Loading...
HomeMy WebLinkAboutMiscNO\ ~V c1~ ~ Site Plan F 1,'Show throat distance RED LINES COVENANT FAMILY CHURCH Ks- Shown on sheet 1 and 2 - 65.7' f 2) Provide screening (fence) between parking lot and residential site Shown on sheet 2 key note 14. Note: Covenant Family has bought the property to the north of them and would like to know if they still have to have a screening fence. t7f, rrt s \//3) Provide barricade plan for existing 14" mesquite and 4" elm Barricade plan shown on sheet 2 key note 16. Residential call out for driveway Shown on sheet 1 and 2 - "Residential Driveway" 5) Need detail for safety end treatments Detail shown on sheet 1 and reference on sheet 2 key note 1 6) Need embedment detail for ADS pipe Detail shown on sheet 1 and reference on sheet 2 key note 10 TxDOT Permit 1) Show where curb ends Shown on plan/profile and sheet 2-curb ends at right-of-way per conversation with Terry at TxDOT. 2) Show detail for driveway connection Copy of detail made for TxDOT permit and detail added to sheet 2 3) Show Copy detail of for detail safety made made and treatments for for TxDOT permit "I C of detail TxDOT permit Copy Report Drainage Drainage Report Q runoff 1 under Pre Developed 1) 1 Edit Edit table table under Pre and d Post-Developed runoff add labels ~9q _ `A add labels ~.~a,^_~ revise Q's ~ mow„` revise Q's ~ 5i r ~ L PIP ~-tea 2) Provide grate inlet ~ ' i✓, 2) Provide grate inlet calculations r9 V calculations "p~j ~ added to report under under Storage Depth in Parking Lot ~w added to report Storage Depth in Parking Lot JC 3) Check downstream channel capacity below the 36" culvert see "Channel Downstream of 36" C.M.P. under Marcy Lane" in drainage report 1104 70ct 0 i 4) Check area of drainage area 2 is it 17.4 or 17.53? Area should be 17.53 5) Change c-value for drainage area 4 and area due to #4 ` c-value changed to 0.4203, area changed to 18.80 6) Flow Master sheet for 24" C.M.P. is for 1.5' depth ~v changed to 2' depth V~ 7) Is protection required downstream of 24" C.M.P. and 24" ADS? Yes. Riprap has been added downstream of both drainage structures. See sheet 2 key note 15 8) Existing 36" C.M.P. - compare velocity pre and post. Does it require protection? Velocity is increased by 0.23 ft/s. Increase assumed negligible in regards to increased erosion downstream. See report under 36" C.M.P. (Aqqn COLLEGE STATION P. O. Box 9960 1101 Texas Avenue College Station, TX 77842 Tel: 409 764 3500 MEMORANDUM TO: Planning and Zoning Commission FROM: Sabine M°Cully, Senior Planner Y ` DATE: August 12, 1999 RE: Covenant Family Church parking lot revisions In the near future, you may notice that there will be a new parking lot installed at the Covenant Family Church located at 4010 Harvey Road, at the intersection with Marcy Lane. Ordinarily, Staff would have required review by the Planning and Zoning Commission as the parking lot would have constituted a significant site change to a conditional use. However, due to some misunderstandings, the site plan was inadvertently approved without Commission action. The site plan for the parking lot was submitted in April of this year as a site plan only, not as a Conditional Use Permit. The reviewing Staff therefore assumed that the parking lot was simply a requested improvement to an existing parking lot, which would not require the Commission's approval. In July, Staff became aware of the fact that the proposed parking lot would actually expand the existing development and was not just a replacement of a gravel lot for an improved lot. Due to the fact that the site plan had conditional approval, and thus any Commission review would have been retroactive, we did not forward the plan. We apologize for this oversight and will strive to assure that there will be no recurrence of such an incident. C:\My Documentsbldfiles\DOCFILES\MEMOS.DOC\covenant church.doc Home of Texas A&M University 1alie Ruiz - covenant family church From: Natalie Ruiz To: Jane Kee, Sabine McCully, Veronica Morgan Subject: covenant family church filenote: it was decided that sabine would write a memo to the p&z re: lack of cup on the covenent parking lot site plan. sabine should copy stacy king with kling on this (stacy needs to have this for her records). this email is being sent as a reminder and it is really from v. v Page 1 6 C DvENt~~ ~iw►+ ~7,Y rccH (Z``f i~1r e<.a ~ 9 - ~f/? lAolae Z~6wo.