Item Summary: This preliminary plat divides the property into 3 lots and 3 reserve areas.
Phase I consists of approximately 24.7 acres zoned C-B Business Commercial. Phase 2 consists
of 14.9 acres zoned C-B. Phase 3 contains 5.2 acres zoned C-B, and the 2 reserve tracts contain
26.2 acres zoned R-5 Medium Density Apartments. The entire property is bound by University
Drive on the south, the SH 6 East-Bypass on the east, Bryan/C.S. city limits line on the north and
duplexes in University Park on the west. The Land Use Plan shows the area as mixed use and
the Thoroughfare Plan show the northward extension of Glenhaven Drive through this tract.
There is a 1.15 acre tract at the very corner of University and the SH 6 East Bypass which
should be included with the preliminary plat as it was subdivided out since adoption of the
City's Subdivision Regulations. This is particularly important as the University Drive Study
adopted in 1991, and the City's Driveway Access Ordinance would not allow access to this
corner piece. This corner will have to have shared access or cross access with the adjacent
Lot 1, Block Two and Lot 2, Block Two and this should be reflected on a preliminary plat
Item Background: The extension of Glenhaven north into Bryan is included on the
Thoroughfare Plan in order to provide additional north-south movement between the two cities
and also to provide an alternative flow to the one-way frontage road. Although this is a good
idea from a traffic mobility standpoint, it does not appear to be critical to either College Station
or Bryan. At the P&Z meeting on November 5, 1998, the developer did not ask to vary from the
Thoroughfare Plan and presented a preliminary plat which included the Glenhaven extension in
order to comply with the plan. At the P&Z meeting on November 19, the developer indicated
that they did not need the extension for their development. Staff agreed that the extension was
Item: Consideration of a Preliminary Plat of The Gateway, approximately 75 acres, divided into
6 C-B and R-5 zoned lots located on the NW corner of University Dr. and SH 6. (98-327). The
applicant is Municipal Development Group, Engineers for owner Delmar Baronhead I, Ltd.
not needed for the development and indicated to P&Z that they did not have a great concern
about removing the extension from the Thoroughfare Plan.
As for the traffic that will be generated from the development itself, the Council realizes that
these issues are dealt with at the time of zoning requests. This property was rezoned in the early
90's to commercial and multi-family residential. This is very appropriate for large tracts at the
intersection of two major arterial roadways. With the zoning in place, the property owner has
rights to the uses that are permitted in these districts and to reasonable ingress and egress. These
cannot be denied. That does not mean that the City cannot affect the design through the platting
process and how the ingress and egress occurs.
Staff Recommendations: Staff recommends approval with the conditions as underlined in the
coversheet and attached Engineering Information as well as with the following conditions:
That a commercial (private) drive be provided in lieu of extending Glenhaven through the
tract. Approval of this condition would amend the Thoroughfare Plan to not extend
Glenhaven Drive north of University Drive;
2. That the Final Plat for Phase I include two access points on University Drive and one on the
SH 6 Frontage Road in order to distribute traffic so that one access point does not bear the
burden of all traffic from the site. The two access points on University Drive would be
located at median openings in accordance with TXDOT plans for the widening of University
Drive; and,
That internal circulation for the site be addressed at the time of site plan review to ensure
adequate distribution of traffic to all access points.
Related Advisory Board Recommendations: The Planning and Zoning Commission tabled the
plat on November 5, 1998 pending additional information regarding traffic generation and due to
resident concerns for the possible increase in traffic on Glenhaven. P&Z approved the
preliminary plat without the Glenhaven extension on November 19, 1998.
