Loading...
HomeMy WebLinkAboutStaff ReportsSTAFF REVIEW COMMENTS No. 2 Project: TEXACO CONVENIENCE STORE - ROCK PRAIRIE (99-149) 1. Ok 2. Ok 3. Ok 4. No screening is shown for the transformer. Need to show the transformer with screening on the landscape plan. 5. Ok 6. May count pump island parking as provided parking spaces. 7. Ok 8. Ok 9. Ok 10. Ok 11. Ok 12. Ok 13. Ok 14. Comment omitted. 15. Ok 16. Ok 17. Please submit a signed TXDOT permit. 18. Took out driveway.... Ok. 19. Ok 20. Ok 21. Ok 22. Curb along the car wash needs to be designated as a Fire Lane. 23. Ok 24. Ok 25. Gates need to be removed from the dumpster pad Reviewed by: Shauna Anderson Date: 6-Mar-00 Staff Review Comments Page 1 of 1 STAFF REVIEW COMMENTS No. 1 Rock Prairie Texaco (Wellborn Rd. @ Rock Prairie) *A full check list review was done on this site in light of the changes that were made from the original site plan. In addition, the previous review was done prior to TXDOT's plan to acquire right-of-way and widen Wellborn Road. 1. Update information in title block area. 2. Update surrounding ownership information. 3. Call TXDOT's Chad Bohne at 778-2165 for more information regarding the potential impacts to this site due to TXDOT's right-of-way acquisition for their planned widening of Wellborn Road. At this time, TXDOT does not know how much right-of-way they will be acquiring. At their last public hearing for the Wellborn widening project, TXDOT showed their "study area" for the project to be an additional 100 feet behind their existing right-of-way line. 4. If the electrical transformer is to be installed with the Texaco site, label it and show screening. 5. It appears the detention pond shown in the previous drainage study will be located in future TXDOT right-of-way and possibly in the future roadway section of Wellborn Road. Staff suggests that the applicant talk with staff and TXDOT about the potential impacts of TXDOT's plans on the detention. Depending on what the potential impacts are, the applicant may want to look at alternative detention areas on site that would be out of the way of any future TXDOT improvements. (Note that the City can not require this, however.) Also, how will the detention pond be screened? 6. Update parking calculations/information. 7. Provide curb and pavement detail. 8. As with the detention area, these parking spaces may be impacted by the Wellborn Road widening and right-of-way acquisition. TXDOT will not allow parking in their ROW. Although the site exceeds its required number of parking spaces, the applicant may want to place the parking spaces elsewhere in the event they are lost as part of TXDOT improvements. 9. Shrubs need to be 5 gallon plants; not 1 gallon. 10. Provide parking screening for parking along Rock Prairie Road. 11. In light of the TXDOT's ROW acquisition and widening of Wellborn Road, staff suggests that the general row of land sca p i ng/streetscap i ng along Wellborn Road be moved into the site site by about 15-20 feet. While TXDOT has not determined what they are going to do yet, staff estimates that if the Staff Review Comments Page 1 of 2 10 r r 'REDEVELOPMENT MEETING The purpose of a predevelopment meeting io to meet the City Staff that will be involved with your development and identify general issues that need further analysis. Along with the discussion of these major issues, Staff will talk about the development process, distribute necessary information and discuss what permits will be required for your particular development. This meeting io in no way a complete review of your project. Staff will perform a formal thorough review once the minimum requirements are submitted for your particular development. Date of Meeting: 9/a010(,) Applicant(s): fhkkL (-6/y,; dd City Staff present: Proposal: U Miocellaneouo: Utility I55Ue5: Water Availability/Capacity: L Sanitary Sewer Availability/Capacity: Impact Fees: Electrical Fire Hydrant Miocellaneouo: LandSCaping/5treet5cape: Dumpoter Location: 5igno: 5creening/Buffering: Variance Requeoto: Permits required for this development: Development Permit Building Permit Conditional Use Permit TOOT Driveway Permit for work in State ROW TOOT Utility Permit for work in State ROW 5pecial Review required by: Wolf Pen Creek Design Review Board Northgate Revitalization Committee Parks and Recreation Board Planning and Zoning Commi55ion Information City Council N✓ provided Zoning Ordinance 5ubdivi5ion Regulations 5pecification5 for Street Construction Drainage Policy & Design Standards C5 Building Regulations (Local Amendments to the building Code) Fire Department Construction & Development Guide Driveway Acce55 Location & Design Policy Water & Sewer 5pecification Manual C5 Buoine55 Center Covenants & Reotriction5 Guide to building & Development Development Resource Guide Land Use: Zoning: ~ I Special zoning district information: Subd ivision/Platting Issues: n TU 40d-~IFATYIJ t5 ('SSW T-Fare Plan/street 155ues: i y 1 + act Driveway Access: Anc,~t PA Parkland/Greenway5 Dedication: Parks & Recreation Board Consideration: Drainage looue5: road is widening to a 6 lane urban arterial, moving the landscaping by 15 - 20 feet may allow the landscaping to remain. TXDOT's immediate plan is to widen the roadway to 4 lanes with a median. If the landscaping/streetscaping remains in its current location, it may still not be far enough behind Wellborn Road to not be impacted by the immediate plan to widen 4 to lanes. If the landscaping is moved back as suggested it should keep it from being impacted by the 4-lane widening and possibly prevent the site from becoming legally non-conforming from a landscaping standpoint. 12. Provide more plant screening material in the vegetative buffer between this commercial site and the residential to the north. 13. Show barricading for existing trees to remain and counted towards landscape points. 14. Comment ommitted. 15. Note that irrigation plan must be submitted and approved as part of building plans. 16. Show easement electrical transformer is contained within. 17. Submit TXDOT permit for driveway on Wellborn Road. 18. This driveway does not meet the spacing requirements in the City's driveway ordinance and can therefore not be allowed. In order for the driveway to be permitted, a variance would be needed from the City's Project Review Committee (PRC). Staff could not support a variance for the proposed driveway. 19. Show the private access and drainage easement as it connects with the site's driveway on Rock Prairie. (This easement runs parallel to Rock Prairie Road.) 20. Show parking for All Pets site in the area of the driveway. 21. Provide notation that all fire lanes must be constructed using 6" reinforced concrete. 22. Add fire lane in the area of driveway such that it connects with the fire lane markings planned for the All Pets site. 23. An emergency pump shut off switch must be no closer than 15 feet and no further than 75 feet from each pump. This will require the installation of two emergency pump switches. 24. If the site$ takes gravity sewer to the lines that were built as part of the sewer impact fee area, the site will be required to pay the sewer impact fee. Reviewed by: Ed Hard Date: 10/27/99 Staff Review Comments Page 2 of 2