Loading...
HomeMy WebLinkAboutMiscellaneous1~PE o ~ A~ ~~ yea v ,n ~ n ~ ~ ~ ~ ~~ ~ ~rF of s~~ PETER CORBIN PARCIANY•ARCHITECT•A PROFESSIONAL CORPORATION•MEMBER AIA •713.660.8200 6906 ATWELL, SUITE 121, HOUSTON, TEXAS 77081 APRIL 4, 1983 MR. ALBERT 0. MAYO DIRECTOR OF PLANNING CITY OF COLLEGE STATION P.O. BOX 9960 1101 TEXAS.. AVE. COLLEGE STATION, TEXAS 77840 RE: COLLEGE STATION BUSINESS CENTER COLLEGE STATION. TEXAS DEAR MR. MAYO. ATTACHED PLEASE FIND FOUR COPIES OF OUR REVISED SITE PLAN AND LANDSCAPING PLAN WHICH I BELIEVE REPRESENTS THE RESULTS OF OUR MEETING OF APRIL 3, 1983. I AM ALSO ENCLOSING FOUR COPIES EACH OF THE PAVING PLAN. GRADING AND DRAINAGE PLAN, AND UTILITIES PLAN AS YOU SUGGESTED. THESE DRAWINGS WERE NOT REVISED TO CON FORM WITH THE REVISED SITE LAYOUT BUT WOULD BE SUFFICIENT FOR THE PROJECT REVIEW MEETING SINCE THE INFORMATION CONTAINED ON THESE DRAWINGS WOULD BE ESSENTIALLY THE SAME FOR THE NEW LAYOUT. PLEASE ADVISE AS TO THE TIME AND DATE OF THE PROJECT REVIEW MEETING AS I WISH TO ATTEND. SHOULD YOU HAVE ANY QUESTIONS CONCERNING THIS SUBMITTAL, PLEASE CONTACT ME AT YOUR EARLIEST CONVENIENCE FOR CLARIFICATION. YO VERY TRULY. C~L~u/~ '~ PETER CORBIN PARCIANY. ARCHITECT ~/, ~r _ .. ,~Y, .; ~~~ ~ ~~~~~ ;'~)~+"I~ ()1-t~IT,f; r_;«~ ~-,~c:#f~~~~ E l~)I 1 .',~:~1~ ,-1l''f ~'t'~: 5~~. ~~`~.,i t~E S"~: X1'1%)~' `~~~=:~~' ~~ -, May 9, 1983 Mr. Peter Corbin Parciany 6906 Atwell Suite 121 Houston, TX 77081 Dear Mr. Parciany: The Planning Department received your revised site plans for the College Station Business Center and they were reviewed by the Planning and Zoning Commission on May 5, 1983 at the regular meeting. Results of the review were that the plans were approved with all P,R.C. recommendations to be met, and in addition, either you, the landscape architect, or some representative of the developer to contact the Planning Staff to discuss a better choice of trees to be included in the planted area. It is the contention of the Commission that Live Oaks would have very little chance of survival in such a small area, which would necessitate replacement by the developer, and therefore be an additional expense. Therefore, please contact my office at your convenience to discuss this change in your landscaping. Yours very truly, j~ . V' Albert 0. Mayo, Jr. Director of Planning AOM/s j v PETER CORBIN PARCIANY ARCHITECT (713) 660.8200 TO i ~" G L~~~ ~ ~~ i r~ T ~ ?^ ~~' l~®~ ~ ~~ ~ ~..,. WE ARE SENDING YOU ,B'~ Attached ^ Under separate cover via ^ Shop drawings ~ Prints ^ Copy of letter ^ Change order ~r~~~~~ o~ ~~ac~~~o~~a~ DATE .. ~ ~ ~~ JOB N0. ATTENTION ~/~~~ ~~ RE: ^ Plans ^ Samples ^ -- the following items: ^ Specifications COPIES DATE NO. DESCRIPTION THESE ARE TRANSMITTED as checked below: ^ For approval ^ Approved as submitted ~or your use ^ Approved as noted As re uested Returned for rr i q ^ co ect ons ^ For review and comment ^ ^ FOR BIDS DUE 19 REMARKS ^ PRINTS RETURNED AFTER LOAN TO US COPY TO SIGNED: PRODUCT 240-2 e s Inc., Groton, Mass. 01450 It enclosures are not as noted, kindly notify us t once. ^ Resubmit copies for approval ^ Submit copies for distribution ^ Return corrected prints BUILDING PERMIT APPLICATION R ,° 1 ! ~ , ~y f +1 ~ ., ~ i` ~~~ ¢ ~._. , , t ~ f "~~ ~'~ July 25, 7983 om e at„ ~. ~~ /~ ~ PROJECT: College Station Business Center APPLICANT: ~ Texas Land and Property Management Co. ~N~TN~'~'RTN~ ('f1MM~'NTC • X68 s"3 1. Drainage Calculations must be submitted for this site in accordance with the Drainage Statement provided with the PRC Memorandum along with a copy of the Drainage Plan - SH. A2. (a) Is it the design intent to use the inlet at elev. 277.31 as the overflow when the pond reaches its capacity elevation? 2. Plans-profiles, specifications and estimates for the water and sewer mains must be submitted to the City Engineer for approval (3 copies). Water and sewer mains must be designed and installed under the direct supervision of a registered professional engineer. 3. Field notes prepared by a registered land surveyor must be submitted for all non-platted easements. Notes shall also indicate the current property owner (grantors and the volume and page description of the latest property transaction on this property. ~~ ~~/ ~ r ~~~ '1 ~/ ~? July 26 , 1983 BUILDING PERMIT APPLICATION ~vrh e~~. PROJECT: College Station Business Center 148 Ix '7G8s3 APPLICANT: Texas Land and Property Management Co. ~. ~, ENGINEERING COMMENTS: 1. Drai Wage Calculations must be submitted for thi s site i n accordance with the Drainage Statement provided with the PRC Memorandum along with a copy of the Drainage P1 an - SH A2 . (a) Is it the design intent to use the inlet at elev. 277.31 as the overflow when the pond reaches its capacity elevation? 