Loading...
HomeMy WebLinkAboutHester Engineering DocumentsHESTER ENGINEERING COMPANY 7607 EASTMARK DRIVE, SUITE 253-B COLLEGE STATION, TEXAS 77840 409.693.1100 FX:409.693.1075 EMAIL: HEC@GKG.NET SEPTEMBER 28, 1999 HONORABLE MAYOR AND CITY COUNCIL CITY OF COLLEGE STATION P.O. Box 9960 COLLEGE STATION, TX 77842 RE: BRIDLE GATE ESTATES SUBDIVISION (FORMERLY RIDGEWOOD ESTATES) OVERSIZE PARTICIPATION REQUEST HONORABLE MAYOR AND CITY COUNCIL, MR. ALTON OFCZARZAK, THE OWNER OF OAKWOOD CUSTOM HOMES, INC., IS PROPOSING TO DEVELOP A 21.1 ACRE TRACT OF LAND APPROXIMATELY 600 FEET SOUTH OF GRAHAM ROAD. MR. OFCZARZAK PLANS TO DEVELOP 19.7 ACRES OF THE LAND INTO 53 SINGLE FAMILY RESIDENTIAL HOMES AND 1.4 ACRES INTO AN OFFICE SITE FOR OAKWOOD CUSTOM HOMES. MR. OFCZARZAK WOULD LIKE TO REQUEST YOUR CONSIDERATION OF PROVIDING CITY PARTICIPATION FOR THE CONSTRUCTION OF BRIDLE GATE DRIVE. THE MASTER DEVELOPMENT PLAN FOR THIS DEVELOPMENT WAS RECENTLY APPROVED AND THE DEVELOPMENT SERVICES DEPARTMENT STAFF REQUIRED THAT BRIDLE GATE DRIVE BE CONSTRUCTED AS A MINOR COLLECTOR. THE ESTIMATED NUMBER OF VEHICLES PER DAY GENERATED BY A DEVELOPMENT OF THIS SIZE IS 851 AND A LOCAL STREET SECTION WOULD BE SUFFICIENT FOR THIS ROADWAY. THIS IS BASED ON THE COLLEGE STATION DEVELOPMENT SERVICES SUBDIVISION REGULATIONS, TABLE I, PAGE 9-18 WHICH STATES THE VOLUME RANGE GUIDELINE IS 200 TO 1000 (VEHICLES/DAY) FOR LOCAL STREET SECTIONS. TRAFFIC VOLUME ANALYSIS USING THE INSTITUTE OF TRANSPORTATION ENGINEERS, "TRIP GENERATION", JANUARY 1991 CHART FOR "SINGLE-FAMILY DETACHED HOUSING, PAGE 257: -THE AVERAGE TRIP GENERATION FOR SINGLE FAMILY RESIDENTIAL DWELLING UNITS IS 9.55 AND 53 UNITS WILL GENERATE 507 VEHICLES PER DAY. AND TABLE 4: "GENERAL OFFICE BUILDING TRIP GENERATION", PAGE 942 -PROPOSED BUILDINGS OF 14000 SQUARE FEET WILL GENERATE 344 VEHICLES PER DAY. FOR A TOTAL OF 851 VEHICLES PER DAY. BRIDLE GATE ESTATES - PHASE ONE BRIDLE GATE DRIVE - 38' B-B PAVEMENT SECTION - 60' ROW SEPTEMBER 23, 1999 ENGINEERS QUANTITY AND COST ESTIMATE OF CONSTRUCTION COST ITEM DESCRIPTION UNITS QTY. NIT PRICE EXTENSION I LAND COST AC. 1.28 $12,085.00 $15,469 2 CLEARING ROW AC. 1.28 $2,000.00 $2,560 3 ROADWAY EXCAVATION (IN PLACE) C.Y. 1561 $3.00 $4,683 4 6" STABILIZED SUBGRADE (4%) S. Y. 4421 $3.00 $13,263 5 EXTRA LIME (TYPE A) UP TO 6% TONS 18.0 $90.00 $1,620 6 7" GRAVEL BASE BETWEEN CaG S. Y. 3724 $7.00 $26,068 7 1.5" H.M.A.C S. Y. 3724 $5.50 $20,482 8 CURB AND GUTTER L. F. 1500 $7.00 $10,500 9 4' WIDE SIDEWALK S. F. 6748 $3.00 $20,244 10 SIDEWALK RAMP EA. 10 $450.00 $4,500 II RE-VEGATATION S. Y. 1369 $0.50 $685 12 DRAINAGE STRUCTURE DS-I L. S. 1 $3,000.00 $3,000 13 DITCH EXCAVATION C. Y. 530 $3.00 $1,590 14 RE-VEGETATION S. Y. 1660 $0.50 $830 15 8" PVC WATERLINE L. F. 914 $20.00 $18,280 16 24"X8" TAPPING SLEEVE a VALVE L. S. 1 $5,500.00 $5,500 17 8"X6"CROSS EA. 2 $600.00 $1,200 18 8" VALVE a BOX EA. 2 $750.00 $1,500 19 8" TEE EA. 1 $500.00 $500 20 6" VALVES @ BRIDLE COURT EA. 2 $500.00 $1,000 21 STD. FIRE HYDRANT EA. 2 $1,750.00 $3,500 22 WET CONNECTION EA. 1 $500.00 $500 23 BLOW OFF ASSEMBLY EA. 1 $375.00 $375 24 EROSION a SEDIM. CONTROL LS. 1 $1,000.00 $1,000 25 TRENCH SAFETY LS. 1 $1,000.00 $1,000 26 END OF ROAD SIGNAGE (5'O.C.) EA. 8 $80.00 $640 27 PERFORMANCE a PAYMENT BOND EA. 1 $2,175 $2,175 LAND COST = $15,469 TOTAL PAVEMENT $104,605 TOTAL DRAINAGE $5,420 TOTAL WATER LINE _ $32,355 MISCELLANEOUS = $4,815 TOTAL ESTIMATED CON STRUCTION COST $162,664 BRIDLE GATE ESTATES N PHASE ONE BRIDLE GATE DRIVE - 27' B-B PAVEMENT SECTION - 50' ROW SEPTEMBER 27, 1999 ENGINEERS QUANTITY AND COST ESTIMATE OF CONSTRUCTION COST ITEM DESCRIPTION UNITS QTY. NIT PRICE