HomeMy WebLinkAboutMinutesSTAFF REVIEW COMMENTS
No. 1
Project: Cat Hollow - Phase 2
,V
7
x
L- U\
;/I. We recommend that you draw in a phase line between Phase 2 and the
reserve tract labeling it Phase 3. That way it won't matter if one area decides
to final plat first, and the option is still available to final plat simultaneously.
Remember to revise the title block to reflect this change.
,/2. The setback note, #5, and the setbacks shown on the plat are not necessary.
It is required that setbacks meet the ordinance and will be checked at time of
site review. You do not have to remove them from the preliminary plat, but
we will not want to see them on the final plat.
Reviewed by: Jessica Jimmerson Date: 11/9/1999
Staff Review Comments
Page 1 of 1
STAFF REPORT
Item: Consideration of a Preliminary Plat of 11.54 acres for Cat Hollow II, Phases 2 and
3, located east of Glenhaven Drive and south of Richard Carter Park. (99-168/99-317)
Applicant: Wayne Cotter
Item Summary:
The applicant is proposing to subdivide the subject property into 22 residential lots in
Phase 2 and one large 5-acre lot in Phase 3. The property is zoned R-1, Single Family
residential and shown on the Land Use Plan as medium density single family. Dwelling
units per acre should be between 3-6 for medium density single family. Phase 2 will have
approximately 3.36 dwelling units per acre.
Item Background: In 1997 a church CUP, use only, was granted for the property shown
as Phase 3. Since a building permit was not issued on the property within 12 months, the
use permit has expired. However, the property is still owned by the church and they may
come before the Commission for a new CUP on the property.
Budgetary & Financial Summary: N/A
Staff Recommendations: Staff recommends approval with the condition that sewer
service be extended to Phase 3.
Related Advisory Board Recommendations: N/A
Commission Action Options:
The Commission has final authority over the preliminary plat. The options are approval as
submitted, approval with conditions, or denial. Defer action or table only at the
application request.
Supporting Materials:
1. Location Map
2. Application
3. Infrastructure and Facilities
4. Copy of Preliminary Plat
J:\PZTEXT\PZ02314.DOC Page 1 of 2
INFRASTRUCTURE AND FACILITIES
Water: There is an existing 8" water line on the west side of Glenhaven.
Water for Phase 2 will be extended across Glenhaven and other lines will be
extended into the property as required for site development. There is a 12"
water line that runs along the frontage road adjacent to Phase 3, which is
adequate to support its future development.
Sewer: For Phase 2, the developer is extending the necessary infrastructure
into the property that is required for site development. However, the developer
will need to extend sewer service through Phase 2 to provide Phase 3 with sewer
service.
Streets: Two residential cul-de-sacs that take access from Glenhaven, which is
a major collector, will provide access to Phase 2. Phase 3 will be able to take
access from the S.H.6 frontage road.
Off-site Easements: N/A
Drainage: For Phase 2 on site detention is being provided. Phase 3 drainage
issues will be addressed at time of site plan.
Flood Plain: N/A
Oversize request: See Budgetary and Financial Summary Section.
Impact Fees: N/A
Sidewalks: A sidewalk is required along Glenhaven.
Parkland Dedication: The 22 single family residential lots in Phase 2, will be
required to pay Parkland Dedication fees.
NOTIFICATION:
Advertised Commission Hearing Dates(s): 12-2-99
Response Received: None as of date of staff report
J:\PZTEXT1PZ02314.DOC Page 2 of 2
w Transportation Planner Hard presented the staff report. He explained that the Master Development
Plan was never prepared for the Emerald Forest Subdivision. As part of Staff's review of the final
phase (Phase 11), it was determined that the Master Development Plan, showing the parent tract of this
subdivision, would be required. This would allow staff to assess infrastructure needs in the final phase,
as well as for the immediate area to the east of Emerald Forest. The preliminary plat for Phase 11 will
be scheduled for the next Commission meeting. Since this Master Development Plan is, for the most
part, being done "after the fact", it primarily reflects the existing streets, lots, and park already
developed in Emerald Forest. The only phase shown on the master plan not currently developed is
Phase 11. There are 394 existing lots in the subdivision with an additional 55 lots proposed in the final
phase, at full build out the subdivision will have 449 lots. The Comprehensive Plan shows a bike path
and a linear park along the large utility easement extending along the eastside of the subdivision. The
developer will dedicate the area (approximately 13 acres) for the bike path/linear park as part of the
platting and development of Phase 11. Staff recommended approval with the condition that the phase
line for Phase 11 is clarified and the reserve areas are labeled.
Commissioner Kaiser was concerned that the land dedicated would be unusable and asked for
assurance that the dedicated land would be actually developed as a park.