2. Plans-profiles, specifications and estimates for the water and sewer mains must be submitted to the City Engineer for approval (3 copies). Water and sewer mains must be designed and installed under the direct supervision of a registered professional engineer. 3. Provide current property owner (grantor) and the volume and page description of the latest property transaction on this property in order that an easement document may be prepared. 4. Correct drawings to show the exact location of the waterline easement. 5. A plat of this subdivision is attached. Please verify "an existing 25-foot utility easement parallel to Longmire Drive" on Block 2 6. Sanitary Sewer mains serving commercial properties must~be 8" diameter minimum. 7. Sanitary Sewer main must be V.C.T., P.V.C. (SR-26 or less) or thickness class 52 ductile iron pipe. 8. Sanitary Sewer main must be below the 8" watermain. 9. A utility easement must be provided for the sewer main - 20 feet required. 10. A photo copy of the sanitary sewer construction drawings is attached. 11. Watermai ns shal 1 be CL 52 ducti 1 e iron or CL 150 AC except 6" mains only shall be CL 200 AC. 12. Separate water and sewer plans and profiles must be submitted to the City Engineer for approval before installation of the same. At least 4 sets required more will be approved if desired. Three (3) sets will be retained. BUILDING PERMIT APPLICATION July 26 , 1983 PROJECT: APPLICANT: ENGINEERING COMMENTS: Texas Land and Property Management Co . i. ~3-~1~ 1. ~ Draina a Calculations must be submitted for this site in accordance with g the Drainage Statement provided with the PRC Memorandum along with a copy of the Drainage P1 an - SH A~ . (a) Is it the design intent to use the inlet at elev. 277.31 as the overflow when the pond reaches its capacity elevation? 2. Plans-profiles, specifications d estimate for the water and sewer mains must be submitted to the City Engineer for approval (3 copies). Water and sewer mains must be designed and installed under the direct supervision of a registered professional engineer. 3. Provide current property owner (grantor) and the volume and page description of the latest property transaction on this property in order that an easement document may be prepared. 4. `Correct drawings to show the exact location of the waterline easement. 5. A plat of this subdivision is attached. Please verify "an existing 25-foot utility easement parallel to Longmire Drive" on Block 2 6. Sanitary Sewer mains serving. commercial properties must be 8" diameter minimum. 7. Sanitary Sewer main must be V.C.T., P.U.C. (SR-26 or less} or thickness class 52 ductile iron pipe. 8. Sanitary Sewer main must be below the 8" watermai n. 9. A utility easement must be provided for the sewer main - 20 feet required. 10. A photo copy of the sanitary sewer construction drawings is attached. 11. Watermains shall be CL 52 ductile iron or CL 150 AC except 6" mains only shall be CL 200 AC. College Station Business Center 12. Separate water and sewer plans and profiles must be submitted to the City Engineer for approval before installation of the same. At least 4 sets required more will be approved if desired. Three (3) sets will be retained. BUILDING PERMIT APPLICATION DATE: September 20,.1983 PROJECT: College Station Business Center APPLICANT: Texas Land Management Company . ~/,,; ENGINEERING COMMENT REU. 2 A. See remarks of July 26, 1983 Item 1 - Submit required material Item 2 - Plans submitted - see comments i.n red on ST-1 and ST-2; ABS is not an exceptable product for sanitary sewer lines in the City of College Station. PCT, PVC ~ DR26 or less, or ductile iron thickness C1 ass 52 are exceptabl e products . Submi t detail s and specifications for approval. Item 3 - A property description must be prepared, sealed and signed by a registered land surveyor or a public land surveyor and presented as an original docuemtn. This will become a part of all easement documents Item 4 - OK Item 5 - There is apparently no 25 foot utility easement along Longmi re Drive . A separate instrument must be prepared for i t also . Item 6 - OK Item 7 - See comments for Item, Item 8 - OK Item 9 - Dedication of the 25 foot utility easement will accomplish this requirement - See Item 5 Item 10 - Details must be added to the construction drawings for clarity. Item 11 - OK Item 12- Must be complied with. 1 -- ~~ ~ OO Oo ~, c~ ~ ~ `~~ 1 '~ ~. `U .' } )~ i~ ,~ ^~ ~ ~~ ~~ ~~ ~ ~, .