EXTENSION I LAND COST AC. 1.08 $12,085.00 $13,052 2 CLEARING ROW AC. 1.08 $2,000.00 $2,160 3 ROADWAY EXCAVATION (IN PLACE) C. Y. 1200 $3.00 $3,600 4 6" STABILIZED SUBGRADE (4%) S. Y. 3227 $3.00 $9,681 5 EXTRA LIME (TYPE A) UP TO 6% TONS 14.0 $90.00 $1,260 6 6" GRAVEL BASE BETWEEN C&G S. Y. 2534 $6.00 $15,204 7 1.5" H.M.A.C S. Y. 2534 $5.50 $13,937 8 CURB AND GUTTER L. F. 1501 $7.00 $10,507 9 4' WIDE SIDEWALK S. F. 3240 $3.00 $9,720 10 SIDEWALK RAMP EA. 6 $450.00 $2,700 11 RE-VEGATATION S. Y. 1326 $0.50 $663 12 DRAINAGE STRUCTURE DS-I L. S. 1 $3,000.00 $3,000 13 DITCH EXCAVATION C. Y. 530 $3.00 $1,590 14 RE-VEGETATION S. Y. 1660 $0.50 $830 15 8" PVC WATERLINE L. F. 914 $20.00 $18,280 16 24"X8" TAPPING SLEEVE & VALVE L. S. 1 $5,500.00 $5,500 17 8"X6"CROSS EA. 2 $600.00 $1,200 18 8" VALVE & BOX EA. 2 $750.00 $1,500 19 8" TEE EA. 1 $500.00 $500 20 6" VALVES @ BRIDLE COURT EA. 2 $500.00 $1,000 21 STD. FIRE HYDRANT EA. 2 $1,750.00 $3,500 22 WET CONNECTION EA. 1 $500.00 $500 23 BLOW OFF ASSEMBLY EA. 1 $375.00 $375 24 EROSION & SEDIM. CONTROL LS. 1 $1,000.00 $1,000 25 TRENCH SAFETY LS. 1 $1,000.00 $1,000 26 END OF ROAD SIGNAGE (5'O.C.) EA. 6 $80.00 $480 27 PERFORMANCE & PAYMENT BOND EA. 1 $1,645 $1,645 LAND COST = $13,052 TO TAL PAVEMENT $69,432 TOTAL DRAINAGE $5,420 TOTAL WATER LINE _ $32,355 MI SCELLANEOUS = $4,125 TOTAL ESTIMATED CONSTRUCTION COST $124,384 COST SUMMARY: BRIDLE GATE DRIVE OVERSIZE PARTICIPATION REQUEST $38,280 I HAVE PREPARED COST ESTIMATES FOR THE CONSTRUCTION COST OF THE ROADWAY SECTIONS FOR YOUR REVIEW. SEE ATTACHED SHEETS FOR ITEMIZED BREAKDOWN. THE DEVELOPER MR. OFCZARZAK IS A QUALITY BUILDER OF CUSTOM HOMES IN THE LOCAL AREA AND THIS DEVELOPMENT WILL BE A GREAT ADDITION TO A FINE CITY, PLEASE CONSIDER THIS REQUEST. RESPECTFU UBMITTED, _ CHAEL G H STER, P. E_ ATTACHMENTS: COST ESTIMATES P.8 A I -.7b q XC: ALTON OFCZARZAK, OAKWOOD CUSTOM HOMES, INC. FX: 694.8606 r HESTER ENGINEERING COMPANY 7607 EASTMARK DRIVE, SUITE 253-B COLLEGE STATION, TEXAS 77840 409.693.1100 FX:409.693.1075 EMAIL: HEC@GKG. NET SEPTEMBER 27, 1999 HONORABLE MAYOR AND CITY COUNCIL CITY OF COLLEGE STATION P.O. Box 9960 COLLEGE STATION, TX 77842 RE: BRIDLE GATE ESTATES SUBDIVISION (FORMERLY RIDGEWOOD ESTATES) OVERSIZE PARTICIPATION REQUEST HONORABLE MAYOR AND CITY COUNCIL, MR. ALTON OFCZARZAK, THE OWNER OF OAKWOOD CUSTOM HOMES, INC., IS PROPOSING TO DEVELOP A 21.1 ACRE TRACT OF LAND APPROXIMATELY 600 FEET SOUTH OF GRAHAM ROAD. MR. OFCZARZAK PLANS TO DEVELOP 19.7 ACRES OF THE LAND INTO 53 SINGLE FAMILY RESIDENTIAL HOMES AND 1.4 ACRES INTO AN OFFICE SITE FOR OAKWOOD CUSTOM HOMES. MR. OFCZARZAK WOULD LIKE TO REQUEST YOUR CONSIDERATION OF PROVIDING CITY PARTICIPATION FOR THE CONSTRUCTION OF BRIDLE GATE DRIVE. THE MASTER DEVELOPMENT PLAN FOR THIS DEVELOPMENT WAS RECENTLY APPROVED AND THE DEVELOPMENT SERVICES DEPARTMENT STAFF REQUIRED THAT BRIDLE GATE DRIVE BE CONSTRUCTED AS A MINOR COLLECTOR. THE ESTIMATED NUMBER OF VEHICLES PER DAY GENERATED BY A DEVELOPMENT OF THIS SIZE IS 851 AND A LOCAL STREET SECTION WOULD BE SUFFICIENT FOR THIS ROADWAY. THIS IS BASED ON THE COLLEGE STATION DEVELOPMENT SERVICES SUBDIVISION REGULATIONS, TABLE I, PAGE 9-18 WHICH STATES THE VOLUME RANGE GUIDELINE IS 200 TO 1000 (VEHICLES/DAY) FOR LOCAL STREET SECTIONS. TRAFFIC VOLUME ANALYSIS USING THE INSTITUTE OF TRANSPORTATION ENGINEERS, "TRIP GENERATION", JANUARY 1991 CHART FOR "SINGLE-FAMILY DETACHED HOUSING, PAGE 257: -THE AVERAGE TRIP GENERATION FOR SINGLE FAMILY RESIDENTIAL DWELLING UNITS IS 9.55 AND 53 UNITS WILL GENERATE 507 VEHICLES PER DAY. AND TABLE 4: "GENERAL OFFICE BUILDING TRIP GENERATION", PAGE 942 -PROPOSED BUILDINGS OF 14000 SQUARE