HomeMy WebLinkAboutMisc.07%16-99 16:55 $'4109 764 3496 DEVELOPMENT SVCS zoos
SUBMIT .APPLIC".ATtON AND THIS
LIST CHFC'XEV OFF WITH 10
VOI MED MPt" OV AM PLAN FOR REVIEW
SITE PLAN MINIMUM REQUIREMENTS
(ALL CITY ORDINANCES MUST BE MET)
INCLUDING BUT NOT LIMITED TO THE FOLLOWING:
~I
A1,
Sheot size - 24" x 36" (Minimum)
U~
4
A key map (riot necessarily to scale).
O
3.
Title black to include:
10
Namc, address, location, and legat description
--0
Narue, address, and tclcphane number of applicant
.-o
Namc, address, and telephone number of developer/owner (if differs from applicant)
-'b
Name, address, and telephone number of architeat/engincer (if differs from applicant)
❑
Date of submittal
0
Total site area
/
!~J
4
h
N
.
arrow.
ort
!
,5
Scale should be largest standard engineering scale possible oit sheet.
,-6.
Owuer,,hip and currt-ni Toning of parcel and all abutting parcels.
O
7.
Existing locations of the following on or adjacent to the subject site:
-'0
Streets and sidewalks (R.0_W.).
Z l ,o
Driveways (opposite and adiaecnt per Driveway Ordinance 1961).
1-U
Buildings.
,-O
waver courses.
0
Show all easements clearly desigr>ating as existing and type (utility, access, etc.).
-/I'D
100 yr. floodplain and floodway (if applicable) on or adjacent to the proposal project site, note if there is
none on the site.
Gl
Utilities (noting size and designate as existing) within or adjacent to the proposed site, including building
transformer looli=_, above ground and underground service connections to buildings, and drainage inlets,
~Cl
Meter locations.
Topography (2' max or spot elevation) and other pertinent drainage information. (If
plan has too much infurmation, show drainage on separate sheet.)
D 8. Proposed location, type and dimemions of the following.'
-,'Cl Phasing. Each phase must be able to stand alone to meet ordinance requirements.
❑ The gross square footage of all buildings and structures and the proposed use of each. If ddrercat uses atc
to be located in a single building, show the location and siu of the uses within the building. Building
separation is a minimum of 15 feet w/o additional fire protection.
❑ Setbacks. Show building setbacks as outlined in Ordinance 1639 Zoning Ordinance, (Section 7, Table A).
.-,U Off-Street parking areas with parking spaces drawn, tabulated, and dimensioned. Minimum parking space
is 9' x 20', or on a perimeter row 9' x 18' with a 2' overhang, Designate number of parking spaces
required by ordinance and provided by proposal.
✓15 Handicap parking spaces.
Srl'E FLAN CHECKLIST 1 00
S17 CK.DOC 04109/94
07/16'99
16:56 V409 764 3496 DEVELOPMENT SITS zoos
Psrl=g lslands. Raiser! landscape islands, (G'° raised curb a
ends of every parking row (greenspace area Conti
eq are r-equuod at both
guous to the end island n>g b
the
required 180 sq. R.). Additionally, 180 sq. ft, of larodscapm
for eve
15 i
rppal
~
g sp=,
8
ry
nterio
,
provided. All required islands must be landscaped or sct with decorati
oast e
p
~
'
ve pavers, o
stattt u dyed c
or other decorative materials as approved-
E " concrete
i
v
✓0
Dr
ves. Minimum drive aisle width is 23' with head-in parking or 20' without parking.
Curb cuts. For each Proposed curb cut (i
ludi
nc
On the same t8 driveways, streets, alleys, etc.) locate existing curb cuts
opposite side of the street to determine separation di
t
s
ances between existing and proposed
curb cuts. indicate driveway throat
>e t11 as measured in the Driveway Or,i-wcc. (&cu Ordinance 19111
for driveway location and desi
i
N( '-Lj
gn requ
rements.)
Security gates (show swing path and de
i
.,-Q
s
€
Side~c~llcs r'sP= with colon).
(both public and privtatc). Sidewalks are required at time of development if property ltas frontage
or, a street shown on the Sidewalk Master Plan or if the re
i
v
ew staff dctermines the necessity. (Refer to
Section 10.2 of the Zoning Ordinance)
N `-u
.
Medians. Show any and all traffic medians to be constructed on site.