Council Options:
1. Approve the preliminary plat.
2. Approve with conditions.
3. Deny.
Supporting Materials:
1. Location Map.
2. Application.
3. Engineering Information and Notification Information.
4. Copy of Preliminary Plat.
5. P&Z Minutes (11/5 and 11/19/98).
6. Memo From Parks Dept.
ENGINEERING
Water: Will be extended from University Drive from two locations. Design
calculations iustifying the proposed 8" lines should be submitted at the time of final
plat. A water line will also need to be extended across Lot-1 Btock:T-wa- nierre-the
-corner--piece. Staff would support a variance to require the deve}opiii t on-the corner
piece to construct this waterline rather than the developer of Lot ` , The
easement is provided on this preliminary plat. .An--easement will *I"- be needed
extending across Phase III to the Lamar Property__
Sewer: Will be provided through existing lines and a proposed 8" line. There is an
existing line that has no recorded easement. This should be shown as a 20' PUE on
the preliminary plat.
Streets: Property is bound by University Drive and the SH6 East Bypass west frontage
road. _ The preliminary plat should show the location of the off-ramp -where troi€fic
4exits-the, -bypass..to access University Drive. CAenhaven-is-shown-on--the-tharnughfare
plan as-,a extended"dnmgh-tM - mperty. There is a proposed
access easement shown on Reserve Tract B which should be shown as proposed
rather than existing.
Off-site Easements: N/A
Sidewalks: At this time, because of the impending widening of University Drive by
TXDOT, the developer will not be required to install sidewalks on University Drive. The
TXDOT project will include sidewalks along both sides of University Drive.
Drainage: Detention will be determined at the time of site plan review. There should
be a note on the plat stating that easements will be located at the time of site design
for the off-site drainage coming from Scott and White and that running through the
reserve tract iust west of Lot 1, Block L.
Flood Plain: Some 42.5 acres is in the floodplain, although none of the site has
floodway on it according the applicant's engineer. The floodplain line should be
designated as such on the preliminary plat.
Oversize request: None requested
Parkland Dedication:. None required for C-B. See memo from Park's Department
NOTIFICATION: NONE REQUIRED
oAgroup\deve_ser\cvsht\dec.109\98-327.doc
DEVELOPMENT SERVICES
TRANSMITTAL LETTER
Y.,
Name/Firm:
( K-r /v-o
Date: ~g J Gf A) 9 9
Address: ~i.Srf
Xist/~ ,
Phone:
C S
7 7 c
!
Fax: Cv ~l3 2 ~3
We are transmitting the following for Development Services to review and comment: (Check all that apply.):
Master Development Plan
Preliminary Plat
Final Plat
❑ FENLA. CLOMA/CL0MR/L0NfA/L0MR
❑ Site Plan
❑ Grading Plan
❑ Landscape Plan
❑ Irrigation Plan
❑ Building Construction Documents
w/ ❑
Redlines
❑ Development Permit App.
w/ ❑
Redlines
❑ Conditional Use Permit
w/ ❑
Redlines
❑ Rezoning Application
w/ ❑
Redlines
❑ Variance Request
w/ ❑
Redlines
❑ Other - Please specify
w/ ❑ Redlines
w/ ❑ Redlines
w/ ❑ Redlines
w/ ❑ Redlines
INFRASTRUCTURE AND ENGINEERING DOCUMENTS
All infrastructure documents must be submitted as a complete set.