~ GaN2*5 6.447ll W14-e fvvts dxA.C"rxy dIt 1117 30. ret gip pr4 o* eotA.-~ ,h.-~ 9. /2a s tea. 4-5 ik A 1-44- e^-- , s. / ~~?~Q. ~~nfi~.~A-~C~~a,~r lScti. cx~~z•~:,~ ~.,?s~s ~ ,o.~.Q ~'/,y. hY ar,NGS~ ~3 rem- ~.o.. "y►'c~ it ~ t (Jt~JTi Cat..U o...+- T-a►L Qtic`ue . S.t ,6V`ea (4/716 8 SF) U Covenant Family Church Site Plan Review for proposed parking lot Areas of concern or need of correction: 1) 470 person sanctuary x .33 =155. 1 required spaces (rather than the 165 spaces required indicated on plan.) t. 4- pz-w ( ) Jk) Need to submit a Drainage pl a increase in impervious surface. J) Need to submit a Landscape/Streetscape plan. 4OX ~j AVax~~ ~t mow- - Al MEMORANDUM April 9, 1999 TO: Stacy King, Kling Egineering and Surveying (Via fax 846-8252) FROM: Bridgette George, Asst. Development Coordinator SUBJECT: Covenant Family Church Site Plan Staff reviewed the above-mentioned site plan as requested. The following is a list of items that need to be addressed: The required number of parking spaces is 155.1 (470 person sanctuary x.33); Show or note whether the driveway to the east is residential or commercial. Submit a TXDOT permit; Create an end island for the new parking row (shown on the attached page); and Clarify the throat length dimension. Please address the above-mentioned items and submit the following information by Tuesday, April 13, 1999 for further staff review. Drainage Plan and Report (letter) due to the increase in impervious surface; Landscape/Streetscape Plan; Irrigation system plan and irrigation demands. Two (2) copies of the revised site plan. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764-3570. cc: Covenant Family Church, P. O. Box 10152, College Station, TX, 77842 (Via fax#776-5498) Aase file #99-417 COLLEGE STATION P. O. Box 9960 • 1101 Texas Avenue Tel: 409 764 3500 MEMORANDUM College Station, TX 77842 TO: Stacy King, Kling Engineerin4and g ` FROM: Natalie Ruiz, Development Cor DATE:June 29, 1999 RE: Covenant Family Church Site Plan Staff reviewed the above mentioned site plan as requested. Attached are the redlined sitelgrading plan, landscape plan, TxDOT driveway permit and drainage report. Please address the staff comments and submit the following information by a Monday at 10:00 a.m. for further staff review: Two (2) copies of the revised site, drainage and landscape plans; Two (2) copies of the revised drainage report; and, Tt e (3) copies of the revised TxDOT driveway permit to be forwarded to TxDOT for treview and approval. The attached redlined site plans, drainage report and TxDOT driveway permit with staff comments. If there are comments that you are not addressing with the revised plans, please attach a letter explaining the details. If you have any questions, please call me at 764-3570. Thanks! Attachments: Redlined Site, Landscape & Drainage Plan (2 sheets) Drainage Report TxDOT Driveway Permit Cc: Covenant Family Church, Via fax #776-5498 (w(o attachments) Case file #99417 Home of Texas A&M University R. , . , r UtNIVW K. nwiMwv~.n LARRY Wz' do _ PEGGY. GRANZIN ~so . .1.53 ACRES 0 69 ACRES ..a spy., - ~T 1k , 3t2 e2 24 .24.0' 2~A' SCALE. 1'-40' R ia.o ' 8A 14 0AW UK ftxm P05T r . } . • lIRS. 5 67.42'x•1 Y ~ t .7a- 5 ¢2',~J''03" 1 6 3S^' t a Z44 2 XW <17i MT,-- 774- lap so- THROAT IET " 'ayr-200. Vy, ~ ~w.~nr. .r q ! s' S r?. 00 • KW. N ON 19.•#: J SLAB -CI- 27 IT 01 9.0 310 • _ * • •a BENCHMARK "B": ON SPON)LE 'SE7 1N~ ELEVATION: 30675 r=-~- 6\ • 4q. TOE OF. SIAM .r, ` + v;w 17 A s srs~~o3Naa0.a~~ 4 . w6w _ 37 i _ yam` T•S .a 'ilr=••~ ' ~1y ~i•}. •`14.1:. - •rti.