Mr. Hard explained that through discussions it was determined that the land would serve as a buffer
between the residential subdivision and the Wastewater Treatment Plant.
Commissioner Warren asked if this new subdivision met the regulations to the distance between a
residential area and Wastewater Treatment Plant. Mr. Hard explained that the existing residential
development would be closer to the plant than the proposed Phase 11. Assistant City Attorney
explained that there is a state law requirement for buffer zones, but was unsure of the TNRCC
regulations. She said that this proposal was in excess of the state law requirements.
Deborah Keating (Urban Design Group), the applicant, was present to answer questions.
Commissioner Floyd moved to approve the Master Development Plan with staff conditions.
Commissioner Horlen seconded the motion, which passed unopposed (6-0).
AGENDA ITEM NO. 4: Consideration of a Preliminary Plat of 11.54 acres for Cat Hollow II,
Phases 2 and 3 located east of Glenhaven Drive and south of Richard Carter Park. (99-317)
Staff Planner Jimmerson presented the staff report and explained that the applicant's proposal is to
subdivide the subject property into 22 residential lots in Phase 2 and one large 5-acre lot in Phase 3.
The property is zoned R-1 Single Family Residential and shown on the Land Use Plan as medium
density single family. She explained that the developer would need to extend the sewer service
through Phase 2 to provide Phase 3 with sewer service. Staff recommended approval of the
preliminary plat with the condition that sewer service is extended to Phase 3.
Commissioner Floyd asked if the offsetting of the streets would impose any safety concerns. Ms.
Jimmerson said that staff looked at the alignment of the streets closely, which meet the 125 feet
distance between offset streets as required in the Subdivision Regulations. She said that the proposed
plat seemed to be the best layout for the use of the property.
P&Z Minutes December 2, 1999 Page 2 of 6
Commissioner Mooney moved to approve the preliminary plat with the condition that the sewer service
is extended to Phase 3. Commissioner Warren seconded the motion, which passed 5-1; Commission
Horlen voted in opposition to the motion.
AGENDA ITEM NO. 5: Public hearing and consideration of a Rezoning request for the
proposed Gateway Subdivision from C-B Business Commercial to R-5 Apartment Medium
Density. (99-128)
Senior Planner McCully presented the staff report. She explained that the subject property is a
triangular piece of land requested to be rezoned so that the existing R-5 will align with a proposed
ownership boundary. The proposed Gateway subdivision consists of a future mix of C-B and R-5
development, which is consistent with the Land Use Plan and with the zoning decisions that took place
around five years ago. The Commission has reviewed preliminary plats on the entire Gateway area as
well as final plats for smaller portions. Staff recommended approval.
Chairman Rife opened the public hearing. Seeing no one present to speak in opposition to or in favor
of the request, the public hearing was closed.
Commissioner Horlen moved to recommend approval of the rezoning request. Commissioner Floyd
seconded the motion, which passed unopposed 6-0.
Chairman Rife removed himself from the position of chairman and asked Commissioner Mooney to
take over the responsibilities for the next agenda item.
AGENDA ITEM NO. 6: Public hearing and consideration of a Conditional Use Permit, use for
the development of a new parking lot for the Justice-of-the-Peace Office No. 6, located on the
southwest corner of the intersection of George Bush and Anderson Drives. (99-729)
Transportation Planner Hard presented the staff report and explained that the applicant is requesting
permission to construct a new parking lot for the JP #6 facility. The existing parking to this facility is
limited to "head-in" parking spaces directly off of George Bush and Anderson Drive. The City as part
of its on-going widening of this roadway removed the spaces on Anderson. Pending approval of this
Conditional Use Permit, the City and the CSISD will consider an agreement whereby the City's
contractor will construct the proposed parking lot as part of the Anderson widening project. The
existing head-in parking spaces, which do not meet ordinance requirements, will be removed as part of
the new parking lot construction. Access to the new parking lot will be taken from a single access
point off of Anderson Drive. The site will not have a curb cut to Bush Drive. Under the driveway
ordinance, the proposed curb cut on Anderson should have been about 20 feet further from Bush Drive.
This curb cut could not be moved to meet the minimum ordinance requirement due to a new detention
pond being developed immediately south of the site. The existing JP office building requires 11
parking spaces, but the current parking does not meet this requirement. The proposed parking lot
includes 35 spaces to allow for future expansion of the JP office building. The expansion of the
building is not included as part of this request. The site is just a very small portion of a large parcel
bounded by Bush, Holik, Anderson, and Park Place owned by the CSISD. This large parcel is zoned
R-1 and is the future site of A&M Consolidated Middle School (formerly Willow Branch
Intermediate).
P&Z Minutes December 2, 1999 Page 3 of 6