The following are included in the complete set:
❑
Waterline Construction Documents
w/ ❑
Redlines
❑
Sewerline Construction Documents
w/❑
Redlines
❑
Drainage Construction Documents
w/ ❑
Redlines
❑
Street Construction Documents
w/ ❑
Redlines
❑
Easement application with metes & bo
unds decsription
❑
Drainage Letter or Report
w/ ❑
Redlines
❑
Fire Flow Analysis
w/ ❑
Redlines
❑ TxDOT Driveway Permit
❑ TxDOT Utility Permit
❑ Other -Please specify
Special Instructions: L /
1Q I./ I'S I"WI o F "-!tee ~q7 2~J ~rc ~imrna~ Pla~ vVr
_4- o _IAA4 '41 _CG ZP /1 'P,4n J llI r~' f r ✓ n e e 7 iI4 m ) / vc74~ ?"-T- (-W
loo ~WVI-Q- t q 79
I<
TRA.tiS~;.: AL LITTER
TRAtiS`.:°'.DOC 03/23/99
I of l
MUNICIPAL DE VEL OPMENT GR O UP
2551 Texas Ave. South, Ste. A • College Station, Texas 77840 •409 693-5359 • FAX.- 409 693-4243 • E-mail: mdgcs@gte.com
Consulting Engineers, Surveyors, Planners and Environmental Consultants
n~-
June 18, 1999
Sabine McCully
City of College Station
P.O. Box 9960
College Station, TX 77840
Re: Staff Comments No. 1 and discussion comments from 16 June Meeting
Gateway Preliminary Plat
MDG Drawing 3127-000300, Revision D dated 5/20/99
Dear Sabine:
We are in receipt of the above staff comments addressing revision D of this preliminary plat, have already
discussed them, and prepared a revised document to reflect the changes. This is the revision we discussed
on Wednesday 16 June. Addressing the staff review comments using the same numbering as the letter, we
have made the following changes reflected in the new revision, revision E.
We have provided the VOLUME and PAGE number citations for Reserve A and Reserve B.
2. Our client has agreed to dedicate 17.5 feet of Lot 4 at the common line with Lot 3, as an access
easement. The current revision depicts this.
The driveways were depicted for informational purposes only. The original preliminary plat has
been superceded by this submission, and the proposed driveways on that document do not meet the
new development scheme. We have depicted the driveways based on the median strip which is to
be constructed.
4. We have removed the setback lines.
The water lines are depicted for schematic purposes only. The actual design drawings show the
bends as appropriate.
6. We have added an easement segment across Lot 1 to tie to Reserve B.
The northeast property is part of Lot 1.
8. As we discussed on Wednesday, we have extended the 64' access easement across Reserve B.
Reserve B does not belong to Delmar, so this depiction is merely of a "future" easement.
000300-c.05-53 (3127)
9. We now show the 8" waterline crossing University Drive to serve Lot 3.
10. The waterline we depict along University Drive will tie to the waterline which crosses University
Drive to serve Lot 3, and which was recently approved for construction. That will accomplish a
service loop along the front.
The drawing which has been submitted shows a waterline running back from University Drive
across Lot 4 through the eastern part of Lot 1 adjacent to Lot 2, crossing Reserve B.
IL . We have revised the title block .
12. Phase I is comprised of Lots 1 - 8. Phase II is made up of land not owned by Delmar, namely
Reserves A & B, which will be developed at some later time. We have added notes on Reserve A
and Reserve B to explain this.
We have made additional revisions based on staff comments at our meeting of the 16 th.
1. We show a water line and public utility easements for service to the Lamar tract.
2. We show a complete water line loop around Reserve A.
3. We have added a note that lots must provide cross-access, with locations to be determined at site plan approval.
4. We have depicted a 40' wide joint access easement across Lot 2 and Reserve B from the frontage road to Lot
1.
We have added a note clarifying the responsibility of Lots 2-8 to detain water on an individual basis, as they develop.
I believe Revision E addresses every comment that we have received to date. Please feel free to call if there
are other questions.
Sincerely,
K- /
Grego K. T gar
Vice President/Project Manager
000300-c.05-53 (3127)
I
COLLEGE STATION
P. O. Box 9960 1101 Texas Avenue College Station, TX 77842
Tel: 409 764 3500
MEMORANDUM
June 10, 1999
TO: Gregory K Taggart, MDG, Via Fax 693-4243
FROM: Bridgette George, Assistant Development Coordinator
SUBJECT: Gateway - Preliminary Plat
Staff reviewed the above-mentioned preliminary plat as requested. The
following page is a list of staff review comments that need to be addressed.
Please address the comments and submit the following information by Monday,
June 14, 10:00 a.m. to be placed on the next available Planning & Zoning
Commission meeting scheduled for July 1, at 7:30 p.m., in the City Hall Council
Chambers, 1101 Texas Avenue.
Ten (10) copies of the revised preliminary plat.
