed to request a variance to the Zoning Ordinance. Normally, a variance
request must be submitted no later than ten days after PRC review. The variance request is based
upon the opinion of the applicant that the wheel stops are the same as curbing, that the openings
between the stops will allow drainage to exit the site better, and that the replacement of the stops
with curbing is an unnecessary expense.
P & Z Minutes September Li, 1994 Page 2 of 5
Project Engineer McCully stated that section 9.2.1) of the Zoning Ordinance requires that all on
site driveway and parking areas be surrounded by a raised 6" high concrete curb. Concrete wheel
stops are not acceptable options because they do not adequately meet the intent of curbing. It is
staffs opinion that the curbing should be installed to meet the aesthetic intentions of the
Ordinance, to prevent the loss of control over the edge of the parking area by the eventual loss
and or destruction of the wheel stops, and to confine the drainage outflow from the parking into
the two established paths which existed prior to the expansion. Based upon these facts, staff
recommended denial of the variance request and requested direction to the applicant to install the
curbing.
Stan Stevens and Bobby Williamson, representatives of the First Federal Savings and Loan
Association, approached the Commission and stated that they have complied with all of the
improvements that they proposed. There was never any plan to curb that particular section of the
existing parking lot to allow for future expansion. If the curbing was installed, it would have to
be removed within the next three to five years when the site is expanded. Mr. Stevens apologized
for any misunderstanding and explained that having to install the curb would require the bank to
go through another approval process through the regulatory agencies in Dallas. If the problem
would have been identified during construction, then the problem could have been resolved at that
time. However, he was not notified until after the fact of the requirement to install the curb. Mr.
Stevens stated that he would install the curb if for some reason the facility is not expanded within
the next five years.
Staff Planner Kuenzel explained that on June 10, 1994 the site was inspected and the missing curb
section was identified. On June 13th, the contractor was notified of the problem. At that time, a
temporary certificate of occupancy was drafted to require a bond for that section of the curb that
was never signed by the applicant.
Commissioner Lightfoot stated that the local architect or engineer should have been aware of the
City ordinances. Any variances to the current standards should have been identified during the
site planning stage.
Commissioner Gribou moved to deny the variance request to the minimum parking lot standards
for the First Federal Savings and Loan building located at 2202 Longmire Drive. Commissioner
Lane seconded the motion.
Commissioner Hall stated that the site has been brought up to code with the exception of the curb
which was a misunderstanding. He suggested that the variance be denied with the condition that
the applicant have a three to four year time period of compliance. This would allow the wheel
stops to remain until the site is expanded.
The original motion to deny the variance request failed (3 - 2 - 1). Commissioners Lightfoot and
Hall voted against the motion and Commissioner Garner abstained.
Commissioner Smith explained that he voted in favor of the motion with the understanding that
the three to five year time period of compliance was part of the motion. Since that condition was
not part of the motion, Commissioner Smith requested to change his vote against the original
motion to deny the variance request.
Commissioner Smith moved to deny the variance request with the condition that the applicant is
allowed a four year time period to come into compliance with the City standards. Commissioner
Lightfoot seconded the motion with a second condition that the wheel stops must be installed in a
continuous fashion placed end to end to give the appearance of a curb with only two gaps in the
wheel stops to allow for drainage. Commissioner Smith agreed to the amendment. The motion
passed (4 - 1 - 1); Commissioner Gribou voted in opposition to the motion and Commissioner
Garner abstained.
P & Z Minutes September 15, 1994 Page 3 of 5
i or
RESPONSE TO STAFF REVIEW COMMENTS
No. 1
Project: First Federal Savings and Loan expansion - site plan review
G , L How will the detention be handled? If there are going to be any retaining walls that are
visible to the street rights-of-way, they must be screened.
This item was discussed previously. The detention for this area was designed and constructed
as a regional system when the area was first developed by Bill Fitch. Elrey Ash has
previously located the report in your office and shown it to your staff. There are no retaining
walls. There are two storm water inlet grates which will not be discernable to Longmire
traffic.