L~wdseapc Reserve
A t
.
wenty four foot setback from R.0-W. to curb of parking lot is required. Pavement
may -,accoach intro this 24' reserve by up to 1134 square feet if streetsca
N
pe requirement can still be met. In
no case nLuv the pavement be less than 6' from the property line.
Conunon open spaces sites
0
D
Loading docks
Detention ponds
x D
Guardrails
? U
Rctaeuing walls
All required and other types of fenci;s a 6"
lti privacy
between r
residential develo
i
p
o
~ Q
ulop
ts). rrrnercial and
pments as well as betweenmu
l
and sin is
Y rile family developments).
Sites for solid waste containers with scre
u
en
a •
sib
streets or residential areas, Gates are discourage vis
but not visible from
rp~
~
seq
~
l s
c
i
ua
aire
g
(
d.
required.} Miraiaaum 12 x 12 pad
l
Show all easements clearly designating as proposed and type (utility, access, etc.). Lf dedicated by separate
iaastnunent list by volume and page
"^Y~', Q
'
.
Utilities (rooting site; and desIgnate. as Proposed) within Or transformer locations, above ground and underground
site, atcluding building
i
c
Q
~ d
serv
xnruwous to buildings.
trngs.
ce
Meier locations (must be located in public R.U.W. or public utility easel xmt )
!'reposed
r
di
'
.
g
a
ng (1
max for proposed or spot
plan has too much infotmati ge clevadoo)
and other pertinent drainage infortttatiota. ([f
on, show drainage on s
r0
to
eparate sheet.)
Show proposed and existing fire hydrants. Fire hydrants must be loc
t
d
a
e
on the same side of a major street
as a project, and shall be in a location approved by the City Engineer. Any structure in any zoning district
other than R-1, R-IA, or R-2 must be within 300 f
eet of a fire hydrant as measured along a public street
highway or designated f rc lane.
lVe-- U
,
Show fire depa,innent connections. FDC's should be within 150' of the fire hydrant. In no case shall the
be any further than 300' apart
and th
ll
h
,
y
ey s
a
be accessible from the parking lot without being blocked b
parked cars or a structure.
✓Q
y
Show fie lager. Fire lanes a n nimutn of 20 feet in width
be established if any portion of the proposed structur
of 14 fW mus
i
15
t
t
e
s niore thane
0 f fr
om
edge of a public street or highway.
the curb line or paverneat
NOTE: Fire hydrants trust be operable and accepted by the Ci
defined in the Zortin ty, and drives must have an all weather surface as
t; Ordinance Section 9 before a building permit cart be issued.
U 9, Will building be sp,rinuW? Yes U No d, If the dccision to sprinkle is made after the site plan has been approved, then the plan must be resubmitted.
10. Wheclstops may be required wpeaa cars overhang onto
there may be conflict with property not owned by the applicant or where
handicap accessible routes or above ground utilities, signs or other conflicts.
SM PLAN CHECKLIST
SiTECr-DM 04MV99
7 nre
07,19.99 19:57 10409 794 3499 DEVELOPMENT SVCS 2007
d ❑ 1 l . Show curb and pavement detail- A 6" raised curb is requicc4 around all edges of all parts of all paved ari as
without exception. ('To include island, planting areas, access ways, dumpster locations, utility pads, etc,)
Curb details may be found in die Zoning Ordinance Section 9 and alternatives to those standards must be
approval by the City Engineer. No exception will be made for areas designated as "reserved for future
parking
❑ 12. Landscape plans as required in Scction 11 of the Zoniiig Ordinance (See Ordinance # I638.) The
landscaping plan can be shown on a separate sheet if too much information is on the original site plan.
If requesting pro cted tree points, then those trees need to be shown appropriately barricaded on
the landscape plan. Attempt to redur4 or eliminate plantings in easements. Include information on the plats
such as-
requires! point calculations
0 additional strectscape points required. Str"tscape compliance is required on all streets larger than a
residential street.
0 calculations for # of s'trwi trees rewired and proposed (proposed strcet tree points will accrue toward total
landscaping points.)
Q proposed new plantings with points carved
U proposed locations of new plantings
❑ screening of parking lots
0 screening of dumpsters, detention Panrls, transformers, XIC units, loading docks, propane tank=s, utility
demarcation Ix)int on buildings, or of-her areas potcntially Msually offensive.
