79-
•
08/15/99 23:58 $409 764 3496 DEVELOPMENT SVCS Iip 001
* ACTIVITY REPORT
F
,.ACTY#
MODE
CONNECTION TEL
CONNECTION ID
START TIME
USAGE T.
PAGES
RESULT
*8710
AUTO RX G3
08/12 01:20
01'19
2
OK
*8711
TX G3
9P8468252
KLING ENGR
08/12 08:29
01'22
2
OK
*8712
TX
917137815347pp161
08/12 09:19
00'00
0
NG
0 STOP
*8713
TX ECM
17137815347ppp161
OSBORN & VANE.
08/12 09:20
04'36
5
OK
*8714
TX ECM
9p6930938
08/12 10:46
02'10
4
OK
*8715
TX ECM
98463094
08/12 11:06
02'28
3
OK
*8716
TX ECM
17138567101pp170
08/12 11:49
01'20
2
OK
*8717
AUTO RX ECM
6969752
08/12 13:03
01'09
1
OK
*8718
AUTO RX G3
409 846 8252
KLING ENGR
08/12 13:41
01'37
3
OK
*8719
TX ECM
96948606
08/12 14:13
01'44
4
OK
*8720
AUTO RX ECM
409 764 3489
08/12 14:55
00'34
1
OK
*8721
AUTO RX ECM
08/13 02:33
03'04
4
OK
*8722
TX ECM
9p8467005
08/13 09:20
00'54
2
OK
*8723
AUTO RX G3
4097762383
08/13 09:36
01'32
2
OK
*8724
AUTO RX ECM
4096906081
08/13 09:44
00'38
2
OK
*8725
TX G3
9P6939785
BRITT RICE
08/13 10:11
01'20
2
OK
*8727
TX
9p7766699
08/13 10:50
00'00
0
NG
0 #018
*8728
TX
9p7740565
08/13 10:57
00'00
0
NG
0 #018
*8729
TX ECM
12813701403pp170
08/13 11:01
02'44
3
OK
*8730
TX
13154775531pp170
08/13 11:06
00'00
0
NG
0 STOP
*8731
TX ECM
13154775717pp161
08/13 11:08
00'29
1
OK
*8732
TX
9p7766699
08/13 11:16
00'00
0
NG
0 STOP
*8733
TX G3
9p7740565
08/13 11:19
02'04
2
NG
2 #001
*8734
TX
9p7766699
08/13 11:29
00'00
0
NG
0 #018
*8735
TX ECM
9P6918904
08/13 11:40
03'04
3
OK
*8736
TX ECM
9P6933398
08/13 11:57
01'07
2
OK
*8737
AUTO RX ECM
2688933
08/13 12:34
00'56
1
OK
x8738
TX G3
9p7762383
LAWYERS TITLE
08/13 14:06
01'03
2
OK
*8739
TX ECM
9p6948338
08/13 14:22
01'02
2
OK
*8740
TX G3
9p7640421
08/13 14:24
01'12
2
OK
*8741
TX ECM
9PP8461888
KBTX NEWS
08/13 14:28
00'48
2
OK
*8742
TX ECM
9p8466614
08/13 14:33
00'46
2
OK
*8743
AUTO RX ECM
409 764 3452
COLL STA PUB UTL
08/13 14:44
01'27
1
OK
*8744
TX G3
9p7766008
BRYAN-CONST-
08/13 14:50
01'09
2
OK
*8745
TX ECM
9p8233342
08/13 14:52
03'09
2
OK
*8746
TX ECM
9P6933207
08/13 14:56
01'01
2
OK
*8747
TX G3
9p7765865
COLLEGE STATION
08/13 15:03
01'01
2
OK
*8748
TX ECM
9p7763223
NORWEST BANK
08/13 16:20
00'57
2
OK
*8749
TX ECM
9p7645432
08/13 16:33
01'05
3
OK
*8750
TX ECM
9P8465801
HORIZON HOMES/SZ
08/13 16:54
01'42
2
OK
COLLEGE STATION
P. O. Box 9960 • 1101 Texas Avenue College Station, TX 77842
Tel. 409 764 3500
MEMORANDUM
August 13, 1999
TO: Larry Mariott, Via Fax (409) 693-3398
FROM: Bridgette George, Asst. Development Coordinato
SUBJECT: Brackett Office Building - Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list
of staff review comments detailing items that need to be addressed. Please address
the comments.and submit the following information for further staff review:
Three (3) complete sets of building construction documents for the
proposed development with the revised site and landscaping plans
attached;
Three (3) revised site and landscaping plans to be stamped approved and
distributed;
Impact fees in the amount of $434.66 are due prior to the issuance of a
building permit; and
The attached redlined site plan.
