HomeMy WebLinkAboutMisc.13cid etfe Geor a -New Develo ment - Week 8/2/99 Page 1
From: Jennifer Reeves
To: Bridgette George
Date: 8/11/99 9:36AM
Subject: New Development - Week 8/2/99
Deerfield Estates: (99-239)
No Comment.
Edelweiss Business Center: (99-240)
Developer Responsible for Installing conduit per city spec and design.
Developer responsible for pouring transformer pad per city spec and design.
Developer must provide easements to cover all electrical utilities.
Developer needs to provide load information.
Developer Responsible for 20% of total service cost.
Marriott Homes: (99-434)
Developer Responsible for Installing conduit per city spec and design.
Developer responsible for pouring transformer pad per city spec and design.
Developer must provide easements to cover all electrical utilities.
Developer needs to provide load information.
Developer Responsible for 20% of total service cost.
~j Oakwood Custom Home: (99-435)
Developer Responsible for Installing conduit per city spec and design.
Developer responsible for pouring transformer pad per city spec and design.
Developer must provide easements to cover all electrical utilities.
Developer needs to provide load information.
Developer Responsible for 20% of total service cost.
Brackett Office Building: (99-436)
Developer Responsible for Installing conduit per city spec and design.
Developer responsible for pouring transformer pad per city spec and design.
Developer must provide easements to cover all electrical utilities.
Developer needs to provide load information.
Developer Responsible for 20% of total service cost.
CC: Tony Michalsky
C
fill tw~v
4/~
Akv,~~
y
9
To: Bridgette George
From: Ted Mayo,-==-~0
CC: Sabine McCully (r'
Date: 02/23/00 t
Re: OAKWOOD CUSTOM HOMES' COMMERCIAL SITE PLAN rainage Submittal Review
I have reviewed the submittal of 02-17-2000 by Hester Engineering Corporation and all of my concerns
relative to drainage have been addressed.
• Page 1
Ted Mayo - oak wood detention pond Page 1
From:
Sabine McCully
To:
Ted Mayo
Date:
2/10/00 4:09PM
Subject:
oakwood detention pond
guys - i just noticed on the site grading plan that it looks to me like these folks want to put their detention
pond in the txdot r.o.w. i don't think txdot allows this. i've made this comment on the review list but i
would anticipate a call about it soon. can one of you verify that this is true re: txdot's rules/policy?
CC: Jeff Tondre
' CJ~ SO7'~ n " ~ ! `.~0 r °°1 , f.'a.. t'r*~--'f>•,_,c.._,> rt Y^ ' s` ` ~ i . .,~_..._~J
HESTER ENGINEERING COMPANY
Civil Engineering Services
7607 Eastmark Drive Suite 253-B
COLLEGE STATION, TEXAS 77840
PHONE (409) 693-1100 FAX (409) 693-1075
E-mail: hec2000@aol.com
TO er
WE ARE SENDING YOU '-4-_1 Attached ❑ Under separate cover via
❑ Shop drawings ❑ Prints ❑ Plans
❑ Copy of letter ❑ Change order ❑
JOB NO.
J
❑ Samples
DES IPTION
COPIES DATE NO.
r.j
THESE ARE TRANSMITTED as checked below:
❑ For approval ❑ Approved as submitted
❑ For your use ❑ Approved as noted
❑ As requested ❑ Returned for corrections
For review and comment ❑
❑ FORBIDS DUE . ~w A
COPY TO
` 7
i
f enclosures are not as noted,
❑ Resubmit copies for approval
❑ Submit copies for distribution
❑ Return corrected prints
the following items:
❑ Specifications
TO US
v~
Brid ette George - New Develo ment -Week 8/2/99 Pa-- e 1
From: Jennifer Reeves
To: Bridgette George
Date: 8/11/99 9:36AM
Subject: New Development - Week 8/2/99
Deerfield Estates: (99-239)
No Comment.
Edelweiss Business Center: (99-240)
Developer Responsible for Installing conduit per city spec and design.
Developer responsible for pouring transformer pad per city spec and design.
Developer must provide easements to cover all electrical utilities.
Developer needs to provide load information.
Developer Responsible for 20% of total service cost.
Marriott Homes: (99-434)
Developer Responsible for Installing conduit per city spec and design.
Developer responsible for pouring transformer pad per city spec and design.
Developer must provide easements to cover all electrical utilities.
Developer needs to provide load information.
Developer Responsible for 20% of total service cost.