U existing landscaping to rennain
O show existing trees to be barricaded and barricade plan. Protected points will only he awarded if
barricades are up before the first t?avdopment permit is issued.
Cr 13. Show irrigation system plan. (or provide note on how ungatnon system requirement will be nnet prior to
issuance of C.O,) All plates must include irrigation systems for landscaping. Irrigation meters are separate
from the regular water systems for buildings and will be sized by city according to irrigation demands
submitted by applicant and must include bacUow prevention protection.
0 pJ t- let. Is there any landscaping in TxDOT K.O.W. ? Yes Cl No JU
If yes, theft TxDUT permit must be submitted.
® iJ 15. Will thcrc be any utilities in TxDO"T R.O.W. ? Yes ❑ No
If yes, then TxDOT permit must be submitted.
0 16. Will there be access from a TxDOT R.O.W. ? Yes ® No O~
If yes, then TxI30T permit must be submitted.
1❑ t,i 17. The total number of multi-family buildings and units to be constructed on the proposed project site.
:3,v tv- 18. The dcnsity of dwelling units per acre of the proposed projt%;t.
rlCd 19. Provide- a water and sanitary sewer legend to include water demands (minimum, maximum and average
demands in gallons per minute) and sewer loadings (maximum demands it gallons per day).
O 20. Arc there impsct fees associated with this development? Yes Q No L7~
NOTE: Signs are: to be permitted separately.
SITE PLAN CHECKLIST 3 of 3
3MCK.DOC 04Ad9M
McCLURE ENGINEERING, INC.
1722 Broadmoor, Suite 210
Bryan, Texas 77802
(409) 776-6700, Fax: (409) 776-6699
TRANSMITTAL LETTER
TO: Mrs. Veronica Morgan, P.E.
Date:
Assistant City Engineer
CITY OF COLLEGE STATION
Attn:
RE:
7/13/99 Proj. #
Edelweiss Business Center
Lots 2 and 3, Block 4
We are sending you the following: ® Attached )ver Via:
❑ Invoice ❑ Prints ® Plans ❑ Contractor Inv ng cifications
❑ Contracts ® Other Drainage Reports
Change Order
A) .~o
Copies
Date
Descriptio
2
7/99
Copies of Drainage Report
2
7/99
Grading & Storm Water Pollution Prev tion Plan
These are transmitted as follows
® For Approval
❑ For your use
❑ As Requested
❑ Approved as Submitted
❑ Approved except as ❑ Resubmitted after Revnoted/
isions
® For Review Comments ❑ Other
Sets to be approved and returned to n
Copies for your files
Corrected Prints
REMARKS: PLEASE REVIEW THESE DOCUMENTS IN CONJUNCTION WITH THE SITE PLAN SUBMITTED BY
MARIOTT HOMES, INC.
COPY TO: SIGNED: H~
Michael R. McClure, P.E., R.P.L.S.
President
McCLURE ENGINEERING, INC.
1722 Broadmoor, Suite 210
Bryan, Texas 77802
(409) 776-6700, Fax: (409) 776-6699
TRANSMITTAL LETTER
TO: VE, ad d q 40116.41J, Date: i,, Job #
-0,-Vato°N1~ Attn:
~t f i CF 1,4,6 -ter 67A7uti1 RE: LrTS ~ 13a.
Eve ~u'~sS ~J51~~55 C~~nJT~
We are sending you the following: Attached ❑ Under Separate Cover Via:
❑ Invoice [R15'rints ❑ Plans ❑ Contractor Invoice ❑ Bid Books ❑ Specifications ❑ Change Order
❑ Other
Copies Date No, DesPtion
These are transmitted as follows
❑ For Approval ❑ Approved as Submitted
0"For your use ❑ Approved except as noted
Sets to be approved and returned to me
Copies for your files
D?rAs Requested ❑ Resubmitted after Revisions
❑ For Review Comments ❑ Other
Corrected Prints
REMARKS: 1~~16in,4J5 NA✓E / a,4.OG AC '/&/z L ,?j F~,yb~✓L &GG
lZLZRTi./~ 7a 7, cu)Rc.LS -5a~eqe tc19 `Ted .W 645 &AkS ,
COPY TO: SIGNED: has
07/16/99 16:54 '2409 764 3496 DEVELOPMENT SVr,S
DATE:
FACSIMILE COVER
SHEET
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 South Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone (409) 764-3570 Fax (409) 764-3496
4 PAGES INCLUDING COVER y
If you d not receive a complete f" please call our office immediately for a new transmillal.