FEET WILL GENERATE 344 VEHICLES PER DAY. FOR A TOTAL OF 851 VEHICLES PER DAY. COST SUMMARY: BRIDLE GATE DRIVE OVERSIZE PARTICIPATION REQUEST $35,846 I HAVE PREPARED COST ESTIMATES FOR THE CONSTRUCTION COST OF THE ROADWAY SECTIONS FOR YOUR REVIEW. SEE ATTACHED SHEETS FOR ITEMIZED BREAKDOWN. THE DEVELOPER MR. OFCZARZAK IS A QUALITY BUILDER OF CUSTOM HOMES IN THE LOCAL AREA AND THIS DEVELOPMENT WILL BE A GREAT ADDITION TO A FINE CITY, PLEASE CONSIDER THIS REQUEST. RUSPECTFUL,4'-'Y SNMITTED, AEL G. 2:TWER, P.E. ATTACHMEN ~•12 " COST ESTIMATES XC: ALTON OFCZARZAK, OAKWOOD CUSTOM HOMES, INC. FX: 694.8606 BRIDLE GATE ESTATES N PHASE ONE BRIDLE GATE DRIVE - 38' B-B PAVEMENT SECTION - 60' ROW SEPTEMBER 23, 1999 ENGINEERS QUANTITY AND COST ESTIMATE OF CONSTRUCTION COST ITEM DESCRIPTION UNITS QTY. UNIT PRICE EXTENSION I CLEARING ROW AC. 1.28 $2,000.00 $2,560 2 ROADWAY EXCAVATION (IN PLACE) C. Y. 1561 $3.00 $4,683 3 6" STABILIZED SUBGRADE (4%) S. Y. 4421 $3.00 $13,263 4 EXTRA LIME (TYPE A) UP TO 6% TONS 18.0 $90.00 $1,620 5 7" GRAVEL BASE BETWEEN C&G S. Y. 3724 $7.00 $26,068 7 1.5" H.M.A.C S. Y. 3724 $5.50 $20,482 8 CURB AND GUTTER L. F. 1500 $7.00 $10,500 9 4' WIDE SIDEWALK S. F. 6748 $3.00 $20,244 10 SIDEWALK RAMP EA. 10 $450.00 $4,500 11 RE-VEGATATION S. Y. 1369 $0.50 $685 12 DRAINAGE STRUCTURE DS-I L. S. 1 $3,000.00 $3,000 13 DITCH EXCAVATION C. Y. 530 $3.00 $1,590 14 RE-VEGETATION S. Y. 1660 $0.50 $830 15 8" PVC WATERLINE L. F. 914 $20.00 $18,280 16 24"X8" TAPPING SLEEVE & VALVE L. S. 1 $5,500.00 $5,500 17 8"X6"CROSS EA. 2 $600.00 $1,200 18 8" VALVE & BOX EA. 2 $750.00 $1,500 19 8" TEE EA. 1 $500.00 $500 20 6" VALVES @ BRIDLE COURT EA. 2 $500.00 $1,000 21 STD. FIRE HYDRANT EA. 2 $1,750.00 $3,500 22 WET CONNECTION EA. 1 $500.00 $500 23 BLOW OFF ASSEMBLY EA. 1 $375.00 $375 24 EROSION & SEDIM. CONTROL LS. 1 $1,000.00 $1,000 25 TRENCH SAFETY LS. 1 $1,000.00 $1,000 26 END OF ROAD SIGNAGE (5'O.C.) EA. 8 $80.00 $640 27 PERFORMANCE & PAYMENT BOND EA. 1 $2,158.00 $2,158 TOTAL PAVEMENT = $104,605 TOTAL DRAINAGE = $5,420 TOTAL WATER LINE = $32,355 MISCELLANEOUS = $4,798 TOTAL ESTIMATED CONSTRUCTION COST = $147,178 BRIDLE GATE ESTATES N PHASE ONE BRIDLE GATE DRIVE - 27' B-B PAVEMENT SECTION - 50' ROW SEPTEMBER 27, 1999 ENGINEERS QUANTITY AND COST ESTIMATE OF CONSTRUCTION COST ITEM DESCRIPTION UNITS QTY. UNIT PRICE EXTENSION I CLEARING ROW AC. 1.08 $2,000.00 $2,160 2 ROADWAY EXCAVATION (IN PLACE) C. Y. 1200 $3.00 $3,600 3 6" STABILIZED SUBGRADE (4%) S. Y. 3227 $3.00 $9,681 4 EXTRA LIME (TYPE A) UP TO 6% TONS 14.0 $90.00 $1,260 5 6" GRAVEL BASE BETWEEN C&G S. Y. 2534 $6.00 $15,204 7 1.5" H.M.A.C S. Y. 2534 $5.50 $13,937 8 CURB AND GUTTER L. F. 1501 $7.00 $10,507 9 4' WIDE SIDEWALK S. F. 3240 $3.00 $9,720 10 SIDEWALK RAMP EA. 6 $450.00 $2,700 II RE-VEGATATION S. Y. 1326 $0.50 $663 12 DRAINAGE STRUCTURE DS-I L. S. 1 $3,000.00 $3,000 13 DITCH EXCAVATION C. Y. 530 $3.00 $1,590 14 RE-VEGETATION S. Y. 1660 $0.50 $830 15 8" PVC WATERLINE L. F. 914 $20.00 $18,280 16 24"X8" TAPPING SLEEVE & VALVE L. S. 1 $5,500.00 $5,500 17 8"X6"CROSS EA. 2 $600.00 $1,200 18 8" VALVE & BOX EA. 2 $750.00 $1,500 19 8" TEE EA. 1 $500.00 $500 20 6" VALVES @ BRIDLE COURT EA. 2 $500.00 $1,000 21 STD. FIRE HYDRANT EA. 2 $1,750.00 $3,500 22 WET CONNECTION EA. 1 $500.00 $500 23 BLOW OFF ASSEMBLY EA. 1 $375.00 $375 24 EROSION & SEDIM. CONTROL LS. 1 $1,000.00 $1,000 25 TRENCH SAFETY LS. 1 $1,000.00 $1,000 26 END OF ROAD SIGNAGE (5'O.C.) EA. 6 $80.00 $480 27 PERFORMANCE & PAYMENT BOND EA. 1 $1,645.00 $1,645 TOTAL PAVEMENT = TOTAL DRAINAGE _ TOTAL WATER LINE _ MISCELLANEOUS = TOTAL ESTIMATED CONSTRUCTION COST = lp. e, 0 $69,432 $5,420 $32,355 $4,125 $111,332 