Oakwood Custom Home: (99-435)
Developer Responsible for Installing conduit per city spec and design.
Developer responsible for pouring transformer pad per city spec and design.
Developer must provide easements to cover all electrical utilities.
Developer needs to provide load information.
Developer Responsible for 20% of total service cost.
Brackett Office Building: (99.436)
Developer Responsible for Installing conduit per city spec and design.
Developer responsible for pouring transformer pad per city spec and design.
Developer must provide easements to cover all electrical utilities.
Developer needs to provide load information.
Developer Responsible for 20% of total service cost.
CC: Tony Michalsky
, NOM
07/25/00 17 J8 $409 764 3496 DEVELOI r SVCS '�.` -` Z '1 0 P1/ 01, ,,
4 CITY OF COLLEGE STATION
• DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
Iii / College Station, Texas 77842
COLLEGE ST 1 ON Phone (979) 764-•3570 / Falh: (979) 764 -3496
MEMORANDUM
July 2! , 2000
1'O: Alton Ofczarzak, Via fa ;c (G94- b6-06) ('r
FRON ' Natalie Ruiz, AICY, Development Coot din or
SUBJI:(:T OAKWOOD CUSTOM HOMES (SP) i99 -105)
Staff :.:viewed the above - mentioned revised site pl.in as requested, but stopper ' °view
due to an incomplete submittal. Not all items from th; last review have been ad f. !essed.
This ' .;is the fifth review of this site plan and a full re has still not been co:: leted
by st. :.: due to insufficient information be..g provided for on the plans. In adcl tion to
iterr. ..till missing from the site plan checklist, items requested by staff on 1, avious
revie l were added to earlier revised ;.::-s, bt: have been removed on the 1 ::sL site
plan ; ;.bmitted on July 14.
Belo* staff reviews the site plan fir this project again, all items on the : ; tacht d
chec; : st must be addressed, or a note, stating why they are not. Below is a list o ' ;3veral
item : That have still not been addressed from pre rious staff reviews. These i; ms, in
addir n to all items on the checklist, must be addressed before staff can comply: , a full
revie ; i.
1. 117.e distances shown in the Metes and Bounds do not meet what is scaled.
2. C cope myrtles have been removed from -,revious plan submittals.
;;, F :ivide specific details for lie -ins to .ubli wa :r and sanitary sewer lin :s: line
-:s, grades, flowline elevations, taps, va1vt s, manholes, material speed : . ations,
c • ibed.rnent.
4. S Aw water demand and sewer Ic:ading. T. blank table provided on the sit ; plan is
r, : - sufficient.
5. '; iter and sanitary sewer detail sheet and final grading plan must be seal: :'. by a
l: ;istered Professional Engineer.
Attar ::ments: Site Plan Checklist
M
Home of Tcxa:: A &M Urdversity
u
CITY OF COLLEGE STATION
110
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
\ /
College Station, Texas 77842
COLLEGE STATION Phone (979) 764 -3570 / Fax (979) 764 -3496
II I
MEMORANDUM
July 25, 2000
TO: Alton Ofczarzak, Via fax (694 -8606)
FROM: Natalie Ruiz, AICP, Development Coordin or
SUBJECT: OAKWOOD CUSTOM HOMES (SP) (99 -105)
Staff reviewed the above - mentioned revised site plan as requested, but stopped review
due to an incomplete submittal. Not all items from the last review have been addressed.
This was the fifth review of this site plan and a full review has still not been completed
by staff due to insufficient information being provided for on the plans. In addition to
items still missing from the site plan checklist, items requested by staff on previous
reviews were added to earlier revised plans, but have been removed on the latest site
plan submitted on July 14.
Before staff reviews the site plan for this project again, all items on the attached
checklist must be addressed, or a note stating why they are not. Below is a list of several
items that have still not been addressed from previous staff reviews. These items, in
addition to all items on the checklist, must be addressed before staff can complete a full
review.
1. The distances shown in the Metes and Bounds do not meet what is scaled.
2. Crepe myrtles have been removed from previous plan submittals.
3. Provide specific details for tie -ins to public water and sanitary sewer lines: line
sizes, grades, flowline elevations, taps, valves, manholes, material specifications,
embedment.
4. Show water demand and sewer loading. The blank table provided on the site plan is
not sufficient.
5. Water and sanitary sewer detail sheet and final grading plan must be sealed by a
Registered Professional Engineer.
Attachments: Site Plan Checklist