2001
TO: t,1 tCA.cA.
coNTANY-
DEFARTINENT: FAX: - 3 li 9
ITT 7lZylm. - _
{ rrr Yt%XT 0 - FAX: I
falie Ruiz - Steve-
From: Jim Callaway
To: internet:MMDesign@myriad.net
Date: Wed, Jul 21, 1999 4:43 PM
Subject: Steve-
Steve-
I've looked over the site plans you brought in. Several items are missing. Some are civil items that
might be on drawings prepared by others but we do not have them here. Items that need to be added
are:
1. Utility meter locations.
2. Dimensions of parking spaces, driveways and parking circulation aisles. Items,
such as parking spaces and aisles between rows of spaces, can be dimensioned as "typical"
3. Dimensions/area (sq. ft.) of parking islands.
4. A tabulation of parking spaces in a note or table- spaces required, spaces provided.
5. Existing/proposed utilities (line size and location).
6. Fire hydrants (existing or proposed).
7. Curb and pavement detail.
8. Notation that irrigation to be provided prior to issuance of CO.
9. Sidewalks (if existing or proposed).
10. Location of transformers, AC units or other equipment that may require screening.
There are some written comments/suggestions on the landscaping plans you brought in- Natalie Ruiz,
764-3570, has those plans- you can come in or send someone in to go over those.
Natalie is reserving time for you at 11:00 Friday morning if you need to meet or discuss anything.
The above list of items is based on a quick review by me- it is possible I missed some things.
Page 1
CC: Jane Kee, Natalie Ruiz, Sabine McCully
falie Ruiz - marriot development permit
From: Veronica Morgan
To: Amber Kelly, Lisa Hankins, Melissa Rodgers
Date: Fri, Jul 23, 1999 10:47 PM
Subject: marriot development permit
larry will be coming by to pick up the permit that i printed for his development on rock prairie road
(commercial building). since i dont have access to by i couldnt print out the permit in hte.. so i had to use
the old way and give it an old number. i have the pink dp folder with the permit in it in the pick up box.
when he pays the fees can ya'II take them in the old way (not in hte) since i couldnt put the permit in hte.
thanks
v
p.s. give larry a copy of the permit and the grading plan which is attached.... and grace the original and
folder so she can distribute the dp. thanks again.
Page 1
CC: Deborah Grace, Natalie Ruiz
falie Ruiz - Status of Marriot commercial project
From: Veronica Morgan
To: Carl Warren, Jeff Tondre, Jim Callaway, Natalie...
Date: Fri, Jul 23, 1999 10:34 PM
Subject: Status of Marriot commercial project
i have reviewed the drainage report and grading plan submitted by mcclure on this project. the redlines
are on ambers desk with a note to call mcclure Monday morning and let them know they are ready to be
picked up. they are pretty clean, a few minor comments.
i called lany Friday around 4pm to tell him he could come by and get a rough grading permit (the plans
are close enough that this would be ok). he wasnt in so i told glenda. she will relay to larry and he will be
by Monday morning to get it and sign it. it is in the pick up box. the application has not been submitted
nor the fees. i left a note on the permit for him to fill out the attached application and what the permit
fees would be which at this point i believe will only be $100. i'II know more when we finish review of the
site plan (i.e. hydrants)
the site plan i have left on natalies desk it is incomplete. it is the one jim told larry had things missing. I'm
not sure from jim's conversation if m-m is bringing in another one or they are expecting us to review this
one and send it back with comments. i did add another comment to the site plan over and above what
jim wrote b/c the detention pond affects some of the proposed plantings.
thats all. good luck with this while I'm gone.
v
Page 1
CC: Amber Kelly
COLLEGE STATION
P. O. Box 9960 1101 Texas Avenue College Station, TX 77842
Tel: 409 764 3500
MEMORANDUM
August 10, 1999
TO: Larry Mariott, Via Fax (409) 693-3398
FROM: Bridgette George, Asst. Development Coordinat r
SUBJECT: Marioff Homes, Inc. - Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list
of staff review comments detailing items that need to be addressed. Please address
the comments and submit the following information for plan approval and distribution:
Six (6) revised site and landscaping plans.