The Mylar original of the revised preliminary plat.
If you have any questions or need additional information, please call me at 764-3570.
Attachments: Staff Review Comments No. 1
cc: Delmar Baronhead I, via fax (972) 233-1501
Case file no. 99-309
Home of Texas A&M University
STAFF REVIEW COMMENTS
No. 1
Project: PRILIMINARY PLAT OF GATEWAY 99-309
1. Fill in the volume and page for Reserve Tracts A and B.
2. Show dedication of 17.5 feet on Lot 4 for access easement.
3. No driveway to University Drive will be allowed by plat for Lots 5, 6, 7, or 8.
Refer to the original preliminary plat for approved driveway locations for each
individual lot based on internal circulation layout. Access to University Drive
for Lots 5, 6, 7, and 8 would not be able to meet the driveway ordinance as
platted. (Once a median is installed on University Drive, proposed access
locations would meet the driveway ordinance.)
4. Remove setback lines.
5. Use 45 degree bends not 90 degree on the water lines.
6. Show how the Lamar tract gets water.
7. What is the northeast property? Is it a reserve tract? Why is it separated out
from Reserve A and B? Is it part of Lot 1?
8. Continue the 64' Public Access Easement to rear lots/reserves, excluding
Reserve A.
9. Show waterline crossing under University Drive.
10. Loop the waterline and show how Reserve B and Lot 2 will get water.
11. Individual acreage amounts do not add up to this number.
12. Clarify what is Phase 1. Is there a Phase 2?
Reviewed by: Edwin Hard
.06/11/99 09:53 $409 764 3496 DEVELOPMENT SVCS
I& 001
*~a ACTIVITY REPORT
TRANSMISSION OK
TX/RX NO.
7907
CONNECTION TEL
919722331501PP161
CONNECTION ID
START TIME
06/11 09:52
USAGE TIME
00'57
PAGES
2
RESULT
OK
y- MUNICIPAL DEVELOPMENT GR
2SS1 Teras Ave. South Ste. A • College Station, Terar 77840.409 693-53S9 • FAX.- 409 693-4243 • E
UP
mdgcs@gte.com
Consulting Engineers, Surveyors, Planner and Environmental Consulmnts
June 11, 1999
Sabine McCully
City of College Station
P.O. Box 9960
College Station, TX 77840
Re: S omments No. 1
teway Preliminary Plat and scheduling questions
MDG Drawing 3127-000300, Revision D dated 5/20/99
Dear Sabine:
We are in receipt of the above staff comments and accompanying memorandu
memorandum, we understand this Preliminary Plat is not scheduled for the June 17,
Zoning Commission meeting, but for July 1. Delmar is currently selling a portion of this
restaurant chain, and in order to close, they must have a platted lot within a particular i
n. Based on the
1999 Planning and
property to a major
ime period.
If we cannot be at the June 17 P&Z meeting, is there anyway we can process thelFinal Plat and the
Preliminary Plat simultaneously?
This is a matter of great importance to us, and we ask your assistance in anyway possible either be allowed
to proceed to P&Z at the time for which we submitted, or alternatively, run both plats t the same time.
Addressing the staff review comments using the same numbering as the letter, we ave the fallowing
response.
1. We will provide the VOLUME and PAGE number citations for Reserve A and Reserve B.
2. Our client has indicated that they do not want to dedicate 17.5 feet of Lot 4 asan access easement
which is not needed for their site circulation, and only benefits the owner of Lot I _ We are willing
to discuss alternatives. This is something which we wish to discuss with the commission.
The driveways were depicted for informational purposes only. The original reliminary plat has
been superceded by this submission, and the proposed driveways on that doe ent do not meet the
new development scheme. We have depicted the driveways based on the medjan strip which is to
be constructed-
This is an item we want to discuss at length at our meeting of Tuesday June 1 _
0003000-c.04-53 (3127)
Z00 E 9 Q lii Mt C69 60t XvA CZ : ST 66, 90/TT
L 4. We will remove the setback lines. They were depicted because special restri
University Drive frontage and we wanted to assure that all parties were info.
