HomeMy WebLinkAboutStaff ReportMINUTES
Planning and Zoning Commission
CITY OF COLLEGE STATION, TEXAS
September 16, 1999
7:00 P.M.
COMMISSIONERS PRESENT: Chairman Rife, Commissioners Warren, Parker, Floyd, Horlen
and Mooney.
COMMISSIONERS ABSENT: Commissioner Kaiser
COUNCIL MEMBERS PRESENT: Council Member Maloney.
STAFF PRESENT: Senior Planner McCully, Staff Assistant Charanza, Staff Planner
Jimmerson, Staff Planner Anderson, Assistant Development Coordinator
George, Acting Assistant City Engineer Tondre, Transportation Analyst
Hester, and Assistant City Attorneys Nemcik and Ladd.
AGENDA ITEM NO. 1: Hear visitors
There was no one present wishing to address the Commission.
The following items were approved by common consent.
AGENDA ITEM NO. 2: Consent Agenda.
Agenda Item No. 2.1: Approved the minutes from the Regular Meeting held on September 2, 1999.
Agenda Item No. 2.2: Approved the Final Plat of 0.955 acres for Edelweiss Business Center, Lot 2,
Block 2 located on Rock Prairie Road east of Wellborn Road. (99-240)
Agenda Item No. 2.3: Approved the Replat of Lot 10A, Lake View Acres, a 4.67 acre lot located on
the northeast corner of Texas Avenue and Morgans Lane. (99-243)
REGULAR AGENDA
AGENDA ITEM NO. 3: Consideration of a Preliminary Plat for Super B Subdivision located at
2000 F.M. 158 the northwest corner of F.M. 158 and Highway 30. (99-312)
Senior Planner McCully presented the staff report and stated that the subject property was rezoned
from A-O (Agricultural Open) to C-B (Business Commercial). The rezoning was approved with two
conditions:
P&Z Minutes September 16, 1999 Page 1 of 9
STAFF REPORT
Item: Consideration of a Final Plat of.955 acres for Edelweiss Business Center, Lot 2,
Block 2 located on Rock Prairie Road east of Wellborn Road. (99-107, 99-240)
Applicant: Garrett Engineering for Robbie Sells
Item Summary: This lot is being final platted for development. Access is being shared
with the adjacent property. A detention pond will be placed at the front of the property in
a private drainage easement which will be maintained by the property owner. The lot is
zoned for commercial development and is shown for retail land use on the land use plan.
Sidewalks exist along Rock Prairie.
Item Background: The master plan for Edelweiss was approved in the early nineties and
this plat complies with that plan.
Staff Recommendations: Staff recommends approval as submitted.
Commission Action Options:
The Commission has final authority over this final plat. The options regarding the final
plat are approval as submitted, approval with conditions, or denial. Defer action or table
only at applicant's request.
Supporting Materials:
1. Location Map
2. Application
4. Copy of Final Plat
Infrastructure and Facilities:
Water: Is available and adequate.
Sewer: This property will tie into a sewer impact fee line.
Streets: Lot will take access from Rock Prairie via a shared access
easement.
Drainage:
Site plan shows detention on site placed at the front of the
property.
Flood Plain:
None
Oversize request:
None
Impact Fees:
Will be paid at the time of building permit when the sewer
tap is sized.
STAFF REVIEW COMMENTS
No. 1
Project: 99-240 Edelweis Business Center - Lot 2, Block 2
1. Supply the property owner phone and fax numbers on the application.
2. Spell out what the PAE's, PUE's, and PDE's are. The PAE needs to be
private and the PDE and PUE's need to be public.
3. Remove the zoning information.
4. Remove the City Planner certification.
5. We need the signature of the owner before the PNZ meeting.
6. NOTE: There will be impact fees for the sewer impact line that will be due at
the time of site plan review.
Reviewed by: Sabine McCully Date: 8-9-99
Staff Review Comments Page 1 of 1