If there are comments that you are not addressing with the revised site plan, please
attach a letter explaining the details. If you have any questions or need additional
information, please call me at 764-3570.
The following are conditions of the building permit:
Impact fees in the amount of $434.66 are due prior to issuance;
A minimum 20' driveway width must be constructed with Phase I for the
travel aisle between this office and the Brackett Office Building; and,
The detention pond must be constructed with Phase I before the C.O. is
issued for either building.
Attachments: Staff review comments
CC: Ben Sasse, M&M Designs, Via Fax (409) 268-7234
Case file #99-434
Home of Texas A&M University
Bride a Geo a Marriott comments. per Jennifer Reeves Page 1
From: Amber Kelly
To: Bridgefte George; Natalie Ruiz
Date: 8/10/99 4:08PM
Subject: Marriott comments per Jennifer Reeves
1), Developer responsible for installing all conduit per city specs and design.
2). Also responsible for pouring transformer pad and Jennifer or Tony will need load info.
3). Developer responsible for 20% total service cost.
4). Provide easements fto cover electrical utilities.
FACSIMILE COVER SHEET
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (409)764-3570 / Fax (409)764-3496
/0
Date: August , 1999 # of pages including cover: 2
Ifyou did not receive a complete fax, please call our office immediately for a new transmittal.
TO: Larry Mariott FAX: (409) 693-3398
COMPANY: Mariott Homes, Inc.
RE: Mariott Homes, Inc. Site Plan
FROM: Bridgette Geome PHONE: (409)764-3570
COMPANY: City of College Station
REMARKS: E] Urgent ❑ For your review ❑ Replay ASAP ® FYI
The following is a list of comments from our electrical department
re-~zardimz the above-mentioned project. Please call me if you have any
questions.
Thank you, Bridgette
08/16/99 08:24 %Y409 764 3496 DEVELOPMENT SVCS 10001
ACTIVITY REPORT
TRANSMISSION OK
TX/RX NO. 8751
CONNECTION TEL 96933398
CONNECTION ID
START TIME 08/16 08:23
USAGE TIME 00'30
PAGES 1
RESULT OK
08/16/99 08:27 %T409 764 3496 DEVELOPMENT SVCS 10001
* ACTIVITY REPORT
TRANSMISSION OK
TX/RX NO. 8754
CONNECTION TEL 96933398
CONNECTION ID
START TIME 08/16 08:27
USAGE TIME 00'24
PAGES 1
RESULT OK
08/11/99 08:46 %Y409 764 3496 DEVELOPMENT SVCS
I9 0 01
~k k ACTIVITY REPORT kx k
TRANSMISSION OK
TX/RX NO. 8691
CONNECTION TEL 9p6933398
CONNECTION ID
START TIME 08/11 08:45
USAGE TIME 00'39
PAGES 1
RESULT OK
A8/10/99 15:01 02409 764 3496 DEVELOPMENT SVCS
10001
xx ACTIVITY REPORT*
TRANSMISSION OK
TX/RX NO.
8683
CONNECTION TEL
92687234
CONNECTION ID
START TIME
08/10 15:01
USAGE TIME
00'38
PAGES
2
RESULT
OK
STAFF REVIEW COMMENTS
No. 1
Project: Mariott Homes, Inc.
J1. Change the "68' Private Access Easement" to a "68' Private Drainage and
Access Easement."
Include a note under General Notes that states, "There is no floodplain or
floodway on the site."
,/3. Show location and size of sewer service.
,/4. Label the transformer location.
-5. Provide length dimension for the Curb & Gutter detail.
-6. The landscape points per parking space are not required. Total point
requirement is 1294 not 1550.
-/7. Clarify the location and dimensions of the P.U.E. along Rock Prairie Road.
Reviewed by: Edwin Hard Date: August 6, 1999
Staff Review Comments
Page 1 of 1
~ r '~,i i.. , . , < a
r,
I-rl 11
a
r
r fry { i
c
6 c ~ ~
r
~.I F
U--A I ~l
t
,
f,
f ~or ~ r ~QS. ,
Ol Q :n,.'•~ _ - 1,
l f'
f} ,
f Al
JU.
f. /Zd • x
;A4V
r
F-- 1%
sf~
i 76,
all,
t
l s
414
' J
r
f
•
agyaL-
Cam.. la J~ 6L ~ .
A
!0
1 / ^
~ ~ f 9
L6
r