As mentioned on the adjacent property site plan, the following conditions apply prior to
the issuance of a Certificate of Occupancy to whichever site finishes construction first:
The travel aisle width between the two properties, Lots 2 and 3, must be a
minimum of 20' in width;
The detention pond on both properties must be completed.
If there are comments that you are not addressing with the revised site plan, please
attach a letter explaining the details. If you have any questions or need additional
information, please call me at 764-3570.
Attachments: Staff comments
Redlined site plan
Case file #99-440
Home of Texas A&M University
qt
COLLEGE STATION
R O. Box 9960 • 1101 Texas Avenue College Station, TX 77842
Tel: 409 764 3500
MEMORANDUM
September 2, 1999
TO: Larry Mariott, Via fax (409) 693-3398
FROM: Bridgette George, Asst. Development Coordinat
SUBJECT: Brackett Office Building - Site Plan
Staff reviewed the above-mentioned site plan as requested and has only one comment.
The temporary turn-around must be designed in accordance with the attached Fire
Department requirements. The following page is a copy of the turning radius
specifications for the turn-around. Please address the comment and submit the
following information for the plans to be stamped approved and distributed:
Three (3) complete sets of building construction documents for the
proposed development with the revised site and landscaping plans
attached.
If there are comments that you are not addressing with the revised site plan, please
attach a letter explaining the details. If you have any questions or need additional
information, please call me at 764-3570.
Attachments: Fire Department Turn-around Specifications
Case file #99-436
Home of Texas A&M University
r
Aerial
L 8111, 19,
41,'
~ 1 1 I 1
i'
1 1 1 1
1
R=30'
~'-------RHO'-- 1
I
1 I
, I
1 /
8.0'
0
0
M
TURNING RADIUS
N SPECIFICATIONS
TURNING RADIUS REQUIRED FOR
co FIRE TRUCKS IN A TEE TURNAROUND
20.0'
TURNING RADIUS REQUIRED
FOR FIRE TRUCKS IN A CIRCLE
Aerial
TURNAROUND - - -
Pumper
1 1 t , , 1 1 1
1 1 ~ 1 t I
R=48'1 1
~ 1 1 '1 1` 1 1 1 I
R-17: INSIDE WHEEL PUMPER '
R=28': OUTSIDE WHEEL PUMPER
R=33': INSIDE WHEEL AERIAL
R=45': OUTSIDE WHEEL AERIAL
R=48': OUTSIDE OVERHANG AERIAL
A-4
09/02/99 15:34 x$`409 764 3496 DEVELOPMENT SVCS 16001
* ACTIVITY REPORT
TRANSMISSION OK
TX/RX NO. 8990
CONNECTION TEL 96933398
CONNECTION ID
START TIME 09/02 15:33
USAGE TIME 00'58
PAGES 2
RESULT OK
f
1)'b" 13 99 11:57 V409 764 3496 DEVELOPMENT SVCS
August 13, 1999
COLLE'"GE STATION
P. G Box 9960 1101 Texas Avenue College Station. TX 77642
Tel: 409 764 3500
MEMORANDUM
TO: Larry Mariott, Via Fax (409) 693-3398 C
FRONT: Bridgette George, Asst. pevelopment Coordinato
SUBJECT: Brackett office Building - Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list
of staff review comments detailing items that need to be addressed. Please address
the comments and submit the following information for further staff review:
Three (3) complete sets of building construction documents for the
proposed development with the revised site and landscaping plans
attached;
Three (3) revised site and landscaping plans to be stamped approved and
distributed;
Impact fees in the amount of $434.66 are due prior to the issuance of a
building permit; and
The attached redlined site plan.
As mentioned on the adjacent property site plan, the following conditions apply prior to
the issuance of a Certificate of Occupancy to whichever site finishes construction first:
_ The travel aisle width between the two properties, Lots 2 and 3, must be a
minimum of 20' in width;
The detention pond on both properties must be completed.
It there are comments that you are not addressing with the revised site plan, please
attach a letter explaining the details. If you have any questions or need additional
information, please call me at 764-3570.