/2. Where is this note #4 used? Where will the relocated curb stops be? At this time, there
does not appear to be any room for them unless the parking spaces are increased to 20'.
The wheel stops are to be located at the south throat of the new west parking area. From this
throat the parking will be extended in the future as indicated on the site plan. The throat will
presently be used as a back-out area for the end parking spaces.
3. It's difficalt to distinguish between notes -6 and 9. K011 /7(
1, Note designations are clarified. Also, the site plan sheet has been rearranged for clarity.
✓4. Submit a landscaping plan with the site plan. A full review will not be conducted
without landscaping.
The landscape plan is under separate contract to The Greenery. We have requested a copy as
soon as it is complete. / -
5. What is this area? Pavement? Landscaping? It seems to tie into both.
The area in question is existing concrete paving at the drive-through lanes. A note will be
added on the drawing. /\116f; p.l ti rA I;'
7. The key map is hard to read. Clarify the street names. ^
The map will be clarified.
8. Provide ownershi zoning,ef adjacent properties, ~
This information will-be provided.
9. What is the size of the waterline in front?
~i 90-44.
The line size is 1311 A LorJ(- La (n.il~ S'~ N_owBl ?";✓Ate /10. How are water/sewer/electrical being brought to the building?
/ From taps to existing yard lines.
11. Are you tying into an existing drive here? If so, you do not need this curbing.
Yes, we are tying to an existing drive. The curb will be removed.
S. Is this an existing or new dumpster? If it's new, relocate the dumpster so that gates are
V not required to screen it from Longmire.
The dumpster is new. As we recently discussed on the telephone, the location will best serve
the pick-up crews at its present location. It was also agreed that the location was far enough
away from Longmire StreFt (400') to not require gates. Interior dimensions will be increased
to 12' x 12'.
i /
STAFF REVIEW COMMENTS
No. 2
Project: First Federal Savings Bank #99448
~1. (Review #1, Question #1) Place a line under the number 6 to clarify the detail
designations between the numbers 6 & 9 on the site plan. Since there is no
distinct difference in these two letters especially when they have no defined
orientation on the site plan.
✓2. (R#1, Q#5) Place a note call-out (#8) on the existing pavement area entering
the drive-thru tellers.
\/3. (R#1, Q#8) Provide the zoning designation of the adjacent properties with
the ownership.
(R#1, Q#9) Provide the location of the waterline on the private road that you
stated in your reply comments to Review #1. Also, provide the size call-outs
for both water lines on the site plan.
t (R#1, Q#19) This legend request is to include the demands for water
(minimum, maximum, and average demands in gallons per minute) and
sanitary sewer (maximum demand in gallons per day).
reening is required for the existing and new parking lot areas adjacent to
Othce Longmire Drive rights-of-way (minimum of 3 feet above the parking lot
pavement elevation).
Reviewed by: Scott Hester Date: 12-13-99
t. X
Staff Review Comments
Page 1 of 1
STAFF REVIEW COMMENTS
No. 1
Project:: First Federal Savings and Loan expansion - site plan review
REVIEW HAS BEEN STOPPED. SEVERAL ITEMS ON THE SITE PLAN
CHECKLIST WERE EITHER NOT PROVIDED OR WERE NOT ADDRESSED
FULLY FOR A FULL REVIEW TO BE CONDUCTED. THE FOLLOWING IS A
PARTIAL LIST OF PRELIMINARY REVIEW COMMENTS FOR YOUR
INFORMATION.
1. How will the detention be handled? If there are going to be any retaining
walls that are visible to the street rights-of-way, they must be screened.
2. Where is this note #4 used? Where will the relocated curb stops be? At this
time, there does not appear to be any room for them unless the parking
spaces are increased to 20'.
3. It's difficult to distinguish between notes 6 and 9.
4. Submit a landscaping plan with the site plan. A full review will not be
conducted without landscaping.