HESTER ENGINEERING COMPANY 7607 EASTMARK DRIVE, SUITE 253-B COLLEGE STATIOIN, TEXAS 77840 409.693.1100 FX:409.693.1075 EMAIL: HEC@GKG.NET AUGUST 16, 1999 PLANNING 8, ZONING COMMISSION CITY OF COLLEGE STATION P.O. Box 9960 COLLEGE STATION, TX 77842 RE: BRIDLE GATE ESTATES SUBDIVISION (FORMERLY RIDGEWOOD ESTATES) PRELIMINARY PLAT STAFF REVIEW COMMENTS NO. I - 99-311 DEAR COMMISSIONERS, MR. ALTON OFCZARZAK, THE OWNER OF OAKWOOD CUSTOM HOMES, INC., IS PROPOSING TO DEVELOP A 19.2 ACRE TRACT OF LAND APPROXIMATELY 600 FEET SOUTH OF GRAHAM ROAD. MR. OFCZARZAK PLANS TO DEVELOP 17.6 ACRES OF THE LAND INTO 53 SINGLE FAMILY RESIDENTIAL HOMES AND 1.4 ACRES INTO AN OFFICE SITE FOR OAKWOOD CUSTOM HOMES. THE MASTER DEVELOPMENT PLAN FOR THIS DEVELOPMENT WAS RECENTLY APPROVED BY THE CITY COUNCIL AND THE PRELIMINARY PLAT WAS SUBMITTED FOR THE DEVELOPMENT SERVICES DEPARTMENT REVIEW. MR. OFCZARZAK IS REQUESTING YOUR CONSIDERATION OF WAIVING ITEM No. 2 LISTED IN THE STAFF REVIEW COMMENTS. ITEM No. 2 PERTAINS TO THE 30 FOOT WIDE LANDSCAPE BUFFER ALONG BLOCK 2, LOTS 1-8 WHICH WAS SHOWN ON THE MASTER DEVELOPMENT PLAN LOCATED ON THE RESIDENTIAL AREA. THE PRIMARY REASON IT WAS LOCATED IN THE RESIDENTIAL AREA WAS BECAUSE A DRAINAGE EASEMENT WAS COMBINED WITH IT. SINCE THAT TIME IT HAS BEEN DETERMINED THAT THE DRAINAGE EASEMENT CAN BE ELIMINATED AND THE STORM RUNOFF HANDLED IN THE DRAINAGE SYSTEM LOCATED ALONG BRIDLE TRAILS COURT. MR. OFCZARZAK WOULD APPRECIATE YOUR CONSIDERATION TO MOVE THE BUFFER TO THE COMMERCIAL AREA ALONG BLOCK 2, LOTS 1-8. BY ORDINANCE THE BUFFER REQUIREMENT IS FOR COMMERCIAL SITES NOT RESIDENTIAL SITES. MR. OFCZARZAK DOES NOT OWN NOR HAVE AN INTEREST IN THIS ADJACENT COMMERCIAL AREA. THE PRIMARY REASON FOR THIS REQUEST IS MAINTENANCE OF THE BUFFER. A FENCE WILL BE CONSTRUCTED ALONG THE REAR LOT LINES OF THE RESIDENTIAL LOTS AND THE INDIVIDUAL HOME OWNERS WILL NOT VOLUNTARILY MAINTAIN THE BUFFER. THE BEST SOLUTION TO THIS POTENTIAL MAINTENANCE AND AESTHETIC PROBLEM IS TO MOVE THE BUFFER TO THE COMMERCIAL SITE FOR THEIR MAINTENANCE. WE HAVE COMPLIED WITH THE OTHER STAFF REQUIREMENTS AND WOULD APPRECIATE YOUR CONSIDERATION OF THIS REQUEST. CTF LY 4 SUBMITTED, 4z &EL P . G. ESTER, P.E. XC: ALTON OFCZARZAK, OAKWOOD CUSTOM HOMES, INC. FX: 694.8606 HESTER ENGINEERING COMPANY 7607 EASTMARK DRIVE, SUITE 253-B COLLEGE STATIOIN, TEXAS 77840 409.693.1100 FX:409.693.1075 EMAIL: HEC@GKG.NET AUGUST 2, 1999 HONORABLE MAYOR AND CITY COUNCIL CITY OF COLLEGE STATION P.O. Box 9960 COLLEGE STATION, TX 77842 RE: BRIDLE GATE ESTATES SUBDIVISION (FORMERLY RIDGEWOOD ESTATES) OVERSIZE & RIGHT-OF-WAY PARTICIPATION REQUEST HONORABLE MAYOR AND CITY COUNCIL, MR. ALTON OFCZARZAK THE OWNER OF OAKWOOD CUSTOM HOMES, INC. IS PROPOSING TO DEVELOP A 19.2 ACRE TRACT OF LAND APPROXIMATELY 600 FEET SOUTH OF GRAHAM ROAD. MR. OFCZARZAK PLANS TO DEVELOP 17.6 ACRES OF THE LAND INTO 53 SINGLE FAMILY RESIDENTIAL HOME AND 1.4 ACRES INTO AN OFFICE SITE FOR OAKWOOD CUSTOM HOMES. ITEMS: MR. OFCZARZAK WOULD LIKE TO REQUEST YOUR CONSIDERATION OF PROVIDING CITY PARTICIPATION ON THREE I.) BRIDLE GATE DRIVE OVERSIZE PARTICIPATION 2.) LONGMIRE DRIVE OVERSIZE PARTICIPATION 3.) LONGMIRE DRIVE RIGHT-OF-WAY ACQUISITION THE MASTER DEVELOPMENT PLAN FOR THIS DEVELOPMENT WAS RECENTLY APPROVED AND THE DEVELOPMENT SERVICES STAFF REQUIRED THAT BRIDLE GATE DRIVE BE CONSTRUCTED AS A MINOR COLLECTOR AND LONGMIRE DRIVE AS A MAJOR COLLECTOR. THE ESTIMATED NUMBER OF VEHICLES PER DAY GENERATED BY A DEVELOPMENT OF THIS SIZE IS 640 AND A LOCAL STREET SECTION WOULD BE SUFFICIENT FOR THESE ROADWAYS. THIS IS BASED ON THE COLLEGE STATION DEVELOPMENT SERVICES SUBDIVISION REGULATIONS, TABLE