5. The water lines depicted are for schematic purposes only. When the actual de
use of 90° or 45° bends will be determined on a case by case basis, depending
of good practice.
6. We will add an easement segment across Lot 1.
7. The northeast property is part of Lot 1.
8. We can easily extend the 64' access to the common boundary between Lot 1 an(
B does not belong to Delmar and we do not have any authorization to burden
B with an easement, particularly one of approximately 0.96 acres. If you db
easement there.
9. We will show the waterline crossing University Drive.
apply along the
ign is executed, the
)n the requirements
Reserve B. Reserve
r encumber Reserve
;ct we will show an
10. The waterline we depict along University Drive will tie to the waterline which ill cross University
Drive to serve Lot 3, and which was recently approved for construction. Th will accomplish a
service loop.
The drawing which has been submitted shows a waterline running back froi University Drive
across Lot 4 through the eastern part of Lot 1 adjacent to Lot 2, terminating ai Reserve B.
11. We used the term "called" in the title block because of discrepancies in
recorded instruments- We will revise so there is no discrepancy.
12. Phase I is comprised of Lots 1 - 8. Phase 11 is made up of land not owned
Reserves A & B, which will be developed at some later time. We will add a
circumstance.
I trust this answers any questions you may have. Please feel free to call.
Sincerely,
1 90 6 ~
f87K7ag7
Vice President/Project Manager
cc: Frank Mihalopoious
Chuck Ellison
0003000c.04-53 (3127)
summation of the
Delmar, namely
:e to explain this
C00O 9 a K Mt C69 60t XVJ CZ=ST 66, 90/TT
r
~W CITY OF COLLEGE STATION
PARKS & RECREATION
\ P
OST OFFICE BOX 9960
COLLEGE STATION, TEXAS 77842-9960
(409) 764-3773
MEMORANDUM
December 1, 1998
TO: Edwin Hard, Transportation Planner
FROM: *,Steve Beachy, Director of Parks & Recreation
SUBJECT: Gateway Preliminary Master Plan
The preliminary master plan for the Gateway subdivision includes one tract identified as
R5 (reserve "B"). The plan does not indicate any site for potential park land dedication.
The R5 tract encompasses a total of 20.59 acres. This would provide up to 494 dwelling
units at the maximum density allowed by the zoning regulations. Under the current park
land dedication requirements, this would equate to approximately 3.7 acres of park land or
$111, 150 cash dedication.
Should the developer propose the land dedication, this will require review and approval of
the parks and recreation board. The closest existing park site to this development is
located in the adjacent University Park subdivision and includes approximately 10.2 acres.
There appears to be no pedestrian linkage available between the two subdivisions without
traveling along University Drive. However, I believe that the future residents will most
likely be college students and they will have different needs than those of a typical single
family residential development.
I recommend that the parkland dedication be met with cash rather than additional land in
this area. The location and small amount of land required will not lend itself to a quality
park development.
copies: Parks & Recreation Board
We provide good things in life!
SUBMIT APPLICATION AND THIS
LIST CHECKED OFF WITH 13
FOLDED COPIES OF PLAT FOR REVIEW
PRELIMINARY PLAT MINIMUM REQUIREMENTS
(ALL CITY ORDINANCES MUST BE MET)
INCLUDING BUT NOT LM11TED TO THE FOLLOWING:
1. Drawn on 24" x 36" sheet to scale of 100' per inch or larger. Include the words "PRELMNARY PLAT -
NOT FOR RECORD" in letters 1/2" high. If more than 1 sheet, an index sheet showing entire subdivision at
a scale of 500 feet per inch or larger.
2. Vicinity map which includes enough of surrounding area to show general location of subject property in
relationship to College Station and its City Limits. No scale required but include north arrow.
3. Title Block with the following information:
Name and address of subdivider, recorded owner, planner, engineer and surveyor.