Attachments: Staff comments
Redlined site plan
Case file 099-440
2001
Home of Texas AW University
SUBMIT APPLICATION AND THIS
LIST CHECKED OFF WITH 10
FOLDED COPIES OF SITE PLAN FOR REVIEW
SITE PLAN MINIMUM REQUIREMENTS
(ALL CITY ORDINANCES MUST BE MET)
INCLUDING BUT NOT LUMTED TO THE FOLLOWING:
A. Sheet size - 24" x 36" (minimum).
✓2. A key map (not necessarily to scale).
3. Title block to include:
Name, address, location, and legal description
~tAe Name, address, and telephone number of applicant
Name, address, and telephone number of developer/owner (if differs from applicant)
Name, address, and telephone number of architect/engineer (if differs from applicant)
Date of submittal
Total site area
A. North arrow.
-'5. Scale should be largest standard engineering scale possible on sheet.
X 6. Ownership and current zoning of parcel and all abutting parcels.
7. Eaistin locations of the following on or adjacent to the subject site:
O Streets and sidewalks (R.O.W.).
d Driveways (opposite and adjacent per Driveway Ordinance 1961).
t~ Buildings.
Water courses.
X Show all easements clearly designating as existing and type (utility, access, etc.).
X 100 yr. floodplain and floodway (if applicable) on or adjacent to the proposed project site, note if there is
/ none on the site.
X Cd Utilities (noting size and designate as existing) within or adjacent to the proposed site, including building
transformer locations, above ground and underground service connections to buildings, and drainage inlets.
/ Meter locations.
Q/ Topography (2' max or spot elevations) and other pertinent drainage information. (If
/ plan has too much information, show drainage on separate sheet.)
8. Proposed location, type and dimensions of the following.:
E]/ Phasing. Each phase must be able to stand alone to meet ordinance requirements.
The gross square footage of all buildings and structures and the proposed use of each. If different uses are
to be located in a single building, show the location and size of the uses within the building. Building
separation is a minimum of 15 feet w/o.additional fire protection.
Setbacks. Show building setbacks as outlined in Ordinance 1638 Zoning Ordinance, (Section 7, Table A).
Off-Street parking areas with parking spaces drawn, tabulated, and dimensioned. Minimum parking space
is 9' x 20', or on a perimeter row 9' x 18' with a 2' overhang. Designate number of parking spaces
required by ordinance and provided by proposal.
Handicap parking spaces.
SITE PLAN CHECKLIST I of 3
SrrECK.DOC 03/25/99
04 Parking Islands. Raised landscape islands, (6" raised curb) a minimum of 180 sq. ft. are required at both
ends of every parking row (greenspace area contiguous to the end island maybe applied toward the
required 180 sq. ft.). Additionally, 180 sq. ft. of landscaping for every 15 interior parking spaces must be
provided. All required islands must be landscaped or set with decorative pavers, or stamped dyed concrete
or other decorative materials as approved.
Drives. Minimum drive aisle width is 23' with head-in parking or 20' without parking.
Curb cuts. For each proposed curb cut (including driveways, streets, alleys, etc.) locate existing curb cuts
on the same opposite side of the street to determine separation distances between existing and proposed
curb cuts. Indicate driveway throat length as measured in the Driveway Ordinance. (See Ordinance 1961
for driveway location and design requirements.)
~J6`❑/ Security gates (show swing path and design specs with colors).
Sidewalks (both public and private). Sidewalks are required at time of development if property has frontage
on a street shown on the Sidewalk Master Plan or if the review staff determines the necessity. (Refer to
Section 10.2 of the Zoning Ordinance).
N~1] Medians. Show any and all traffic medians to be constructed on site.
Landscape Reserve. A twenty four foot setback from R.O.W. to curb of parking lot is required. Pavement
may encroach into this 24' reserve by up to 1134 square feet if streetscape requirement can still be mct. In
no case may the pavement be less than 6' from the property line.
NG-p Common open spaces sites
N,•-O Loading docks
Detention ponds
/~,/r--❑ Guardrails
? Retaining walls
All required and other types of fences (a 6' privacy fence is required between industrial/commercial and
residential developments as well as between multi-family and single family developments).
❑ Sites for solid waste containers with screening. Locations of dumpsters are accessible but not visible from
streets or residential areas. Gates are discouraged and visual screening is required. (Minimum 12 x 12 pad
/ required.)