I, PAGE 9-18 WHICH STATES THE VOLUME RANGE GUIDELINE IS 200 TO 1000 (VEHICLES/DAY) FOR LOCAL STREET SECTIONS. TRAFFIC VOLUME ANALYSIS USING THE INSTITUTE OF TRANSPORTATION ENGINEERS, "TRIP GENERATION", JANUARY 1991 CHART FOR "SINGLE-FAMILY DETACHED HOUSING, PAGE 257: -THE AVERAGE TRIP GENERATION FOR SINGLE FAMILY RESIDENTIAL DWELLING UNITS IS 9.55 AND 53 UNITS WILL GENERATE 507 VEHICLES PER DAY. AND TABLE 4: "GENERAL OFFICE BUILDING TRIP GENERATION", PAGE 942 -A BUILDING OF 5400 SQUARE FEET WILL GENERATE 133 VEHICLES PER DAY. FOR A TOTAL OF 640 VEHICLES PER DAY. ALSO MR. OFCZARZAK WOULD LIKE TO APPLY FOR THE FUNDS ALLOCATED FOR THE ACQUISITION OF THE RIGHT-OF-WAY OF LONGMIRE DRIVE WHICH WILL BECOME AVAILABLE IN COLLEGE STATIONS FISCAL YEAR 2000. I HAVE PREPARED COST ESTIMATES FOR THE OVERSIZE PARTICIPATION AND THE ROW PARTICIPATION REQUEST FOR YOU REVIEW. COST SUMMARY: ITEM I BRIDLE GATE DRIVE OVERSIZE PARTICIPATION $47,712 ITEM 2 LONGMIRE DRIVE OVERSIZE PARTICIPATION $91,999 ITEM 3 RIGHT-OF-WAY ACQUISITION (LAND COST ESTIMATE) $17,920 TOTAL REQUEST = $157,631 THE DEVELOPER MR. OFCZARZAK IS A QUALITY BUILDER OF CUSTOM HOMES IN THE LOCAL AREA AND THIS DEVELOPMENT WILL BE A GREAT ADDITION TO A FINE CITY, PLEASE CONSIDER THIS REQUEST. SINCERELY, G. HESTER, P.E. b•z. ATTACHMENTS: GRAPHIC OF BRIDLE GATE ESTATES COST ESTIMATES FOR LONGMIRE DRIVE AND BRIDLE GATE DRIVE ITE TRIP GENERATION CHART AND TABLE XC: ALTON OFCZARZAK, OAKWOOD CUSTOM HOMES, INC. FX: 694.8606 .c F OF T,.\,. BRIDLE GATE ESTATES LONGMIRE DRIVE - 49' BACK TO BACK PAVEMENT SECTION AUGUST 2, 1999 ENGINEERS QUANTITY AND COST ESTIMATE OF CONSTRUCTION COST ITEM DESCRIPTION UNITS QTY. UNIT PRICE EXTENSION I CLEARING ROW (1107"70') AC. 1.78 $2,000.00 $3,560 2 ROADWAY EXCAVATION (1107@5C.Y./STA.) C. Y. 5535 $3.00 $16,605 3 6" STABILIZED SUBGRADE (4%) S. Y. 6273 $3.00 $18,819 4 EXTRA LIME (TYPE A) UP TO 6% TONS 25.5 $90.00 $2,295 5 8" GRAVEL BASE BETWEEN C&G S. Y. 5535 $8.00 $44,280 6 1.5" H.M.A.C S. Y. 5535 $7.50 $41,513 7 STD. CURB AND GUTTER L. F. 2126 $7.50 $15,945 9 4' WIDE SIDEWALK (2147 L. F.) S. F. 8588 $2.50 $21,470 10 RE-VEGETATION - HYDROMULCH S. Y. 1600 $0.50 $800 II 12" PVC WATERLINE L. F. 1107 $25.00 $27,675 12 12" VALVES EA. 2 $1,000.00 $2,000 13 12"x8"TEE EA. 1 $600.00 $600 14 BLOW OFF ASSEMBLY EA. 2 $500.00 $1,000 15 WET CONNECTION L. S. 1 $500.00 $500 16 PERFORMANCE BOND @1% L. S. 1 $2,296.00 $2,296 17 PAYMENT BOND @1% L. S. 1 $2,296.00 $2,296 18 STRIPING & ROAD BARRICADES L. S. 1 $5,000.00 $5,000 19 EROSION & SEDIM. CONTROL LS. 1 $2,000.00 $2,000 20 TRENCH SAFETY LS. 1 $1,100.00 $1,100 21 REPLACE WIRE FENCE L. F. 1170 $5.00 $5,850 22 REPLACE GTE SERVICE LINE L. F. 670 $1.00 $670 23 ON-SITE ROW ACQUISTION AC. 1.368 $10,062.00 $13,765 24 OFF-SITE ROW ACQUISTION AC. 0.413 $10,062.00 $4,156 TOTAL PAVEMENT = $165,287 TOTAL WATER LINE = $31,775 MISCELLANEOUS = $19,212 ROW ACQUISITION = $17,920 TOTAL ESTIMATE D CONSTRUCTION COST = $234,194 COST DIFFERENCE BETWEEN 49' B-B PAVEMENT SECTION AND A 28' B-B PAVEMENT SECTION LONGMIRE DRIVE OVERSIZE PARTICIPATION ITEM DESCRIPTION UNIT QUANTITY UNIT EXTENSION COST I CLEARING ROW (20' WIDER) AC. 0.51 $2,000.00 $1,020 2 ROADWAY EXCAVATION (21'WIDER) C. Y. 1583 $3.00 $4,749 3 6" LIME STABILIZATION S. Y. 2583 $3.00 $7,749 4 6" GRAVEL BASE S. Y. 2583 $6.00 $15,498 5 EXTRA 2" GRAVEL BASE S. Y. 5535 $2.00 $11,070 6 1.5" H. M. A. C. S. Y. 2583 $7.50 $19,373 7 4' SIDEWALK S. F. 8588 $2.50 $21,470 8 12" WATERLINE VS 8" WATERLINE L. F. 1107 $10.00 $11,070 ESTIMATED OVERSIZE PARTICIPATION = $91,999 BRIDLE GATE ESTATES BRIDLE GATE DRIVE - 39' BACK TO BACK PAVEMENT SECTION AUGUST 2, 1999 ENGINEERS