Proposed name of subdivision. (Subdivision name & street names will be approved through
Brazos County 911.) (Replats need to retain original subdivision name.)
® Date of preparation. (INCLUDE DATE THE PLAT WAS SUBMITTED AND THE DATES OF
ANY REVISIONS ON THE PLAT)
Engineer's scale in feet.
Total area intended to be developed.
4. North Arrow.
!1~ 5. Location of current city limit lines and current zoning district boundary.
M` 6. Subdivision boundary indicated by heavy lines. Boundary must include all of parent tract.
7. Descriptions by metes and bounds of the subdivision which shall close within accepted land survey standards.
(Labeled on boundary lines, not separate metes and bounds description.)
8
Primary control points or descriptions and ties to such control point, to which, later, all dimensions, angles,
bearings, block numbers, and similar data shall be referred. The plat shall ml
of the survey or tract, or an original comer of the
9. Name of contiguous subdivisions and names of
indication whether or not contiguous properties
10. Location of the 100 Year Floodplain and Flood`
m✓ 11. Topographic information, including contours at
of streams.
/ Oa""'
12. Proposed land uses (In compliance with Land U
•,4r 13. Proposed zoning changes, if any, submit formal
PRELI.%fI]1;ARY PLAT CHECKLIST 1 of 2
PPCK.Dr-)C 03/25/99
❑ x/14. The location and description with accurate dimensions, bearings or deflection angles and radii, area, center
angle, degree of curvature, tangent distance and length of all curves for all of the following: (Show existing
items that are intersecting or contiguous with the boundary of or forming a boundary with the subdivision, as
well as, those within the subdivision).
N41r, ng Proposed 13
C,
❑
Nlh
ollq
❑
lg'
❑
❑
❑
❑
L~
❑
AlIA- ❑ ❑
•
Streets. Continuous or end in a cul-de-sac, stubbed out streets must end into a temp. turn around
unless they are shorter than 100 feet.
Public and private R.O.W. locations and widths. (All existing and proposed RO.W.'s sufficient to
meet Thoroughfare Plan.)
Street offsets and/or intersection angles meet ordinance.
Alleys.
Reserve tracts.
Well site locations.
Pipelines. If carrying flammable gas or fuel, also show size of line, design pressure and product
transported through the line.
Utility Services. (Water & Sanitary Sewer) All existing and proposed utilities of sufficient
size/depth to meet the utility master plan and any future growth areas.
Easements.
Drainage Structures and improvements including underground storm sewer and all overland
systems (flow line of existing watercourses) and showing )Ehere these will discharge. Proposed
channel cross sections, if any. If-f e% v-- /op
A number or letter to identify each lot or site and each block
Greenbelt area/park linkages/parkland dedication ( All proposed dedications must be reviewed by
the Parks and Recreation Board prior to P & Z Commission consideration.)
Public areas
Other public improvements, including but not limited to parks, schools and other public facilities
15. Proposed phasing. Each phase must be able to stand alone to meet ordinance requirements and infi-astructure
costs should be distributed evenly throughout the subdivision..
16. Are there impact fees associated with this development? 0 Yes N No
17. If requesting oversize participation items, are the necessary impact studies included? 0 Yes 0 No.,XN/A
PRELP D,;,kRY PLAT CHECKLIST
PPCK.DOC 03 25/99
2 of 2
R
CITY OF COLLEGE STATION
CUSTOMERR RECEIPT*
OPER: MRODGERS CT DRAWER: 1
DATE: 5/24/99 00 RECEIPT: 8851596
DESCRIPTION QTY AMOUNT TP TM
FILING FEE/DS/BI 1 $288.00 *87 CK
PRELIM PLAT
MDG-CK190
PRELIM PLAT
GATEWAY
MR
TENDER DETAIL
CK 198 $208.00
DATE: 5/24/99 TIME: 11:23:82
TOTAL PERSONAL CHECK $288.80
AMOUNT TENDERED $280.00
THANK YOU