Loading...
HomeMy WebLinkAboutMisc.` G ~ l P T'/ oll ~ ~ ♦ J' ^ Y } J yv'1 i :Y / / f~,. 1, , el L_ . t~ 1 r~ s7,.. t ,.w 11;x• f f '.1 t ~ 1 A n ~f/ J/ 79- • 08/15/99 23:58 $409 764 3496 DEVELOPMENT SVCS Iip 001 * ACTIVITY REPORT F ,.ACTY# MODE CONNECTION TEL CONNECTION ID START TIME USAGE T. PAGES RESULT *8710 AUTO RX G3 08/12 01:20 01'19 2 OK *8711 TX G3 9P8468252 KLING ENGR 08/12 08:29 01'22 2 OK *8712 TX 917137815347pp161 08/12 09:19 00'00 0 NG 0 STOP *8713 TX ECM 17137815347ppp161 OSBORN & VANE. 08/12 09:20 04'36 5 OK *8714 TX ECM 9p6930938 08/12 10:46 02'10 4 OK *8715 TX ECM 98463094 08/12 11:06 02'28 3 OK *8716 TX ECM 17138567101pp170 08/12 11:49 01'20 2 OK *8717 AUTO RX ECM 6969752 08/12 13:03 01'09 1 OK *8718 AUTO RX G3 409 846 8252 KLING ENGR 08/12 13:41 01'37 3 OK *8719 TX ECM 96948606 08/12 14:13 01'44 4 OK *8720 AUTO RX ECM 409 764 3489 08/12 14:55 00'34 1 OK *8721 AUTO RX ECM 08/13 02:33 03'04 4 OK *8722 TX ECM 9p8467005 08/13 09:20 00'54 2 OK *8723 AUTO RX G3 4097762383 08/13 09:36 01'32 2 OK *8724 AUTO RX ECM 4096906081 08/13 09:44 00'38 2 OK *8725 TX G3 9P6939785 BRITT RICE 08/13 10:11 01'20 2 OK *8727 TX 9p7766699 08/13 10:50 00'00 0 NG 0 #018 *8728 TX 9p7740565 08/13 10:57 00'00 0 NG 0 #018 *8729 TX ECM 12813701403pp170 08/13 11:01 02'44 3 OK *8730 TX 13154775531pp170 08/13 11:06 00'00 0 NG 0 STOP *8731 TX ECM 13154775717pp161 08/13 11:08 00'29 1 OK *8732 TX 9p7766699 08/13 11:16 00'00 0 NG 0 STOP *8733 TX G3 9p7740565 08/13 11:19 02'04 2 NG 2 #001 *8734 TX 9p7766699 08/13 11:29 00'00 0 NG 0 #018 *8735 TX ECM 9P6918904 08/13 11:40 03'04 3 OK *8736 TX ECM 9P6933398 08/13 11:57 01'07 2 OK *8737 AUTO RX ECM 2688933 08/13 12:34 00'56 1 OK x8738 TX G3 9p7762383 LAWYERS TITLE 08/13 14:06 01'03 2 OK *8739 TX ECM 9p6948338 08/13 14:22 01'02 2 OK *8740 TX G3 9p7640421 08/13 14:24 01'12 2 OK *8741 TX ECM 9PP8461888 KBTX NEWS 08/13 14:28 00'48 2 OK *8742 TX ECM 9p8466614 08/13 14:33 00'46 2 OK *8743 AUTO RX ECM 409 764 3452 COLL STA PUB UTL 08/13 14:44 01'27 1 OK *8744 TX G3 9p7766008 BRYAN-CONST- 08/13 14:50 01'09 2 OK *8745 TX ECM 9p8233342 08/13 14:52 03'09 2 OK *8746 TX ECM 9P6933207 08/13 14:56 01'01 2 OK *8747 TX G3 9p7765865 COLLEGE STATION 08/13 15:03 01'01 2 OK *8748 TX ECM 9p7763223 NORWEST BANK 08/13 16:20 00'57 2 OK *8749 TX ECM 9p7645432 08/13 16:33 01'05 3 OK *8750 TX ECM 9P8465801 HORIZON HOMES/SZ 08/13 16:54 01'42 2 OK COLLEGE STATION P. O. Box 9960 • 1101 Texas Avenue College Station, TX 77842 Tel. 409 764 3500 MEMORANDUM August 13, 1999 TO: Larry Mariott, Via Fax (409) 693-3398 FROM: Bridgette George, Asst. Development Coordinato SUBJECT: Brackett Office Building - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments.and submit the following information for further staff review: Three (3) complete sets of building construction documents for the proposed development with the revised site and landscaping plans attached; Three (3) revised site and landscaping plans to be stamped approved and distributed; Impact fees in the amount of $434.66 are due prior to the issuance of a building permit; and The attached redlined site plan. As mentioned on the adjacent property site plan, the following conditions apply prior to the issuance of a Certificate of Occupancy to whichever site finishes construction first: The travel aisle width between the two properties, Lots 2 and 3, must be a minimum of 20' in width; The detention pond on both properties must be completed. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff comments Redlined site plan Case file #99-440 Home of Texas A&M University qt COLLEGE STATION R O. Box 9960 • 1101 Texas Avenue College Station, TX 77842 Tel: 409 764 3500 MEMORANDUM September 2, 1999 TO: Larry Mariott, Via fax (409) 693-3398 FROM: Bridgette George, Asst. Development Coordinat SUBJECT: Brackett Office Building - Site Plan Staff reviewed the above-mentioned site plan as requested and has only one comment. The temporary turn-around must be designed in accordance with the attached Fire Department requirements. The following page is a copy of the turning radius specifications for the turn-around. Please address the comment and submit the following information for the plans to be stamped approved and distributed: Three (3) complete sets of building construction documents for the proposed development with the revised site and landscaping plans attached. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764-3570. Attachments: Fire Department Turn-around Specifications Case file #99-436 Home of Texas A&M University r Aerial L 8111, 19, 41,' ~ 1 1 I 1 i' 1 1 1 1 1 R=30' ~'-------RHO'-- 1 I 1 I , I 1 / 8.0' 0 0 M TURNING RADIUS N SPECIFICATIONS TURNING RADIUS REQUIRED FOR co FIRE TRUCKS IN A TEE TURNAROUND 20.0' TURNING RADIUS REQUIRED FOR FIRE TRUCKS IN A CIRCLE Aerial TURNAROUND - - - Pumper 1 1 t , , 1 1 1 1 1 ~ 1 t I R=48'1 1 ~ 1 1 '1 1` 1 1 1 I R-17: INSIDE WHEEL PUMPER ' R=28': OUTSIDE WHEEL PUMPER R=33': INSIDE WHEEL AERIAL R=45': OUTSIDE WHEEL AERIAL R=48': OUTSIDE OVERHANG AERIAL A-4 09/02/99 15:34 x$`409 764 3496 DEVELOPMENT SVCS 16001 * ACTIVITY REPORT TRANSMISSION OK TX/RX NO. 8990 CONNECTION TEL 96933398 CONNECTION ID START TIME 09/02 15:33 USAGE TIME 00'58 PAGES 2 RESULT OK f 1)'b" 13 99 11:57 V409 764 3496 DEVELOPMENT SVCS August 13, 1999 COLLE'"GE STATION P. G Box 9960 1101 Texas Avenue College Station. TX 77642 Tel: 409 764 3500 MEMORANDUM TO: Larry Mariott, Via Fax (409) 693-3398 C FRONT: Bridgette George, Asst. pevelopment Coordinato SUBJECT: Brackett office Building - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: Three (3) complete sets of building construction documents for the proposed development with the revised site and landscaping plans attached; Three (3) revised site and landscaping plans to be stamped approved and distributed; Impact fees in the amount of $434.66 are due prior to the issuance of a building permit; and The attached redlined site plan. As mentioned on the adjacent property site plan, the following conditions apply prior to the issuance of a Certificate of Occupancy to whichever site finishes construction first: _ The travel aisle width between the two properties, Lots 2 and 3, must be a minimum of 20' in width; The detention pond on both properties must be completed. It there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff comments Redlined site plan Case file 099-440 2001 Home of Texas AW University SUBMIT APPLICATION AND THIS LIST CHECKED OFF WITH 10 FOLDED COPIES OF SITE PLAN FOR REVIEW SITE PLAN MINIMUM REQUIREMENTS (ALL CITY ORDINANCES MUST BE MET) INCLUDING BUT NOT LUMTED TO THE FOLLOWING: A. Sheet size - 24" x 36" (minimum). ✓2. A key map (not necessarily to scale). 3. Title block to include: Name, address, location, and legal description ~tAe Name, address, and telephone number of applicant Name, address, and telephone number of developer/owner (if differs from applicant) Name, address, and telephone number of architect/engineer (if differs from applicant) Date of submittal Total site area A. North arrow. -'5. Scale should be largest standard engineering scale possible on sheet. X 6. Ownership and current zoning of parcel and all abutting parcels. 7. Eaistin locations of the following on or adjacent to the subject site: O Streets and sidewalks (R.O.W.). d Driveways (opposite and adjacent per Driveway Ordinance 1961). t~ Buildings. Water courses. X Show all easements clearly designating as existing and type (utility, access, etc.). X 100 yr. floodplain and floodway (if applicable) on or adjacent to the proposed project site, note if there is / none on the site. X Cd Utilities (noting size and designate as existing) within or adjacent to the proposed site, including building transformer locations, above ground and underground service connections to buildings, and drainage inlets. / Meter locations. Q/ Topography (2' max or spot elevations) and other pertinent drainage information. (If / plan has too much information, show drainage on separate sheet.) 