QUANTITY AND COST ESTIMATE OF CONSTRUCTION COST ITEM DESCRIPTION UNITS QTY. UNIT PRICE EXTENSION I CLEARING ROW (945"60') AC. 1.30 $2,000.00 $2,600 2 ROADWAY EXCAVATION (975"5) C. Y. 4875 $3.00 $14,625 3 6" STABILIZED SUBGRADE (4%) S. Y. 4442 $3.00 $13,326 4 EXTRA LIME (TYPE A) UP TO 6% TONS 25.0 $90.00 $2,250 5 7" GRAVEL BASE BETWEEN C&G S. Y. 3792 $7.00 $26,544 6 1.5" H.M.A.C S. Y. 3792 $7.50 $28,440 7 CURB AND GUTTER L. F. 1600 $7.50 $12,000 9 4' WIDE SIDEWALK (1708 L.F.) S. F. 6832 $2.50 $17,080 10 RE-VEGETATION - HYDROMULCH S. Y. 2467 $0.50 $1,234 II PERFORMANCE BOND @1% L. S. 1 $1,200.00 $1,200 12 PAYMENT BOND @1% L. S. 1 $1,220.00 $1,220 13 EROSION & SEDIM. CONTROL LS. 1 $2,000.00 $2,000 14 TRENCH SAFETY LS. 1 $2,000.00 $2,000 TOTAL PAVEMENT = $118,099 MISCELLANEOUS = $6,420 TOTAL ESTIMATE D CONS TRUCTION COST = $124,519 COST DIFFERENCE BETWEEN 39' B-B PAVEMENT SECTION AND A 28' B-B PAVEMENT SECTION BRIDLE GATE DRIVE OVERSIZE PARTICIPATION ITEM DESCRIPTION UNIT QUANTITY UNIT EXTENSION COST I ADDITIONAL 10' WIDE ROW REQUIRED RESIDENTIAL @ 10,062$/ACRE L. F. 650 $2.31 $1,502 COMMERCIAL @ 35,714$/ACRE L. F. 265 $8.20 $2,173 2 CLEARING ROW 930 L.F. AC. 0.21 $2,000.00 $420 3 ROADWAY EXCAVATION 975"0.83 C. Y. 809 $3.00 $2,427 4 6" LIME STABILIZATION (II' WIDER) S. Y. 1192 $3.00 $3,576 5 6" GRAVEL BASE (II' WIDER) S. Y. 1192 $6.00 $7,152 6 EXTRA I" GRAVEL BASE (41' WIDE) S. Y. 4442 $1.00 $4,442 7 1.5" H.M.A.C. (11' WIDER) S. Y. 1192 $7.50 $8,940 8 4' SIDEWALK - BOTH SIDES S. F. 6832 $2.50 $17,080 ESTIMATED OVERSIZE PARTICIPATION = $47,712 BRIDLE GATE ESTATES LONGMIRE DRIVE RIGHT-OF-WAY COST ESTIMATE AUGUST 2, 1999 ITEM DESCRIPTION UNIT QUANTITY I RESIDENTIAL C 10,062$/ACRE ACRES 1.781 UNIT COST $10,062.00 EXTENSION $17,920 HESTER ENGINEERING COMPANY 7607 EASTMARK DRIVE, SUITE 253-B COLLEGE STATION, TEXAS 77840 409.693.1100 FX:409.693.1075 EMAIL: HEC@GKG.NET AUGUST 16, 1999 HONORABLE MAYOR AND CITY COUNCIL CITY OF COLLEGE STATION P.O. Box 9960 COLLEGE STATION, TX 77842 RE: BRIDLE GATE ESTATES SUBDIVISION (FORMERLY RIDGEWOOD ESTATES) OVERSIZE PARTICIPATION, RIGHT-OF-WAY AND GREENWAY ACQUISITION REQUEST HONORABLE MAYOR AND CITY COUNCIL, MR. ALTON OFCZARZAK, THE OWNER OF OAKWOOD CUSTOM HOMES, INC., IS PROPOSING TO DEVELOP A 21.1 ACRE TRACT OF LAND APPROXIMATELY 600 FEET SOUTH OF GRAHAM ROAD. MR. OFCZARZAK PLANS TO DEVELOP 19.7 ACRES OF THE LAND INTO 53 SINGLE FAMILY RESIDENTIAL HOMES AND 1.4 ACRES INTO AN OFFICE SITE FOR OAKWOOD CUSTOM HOMES. ITEMS: MR. OFCZARZAK WOULD LIKE TO REQUEST YOUR CONSIDERATION OF PROVIDING CITY PARTICIPATION OF FOUR I.) BRIDLE GATE DRIVE OVERSIZE PARTICIPATION 2.) LONGMIRE DRIVE OVERSIZE PARTICIPATION 3.) LONGMIRE DRIVE RIGHT-OF-WAY ACQUISITION 4.) LINEAR PARK - GREENWAY DEDICATION ITEMS I & 2. THE MASTER DEVELOPMENT PLAN FOR THIS DEVELOPMENT WAS RECENTLY APPROVED AND THE DEVELOPMENT SERVICES DEPARTMENT STAFF REQUIRED THAT BRIDLE GATE DRIVE BE CONSTRUCTED AS A MINOR COLLECTOR AND LONGMIRE DRIVE AS A MAJOR COLLECTOR. THE ESTIMATED NUMBER OF VEHICLES PER DAY GENERATED BY A DEVELOPMENT OF THIS SIZE IS 640 AND A LOCAL STREET SECTION WOULD BE SUFFICIENT FOR THESE ROADWAYS. THIS IS BASED ON THE COLLEGE STATION DEVELOPMENT SERVICES SUBDIVISION REGULATIONS, TABLE I, PAGE 9-18 WHICH STATES THE VOLUME RANGE GUIDELINE IS 200 TO 1000 (VEHICLES/DAY) FOR LOCAL STREET SECTIONS. TRAFFIC VOLUME ANALYSIS USING THE INSTITUTE OF TRANSPORTATION ENGINEERS, "TRIP GENERATION", JANUARY 1991 CHART FOR "SINGLE-FAMILY DETACHED HOUSING, PAGE 257: -THE AVERAGE TRIP GENERATION FOR SINGLE FAMILY RESIDENTIAL DWELLING UNITS IS 9.55 AND 53 UNITS WILL GENERATE 507 VEHICLES PER DAY. AND TABLE 4: "GENERAL OFFICE BUILDING