5. What is this area? Pavement? Landscaping? It seems to tie into both.
6. Is this an existing or new dumpster? If it's new, relocate the dumpster so that
gates are not required to screen it from Longmire.
7. The key map is hard to read. Clarify the street names.
8. Provide ownership/zoning of adjacent properties.
9. What is the size of the waterline in front?
10. How are water/sewer/electrical being brought to the building?
11. Are you tying into an existing drive here? If so, you do not need this curbing.
12. Where is the electrical meter?
13. Is there an existing and/or new transformer? If so, it will need to be screened.
14. Provide parking space dimensions or a "typical" note.
15. Provide circulation aisle dimensions.
16. Provide a grading plan.
17. The addition will require off-street fire lanes. Show them either on-site, or if
you are going to use the existing access easements. In either case, show
how the fire trucks will have both ingress and egress with adequate radii to
maneuver corners (we have radius and turn-around standards if you need
copies). Fire lanes will need to meet thicker pavement standards than the
other parking lot standards. If you are going to use the access easements,
Staff Review Comments Page 1 of 2
412.
y
Where is the electrical meter? y
The meter is to be located on the existing building where the note "ELECTRIC SERVICE" is
indicated.
V 13.
Is there an existing and/or new transformer? If so, it will need to be screened.
There is an existing pole transformer. We propose to maintain this arrangement.
✓14.
Provide parking space dimensions or a "typical" note.
O.K.
r = ' 15.
Provide circulation aisle dimensions,
;
0. K.
1~/, 6.
Provide a grading plan.
O.K.
R 17.
The addition will require off-street fire lanes. Show them either on-site, or if you are
going to use the existing access easements. In either case, show how the fire trucks will
ry ,
have both ingress and egress with adequate radii to maneuver corners (we have radius
and turn-around standards if you need copies). Fire lanes will need to meet thicker
av
t
t
d
d
h
p
emen
s
an
ar
s t
an the other parking lot standards. If you are going to use the
/
access easements, they will need to be brought up to fire lane standards unless they are
r
already designated fire lanes.
The north drive and its continuation north to the feeder road were previously designated as a
fire lane and striped as such. Fire trucks entering this area will be able to drive to within 150'
of the most remote corner of the building. The lane will be repainted.
418.
Provide an irrigation system plan, or provide a note with the next submission regarding
assurance that an irrigation system will be submitted for approval and installed before
CO.
The irrigation plan is under separate contract to The Greenery. We have requested a copy as
soon as it is complete.
X19.
Provide a water and sewer legend.
See the site plan. n
✓20. Provide a note that all boundaries of parking spaces, drive aisles, and other pavement
edges will have curbing placed along them.
O.K.
✓21. Replace temporary curbing detail with a permanent curbing. Temporary curbing is
only permitted in areas that are intended forfuture expansion.
The temporary curbing is only shown at the south throat of the west parking lot. It is intended
for future expansion as indicated on the drawing.
✓22. Isn't there a temporary building(s) on site currently? Is it (are they) going to be
relocated? Where?
The temporary buildings are to be removed. See the demolition plan.
Reviewed by: Sabine McCully Date: November 5, 1999
t
they will need to be brought up to fire lane standards unless they are already
designated fire lanes.
18. Provide an irrigation system plan, or provide a note with the next submission
regarding assurance that an irrigation system will be submitted for approval
and installed before CO.
19. Provide a water and sewer legend.
20. Provide a note that all boundaries of parking spaces, drive aisles, and other
pavement edges will have curbing placed along them.
21. Replace temporary curbing detail with a permanent curbing. Temporary
curbing is only permitted in areas that are intended for future expansion.
22. Isn't there a temporary building(s) on site currently? Is it (are they) going to
be relocated? Where?
Reviewed by: Sabine McCully Date: November 5, 1999
Staff Review Comments Page 2 of 2