O Show all easements clearly designating as proposed and type (utility, access, etc.). If dedicated by separate
instrument list by volume and page.
Utilities (noting size and designate as proposed) within or adjacent to the proposed site, including building
transformer locations, above ground and underground service connections to buildings.
u Meter locations (must be located in public R.O.W. or public utility easement.).
f ❑ Proposed grading (1' max for proposed or spot elevations) and other pertinent drainage information. (If
plan has too much information, show drainage on separate sheet.)
viy Show proposed and existing fire hydrants. Fire hydrants must be located on the same side of a major street
as a project, and shall be in a location approved by the City Engineer. Any structure in any zoning district
other than R-1, R-IA, or R-2 must be within 300 feet of a fire hydrant as measured along a public street,
highway or designated fire lane.
V4 Show fire department connections. FDC's should be within 150' of the fire hydrant. In no case shall they
be any further than 300' apart, and they shall be accessible from the parking lot without being blocked by
parked cars or a structure.
CS/ Show fire lanes. Fire lanes a minimum of 20 feet in width with a minimum height clearance of 14 feet must
be established if any portion of the proposed structure is more than 150 feet from the curb line or pavement
edge of a public street or highway.
NOTE: Fire hydrants must be operable and accepted by the City, and drives must have an all weather surface as
defined in the Zoning Ordinance Section 9 before a building permit can be issued.
❑ 9. Will building be sprinkled? Yes ❑ No
If the decision to sprinkle is made after the site plan has been approved, then the plan must be resubmitted.
~J ❑ 10. Wheelstops may be required when cars overhang onto property not owned by the applicant or where
there may be conflict with handicap accessible routes or above ground utilities, signs or other conflicts.
SITE PLAN CHECKLIST 2 of 3
SrrECK.DOC 03/25/99
11. Show curb and pavement detail. A 6" raised curb is required around all edges of all parts of all paved areas
without exception. (To include island, planting areas, access ways, dumpster locations, utility pads, etc.)
Curb details may be found in the Zoning Ordinance Section 9 and alternatives to those standards must be
approved by the City Engineer. No exception will be made for areas designated as "reserved for future
parking".
12. Landscape plans as required in Section 11 of the Zoning Ordinance (See Ordinance # 1638.) The
landscaping plan can be shown on a separate sheet if too much information is on the original site plan.
If requesting protected tree points, then those trees need to be shown appropriately barricaded on
the landscape plan. Attempt to reduce or eliminate plantings in easements. Include information on the plans
such as:
required point calculations
additional streetscape points required. Streetscape compliance is required on all streets larger than a
residential street.
calculations for # of street trees required and proposed (proposed street tree points will accrue toward total
landscaping points.)
/ proposed new plantings with points earned
d/ proposed locations of new plantings
d screening of parking lots
❑ screening of dumpsters, detention ponds, transformers, A/C units, loading docks, propane tanks, utility
demarcation point on buildings, or other areas potentially visually offensive.
0 existing landscaping to remain
❑ show existing trees to be barricaded and barricade plan. Protected points will only be awarded if
1 barricades are up before the first development permit is issued.
L 13. Show irrigation system plan. (or provide note on how irrigation system requirement will be met prior to
issuance of C.O.) All plans must include irrigation systems for landscaping. Irrigation meters are separate
from the regular water systems for buildings and will be sized by city according to irrigation demands
submitted by applicant and must include backflow prevention protection.
❑ 14. Is there any landscaping in TxDOT R.O.W. ? Yes ❑ No 1
If yes, then TxDOT permit must be submitted.
❑ 15. Will there be any utilities in TxDOT R.O.W. ? Yes ❑ No M
If yes, then TxDOT permit must be submitted. /
❑ 16. Will there be access from a TxDOT R.O.W. ? Yes ❑ No a
If yes, then TxDOT permit must be submitted.
❑ ,1~T The total number of multi-family buildings and units to be constructed on the proposed project site.
❑ Jk' The density of dwelling units per acre of the proposed project.
l~ 19. Provide a water and sanitary sewer legend to include water demands (minimum, maximum and average
demands in gallons per minute) and sewer loadings (maximum demands in gallons per day).
❑ 20. Are there impact fees associated with this development? Yes ❑ No U/
NOTE: Signs are to be permitted separately.
SITE PLAN CHECKLIST 3 or3