TRIP GENERATION", PAGE 942 -A BUILDING OF 5400 SQUARE FEET WILL GENERATE 133 VEHICLES PER DAY. FOR A TOTAL OF 640 VEHICLES PER DAY. ITEM 3. MR. OFCZARZAK WOULD LIKE TO APPLY FOR THE FUNDS ALLOCATED FOR THE ACQUISITION OF THE RIGHT-OF-WAY OF LONGMIRE DRIVE WHICH WILL BECOME AVAILABLE IN COLLEGE STATIONS FISCAL YEAR 2000. THE AMOUNT SHOWN BELOW WAS BASED UPON A CERTIFIED APPRAISAL OF THE LAND. DUE TO SPATIAL CONSTRAINTS OF THE PROPERTY A SMALL PORTION OF THE RIGHT-OF-WAY FOR THE LONGMIRE DRIVE EXTENSION WILL BE TAKEN FROM ADJACENT PROPERTY OWNERS. MR. OFCZARCAK IS DISCUSSING THE LAND COST AND THE AVAILABILITY OF THIS LAND WITH THE PRESENT OWNERS. ITEM 4. FINALLY MR. OFCZARZAK WOULD LIKE TO REQUEST COMPENSATION FOR THE "LINEAR PARK - GREENWAY" OF APPROXIMATELY 0.6 ACRES ALONG LICK CREEK. THIS AMOUNT IS ALSO BASED UPON A CERTIFIED APPRAISAL OF THE LAND. COST SUMMARY: ITEM I BRIDLE GATE DRIVE OVERSIZE PARTICIPATION $38,035 ITEM 2 LONGMIRE DRIVE OVERSIZE PARTICIPATION $70,194 ITEM 3 LONGMIRE DRIVE RIGHT-OF-WAY ACQUISITION (LAND COST) $21,512 ITEM 4 LINEAR PARK - GREENWAY ACQUISITION (LAND COST) $7,372 TOTAL REQUEST = $137,113 I HAVE PREPARED COST ESTIMATES FOR THE OVERSIZE PARTICIPATION AND THE LAND ACQUISITIONS FOR YOUR REVIEW. SEE ATTACHED SHEETS FOR ITEMIZED BREAKDOWN. THE DEVELOPER MR. OFCZARZAK IS A QUALITY BUILDER OF CUSTOM HOMES IN THE LOCAL AREA AND THIS DEVELOPMENT WILL BE A GREAT ADDITION TO A FINE CITY, PLEASE CONSIDER THIS REQUEST. RESPECTFIjLCY SUBMITTED, oor e e 0 AEL G. HkSTER, P.E. ATTACHMENTS: GRAPHIC OF BRIDLE GATE ESTATES COST ESTIMATES ITE TRIP GENERATION CHART AND TABLE SUMMARY APPRAISAL XC: ALTNN OFCZARZAK, OAKWOOD CUSTOM HOMES, INC. FX: 694.8606 BRIDLE GATE ESTATES LONGMIRE DRIVE OVERSIZE PARTICIPATION COST DIFFERENCE BETWEEN 49' B-B PAVEMENT SECTION AND A 28' B-B PAVEMENT SECTION ITEM DESCRIPTION UNIT QUANTITY UNIT EXTENSION COST I CLEARING ROW (20' WIDER) AC. 0.51 $2,000.00 $1,020 2 ROADWAY EXCAVATION (21'WIDER) C. Y. 1583 $3.00 $4,749 3 6" LIME STABILIZATION (21' WIDER) S. Y. 2583 $3.00 $7,749 4 6" GRAVEL BASE (21' WIDER) S. Y. 2583 $6.00 $15,498 5 EXTRA 2" GRAVEL BASE (45' WIDE) S. Y. 5535 $2.00 $11,070 6 1.5" H.M.A.C. (21' WIDER) S. Y. 2583 $7.50 $19,373 7 4' SIDEWALK (ONE SIDE FOR LOCAL)) S. F. 4294 $2.50 $10,735 ESTIMATED OVERSIZE PARTICIPATION = $70,194 BRIDLE GATE DRIVE OVERSIZE PARTICIPATION COST DIFFERENCE BETWEEN 39' B-B PAVEMENT SECTION AND A 28' B-B PAVEMENT SECTION ITEM DESCRIPTION UNIT QUANTITY UNIT EXTENSION COST / ' I ADDITIONAL 10 ROW AC. 0.21 $12,085.31 $2,538 2 CLEARING ROW 930 L.F. AC. 0.21 $2,000.00 $420 3 ROADWAY EXCAVATION 975*0.83 C. Y. 809 $3.00 $2,427 6" LIME STABILIZATION (11' WIDER) S. Y. 1192 $3.00 $3,576 5 6" GRAVEL BASE (11' WIDER) S. Y. 1192 $6.00 $7,152 /6 EXTRA I" GRAVEL BASE (41' WIDE) S. Y. 4442 $1.00 $4,442 7 1.5" H.M.A.C. (11' WIDER) S. Y. 1192 $7.50 $8,940 8 4' SIDEWALK (ONE SIDE FOR LOCAL) S. F. 3416 $2.50 $8,540 ESTIMATED OVERSIZE PARTICIPATION = $38,035 ~ V , is~s3s~ss~osss~sssaa~s3ssass!!! k k k }}k k'E k A k' !slsssssssssssssssslssslslsr!!! O 1 . Nn ~l1 ri~l~rrls ~ iIr ~ IT 11 Q ' r 1,18 1r, E x 7C~0 N M 1 L n_.J [ ~ 1 0 t I N n s Or O~ . h pp p W 2 W ; W WW p N R ♦ n 9 n = Z = NJ l 5 1 ' N 1 , - t 1 IC-4 ~ I l tl') 1 1 1 N 1 1 I . N C ' I 1 I I INl~ ir., l~ 1 1 _ s 1~ 1 ~ 1f 1` i _ pi . i 1 ti ~o i i o i o 'O yLL W~h~ O~=N d0 x pJp ~1 yl .i Yk x ~1°2fN 10 < F nrt°- oa 01 LuLM4 V4 j" W W a Z Ei 2Nap0 0 ao is ``~^pF L~N,NJ maN wam _j _3 Rio I D O Y i p RZ Q/ V Lx pp~~ 1 in rr ~y W ly ~ h =~v1 n i 0 ! 