8. Proposed location, type and dimensions of the following.: E]/ Phasing. Each phase must be able to stand alone to meet ordinance requirements. The gross square footage of all buildings and structures and the proposed use of each. If different uses are to be located in a single building, show the location and size of the uses within the building. Building separation is a minimum of 15 feet w/o.additional fire protection. Setbacks. Show building setbacks as outlined in Ordinance 1638 Zoning Ordinance, (Section 7, Table A). Off-Street parking areas with parking spaces drawn, tabulated, and dimensioned. Minimum parking space is 9' x 20', or on a perimeter row 9' x 18' with a 2' overhang. Designate number of parking spaces required by ordinance and provided by proposal. Handicap parking spaces. SITE PLAN CHECKLIST I of 3 SrrECK.DOC 03/25/99 04 Parking Islands. Raised landscape islands, (6" raised curb) a minimum of 180 sq. ft. are required at both ends of every parking row (greenspace area contiguous to the end island maybe applied toward the required 180 sq. ft.). Additionally, 180 sq. ft. of landscaping for every 15 interior parking spaces must be provided. All required islands must be landscaped or set with decorative pavers, or stamped dyed concrete or other decorative materials as approved. Drives. Minimum drive aisle width is 23' with head-in parking or 20' without parking. Curb cuts. For each proposed curb cut (including driveways, streets, alleys, etc.) locate existing curb cuts on the same opposite side of the street to determine separation distances between existing and proposed curb cuts. Indicate driveway throat length as measured in the Driveway Ordinance. (See Ordinance 1961 for driveway location and design requirements.) ~J6`❑/ Security gates (show swing path and design specs with colors). Sidewalks (both public and private). Sidewalks are required at time of development if property has frontage on a street shown on the Sidewalk Master Plan or if the review staff determines the necessity. (Refer to Section 10.2 of the Zoning Ordinance). N~1] Medians. Show any and all traffic medians to be constructed on site. Landscape Reserve. A twenty four foot setback from R.O.W. to curb of parking lot is required. Pavement may encroach into this 24' reserve by up to 1134 square feet if streetscape requirement can still be mct. In no case may the pavement be less than 6' from the property line. NG-p Common open spaces sites N,•-O Loading docks Detention ponds /~,/r--❑ Guardrails ? Retaining walls All required and other types of fences (a 6' privacy fence is required between industrial/commercial and residential developments as well as between multi-family and single family developments). ❑ Sites for solid waste containers with screening. Locations of dumpsters are accessible but not visible from streets or residential areas. Gates are discouraged and visual screening is required. (Minimum 12 x 12 pad / required.) O Show all easements clearly designating as proposed and type (utility, access, etc.). If dedicated by separate instrument list by volume and page. Utilities (noting size and designate as proposed) within or adjacent to the proposed site, including building transformer locations, above ground and underground service connections to buildings. u Meter locations (must be located in public R.O.W. or public utility easement.). f ❑ Proposed grading (1' max for proposed or spot elevations) and other pertinent drainage information. (If plan has too much information, show drainage on separate sheet.) viy Show proposed and existing fire hydrants. Fire hydrants must be located on the same side of a major street as a project, and shall be in a location approved by the City Engineer. Any structure in any zoning district other than R-1, R-IA, or R-2 must be within 300 feet of a fire hydrant as measured along a public street, highway or designated fire lane. V4 