1 yl 'r I BAING 21V D 310 f7 W t ~~f s ~ o. l W i pl b N BRIDLE GATE ESTATES LONGMIRE DRIVE RIGHT-OF-WAY ACQUISITION AUGUST 16, 1999 ITEM DESCRIPTION UNIT QUANTITY UNIT EXTENSION COST I LAND @ 12,085.31$/ACRE ACRES 1.78 $12,085.31 $21,512 LINEAR PARK - GREENWAY ACQUISITION AUGUST 16, 1999 ITEM DESCRIPTION UNIT QUANTITY UNIT EXTENSION COST I LAND @ 12,085.31$/ACRE ACRES 0.61 $12,085.31 $7,372 NOTE: LAND COST BASED ON CERTIFIED APPRAISAL BY HARTGROVES REAL ESTATE GROUP, INC. THOMAS E. HARTGROVE, MAI, STATE CERTIFIED REAL ESTATE APPRAISOR, 409.776.4400 Aug 16 99 03:26p Thomas Hartgroves 409 691-8155 p.1 A Complete Summary Appraisal of 21.10 Acre Tract, Robert Stevenson Survey, A-54, College Station, Brazos County, Texas for Mr. Sam Nigh First Federal Savings Bank 2900 S. Texas Avenue Bryan, Texas 77802 by Hartgroves Real Estate Group, Inc. Commercial Real Estate Appraisers & Consultants P.O. Box 3233 Bryan, Texas 77805 as of June 11, 1999 99-021 OCT-19-1999 11:11 HESTER ENG I t EERI NG COMPANY CIVIL ENGINEERING SERVICES 7607 EASTMARK DRIVE, SUITE 253-B COLLEGE STATION, TEXAS 77840 PH: 409.693.1100 FX: 409.693.1075 0 C of F; R D HI $1 Sh J*E 8, 1999 ALTON OFCZARZAK ,WOOD CUSTOM HOMES, INC. . Box 9849 LEGE STATION, TX 77842 696.7206 Moe: 777.4500 694.8606 I~ o.ti 4~~ P.01 ~W BRIDLE RIDGE ESTATES FORMERLY RIDGEWOOD ESTATES ENGINEERS ESTIMATE vk ~cA ,R ALTON, THE ESTIMATED CONSTRUCTION COST OF BRIDLE RIDGE DRIVE FROM STATE HWAY NO. 6 TO THE FUTURE PROPOSED LONGMIRE DRIVE IS APPROXIMATELY 6,349, SEE ATTACHED ENGINEERS ESTIMATE DATED 6/8/99. THIS ESTIMATE ULD BE SUBMITTED TO THE CITY FOR THE LETTER OF CREDIT. THE F, TIS_ MATED CONSTRUCTION COST OF PHASE ONE - 300 FEET OF BRIDLE RI GE DRIVE AND PHASE TWO - THE FIRST 24 SINGLE FAMILY LOTS IS APPROXIMATELY 07,316, SEE ATTACHED ENGINEERS ESTIMATE DATED 3/29/99. ApPRoximATELY 2c,% SHOULD BE ADDED TO THE CONSTRUCTION COST FOR MISCELLANEOUS COSTS IN LUDING ENGINEERING, SURVEYING, FILING FEES, FENCING, GAS, ELECTRICAL, P RKLAND DEDICATIONS, ETC. WHICH WILL BRING THE TOTAL TO $384,145. IF I CAN BE OF FURTHER ASSISTANCE PLEASE CONTACT ME. A' i SI CER MICHAEL G. HESTER, P. ACHMENTS: ENGINEERS ESTIMATE DATED 6/8/99 ENGINEERS ESTIMATE DATED 3/29/99 p~~.r OCT-19-1999 11:12 P.02 BRIDE RIDGE ESTATES BRIDEL RIDGE DRIVE 950' - 39' B-B MINOR COLLECTOR STATE HIGHWAY No. 6 TO THE FUTURE PROPOSED LONGMIRE DRIVE ENGIN ERS CONSTRUCTION COST ESTIMATE JUNE , 1999 ITEM 1 2 3 4 5 6 7 8 9 Pot. 6 W-O - ~4?7 DESCRIPTION UNIT QUANTITY UNIT EXTENSION COST CLEARING ROW L. F. 950 $2.75 $2,613 ROADWAY EXCAVATION L. F. 950 $3.00 $2,850 6" LIME STABILIZATION Q3$/S.Y. L.F. 950 $13.67 $12,987 6" GRAVEL BASE (I$/IN/S.Y.) L.F. 950 $23.33 $22,164 1.5" H.M.A.C. (1.5"@7.5) L, F. 950 $29.17 $27,712 CURB & GUTTER C $7.5/L.F. L. F. 950 $15.00 $14,250 4' SIDEWALK (2.75$/S.F.) BOTH SIDES L. F. 950 $22.00 $20,900 STORM SEWER L.F. 475 $65.00 $30,875 EROSION CONTROL L. S. 1 $2,000.00 $2,000 ESTIMATED CONSTRUCTION COST = $136,349 HESTER ENGINEERING COMPANY CIVIL ENGINEERING SERVICES 7607 EASTMARK DRIVE, SUITE 253-B COLLEGE STATION, TEXAS 77840 PH: 409.693.1100 Fx: 409.693.1075 10, 1999 Jill CALLAWAY, ADMINISTRATIVE DIRECTOR OF DEVELOPMENT SERVICES CI Y OF COLLEGE STATION DEVELOPMENT SERVICES DEPARTMENT P. . Box 9960 C LLEGE STATION, TEXAS 77842 Fx 409.764.3496 BRIDLE RIDGE ESTATES FORMERLY RIDGEWOOD ESTATES. BRIDLE RIDGE DRIVE 60 FOOT WIDE RIGHT OF WAY LAND COST ESTIMATE AR JIM, OCT-19-1999 11 12 S HERE IS THE ESTIMATE YOU REQUESTED: COMMERCIAL LAND: 0.37 ACRES C 35,714$/ACRE = $13,214 RESIDENTIAL LAND: 0.94 ACRES 0 10,062$/ACRE = $9,458 TOTAL ESTIMATED COST FOR ROW ACQUISITION = $22,672 IF I CAN BE OF FURTHER ASSISTANCE PLEASE CONTACT ME. SINCERELY IAEL GVHS~F-R, P.E. MR. ALTON OFCZARZAK, OAKWOOD CUSTOM HOMES, INC., FX: 694,8606 P.03 TOTAL P.03