Show fire department connections. FDC's should be within 150' of the fire hydrant. In no case shall they be any further than 300' apart, and they shall be accessible from the parking lot without being blocked by parked cars or a structure. CS/ Show fire lanes. Fire lanes a minimum of 20 feet in width with a minimum height clearance of 14 feet must be established if any portion of the proposed structure is more than 150 feet from the curb line or pavement edge of a public street or highway. NOTE: Fire hydrants must be operable and accepted by the City, and drives must have an all weather surface as defined in the Zoning Ordinance Section 9 before a building permit can be issued. ❑ 9. Will building be sprinkled? Yes ❑ No If the decision to sprinkle is made after the site plan has been approved, then the plan must be resubmitted. ~J ❑ 10. Wheelstops may be required when cars overhang onto property not owned by the applicant or where there may be conflict with handicap accessible routes or above ground utilities, signs or other conflicts. SITE PLAN CHECKLIST 2 of 3 SrrECK.DOC 03/25/99 11. Show curb and pavement detail. A 6" raised curb is required around all edges of all parts of all paved areas without exception. (To include island, planting areas, access ways, dumpster locations, utility pads, etc.) Curb details may be found in the Zoning Ordinance Section 9 and alternatives to those standards must be approved by the City Engineer. No exception will be made for areas designated as "reserved for future parking". 12. Landscape plans as required in Section 11 of the Zoning Ordinance (See Ordinance # 1638.) The landscaping plan can be shown on a separate sheet if too much information is on the original site plan. If requesting protected tree points, then those trees need to be shown appropriately barricaded on the landscape plan. Attempt to reduce or eliminate plantings in easements. Include information on the plans such as: required point calculations additional streetscape points required. Streetscape compliance is required on all streets larger than a residential street. calculations for # of street trees required and proposed (proposed street tree points will accrue toward total landscaping points.) / proposed new plantings with points earned d/ proposed locations of new plantings d screening of parking lots ❑ screening of dumpsters, detention ponds, transformers, A/C units, loading docks, propane tanks, utility demarcation point on buildings, or other areas potentially visually offensive. 0 existing landscaping to remain ❑ show existing trees to be barricaded and barricade plan. Protected points will only be awarded if 1 barricades are up before the first development permit is issued. L 13. Show irrigation system plan. (or provide note on how irrigation system requirement will be met prior to issuance of C.O.) All plans must include irrigation systems for landscaping. Irrigation meters are separate from the regular water systems for buildings and will be sized by city according to irrigation demands submitted by applicant and must include backflow prevention protection. ❑ 14. Is there any landscaping in TxDOT R.O.W. ? Yes ❑ No 1 If yes, then TxDOT permit must be submitted. ❑ 15. Will there be any utilities in TxDOT R.O.W. ? Yes ❑ No M If yes, then TxDOT permit must be submitted. / ❑ 16. Will there be access from a TxDOT R.O.W. ? Yes ❑ No a If yes, then TxDOT permit must be submitted. ❑ ,1~T The total number of multi-family buildings and units to be constructed on the proposed project site. ❑ Jk' The density of dwelling units per acre of the proposed project. l~ 19. Provide a water and sanitary sewer legend to include water demands (minimum, maximum and average demands in gallons per minute) and sewer loadings (maximum demands in gallons per day). ❑ 20. Are there impact fees associated with this development? Yes ❑ No U/ NOTE: Signs are to be permitted separately. SITE PLAN CHECKLIST 3 or3 SITECK.DOC 03/25/99