~ .~ ~j ~~~ "i ' ~,, n~ `1 1 ~ `~ ~v ~ ~~~ { t ~: ~4 ~ ~; ~ r-t • '~~ y~ ~~ ~~. .,, ti ~.. ~. ~, ~~;, J 1~~;` ~ ~. y , `' '~. ~~~ ~ ~ ~` ~,~ ,~ `~, t. .~ ~~ ~ ~``, '~;. ~~ ~1~ \~ ~l ~~ ~ ~~ ~ ~~ ~~ ~ ~ ~ ,;~ ,~ ~y ~~,~ ~~~~ /~ ~ ~ ~ ~~ - ~,~ .~~~ ~~ , ,~ ~ C ~, ~ `~ <~~~~ i off"'. tom(,`-Cc~~~ -2 ~ /9a~ 4` C/ L C'~[ ~-~~~,zf~J may' ~L~ /? ~z d> ~- ~ -t.~z ~.~ ~ac~ c rrtr.~ U 0 ~~~ ~~~ ~ ~, @/ April 14, 1983 MFMORANnl1M City of College station POST OFFICE f30X 9960 1 101 "CE;CAS AVENUE COLLEGE STi~TION, TE}CAS 77840-?499 T0: Planning and Zoning Commission Peter Parciany, 6806 Atwell, Suite 131 Houston, TX 77031 FROM: Project Review Committee: Al Mayo, Director of Planning,_ David Pullen, City Engineer =~ Roy Ke11y, Vice Chairman, P~Z~" Other Staff: Jim Callaway, Asst Director of Planning Joe Porter, Fire Department Jane Kee, Zoning Official Joe Guidry, Electrical Superintendent Dan Dupies, Asst to Zoning Official Jim McCord, Elec. Power Engineers Bill Cupp, GTE Shirley Volk, Planning Technician SUBJECT: 83-418: Parking Lot Plan - College Station Business Center at intersection of FM 2818 & Longmire, along Valley View Drive The P.R.C. met on this date to review the above mentioned project and recommends approval with the following conditions:- (1) Develop raised islands on ends of parking rows; include dimensions on all islands (minimum typical width - g ft.). (2) Separate spaces along building #1 from the building a distance of at least 2 ft., by means of either curbing or wheelstops. (3) Extend the curbing on the buildings with overhead doors to provide stops for the adjacent parking spaces and to divide the loading area from the parking space. (4) Back the curbing away from the ends of the buildings at least 2 ft. to separate the drive from the building (specifically bldgs. #1 ~ #2). (5) Show all dimensions; specifically mentioned were the 8 ft. setback from the property line, the width of the access way into the project and the drive itself in addition to island dimensions requested under #1. (6) Use a minimum 15 ft. radius on the drive (access drives). (7) Complete drainage plans must be prepared by a professional engineer and approved by the City Engineer prior to issuance of any building permits. Please refer to the PRC Drainage Statement attached. (8) Dumpster locations must be approved by the Director of Public Services (Mac Allen). Dumpsters should not be located under a utility line. (g) Furnish an estimate of electrical load requirements to the Electrical Department as soon as possible. (10) GTE requires conduit looped; check with Bill Cupp or David Riley. continued... PRC Memo 83-418 page 2 (11) City Engineer has advised that he must check with the Water ~ Sewer Superintendent (Bennie Luedke) regarding the sewer line; there is a possibility that the line may have to be an 8" public line. Confer with City Engineer concerning results of his investigation. (12) Additional landscaping is required along Valley View Drive. (13) Any sign must conform to Section 8 of the Zoning Ordinance (Ord. 850). Check with Jane Kee, Zoning Official if you have any questions. (14) A11 solid curbing around the perimeter of the project and the ends of islands in the interior of the project must be marked as specified by the Fire Department as Fire Lanes. If the center section of Bldg.#2 is over 15,000 sq. ft. in area, sprinklers will be required. (15) A 10 ft. easement is required on Fire Lines (water), and may be covered by Separate Instrument. Plans and profile to be prepared by a profes- sional engineer. (16) Fire hydrants must be installed and in operation before any combustible construction begins. (17) An additional 10 ft. easement is required along F,M.2818 and may be covered by Separate Instrument. (18) Trees, signs, etc. in easement should not interfer with overhead power lines. (19) Show all easements on site plan. (20) All easements must be filed prior to use of easement and prior to issuance of Certificate of Occupancy. -Any changes to the approved site plan must be cleared through the Office of the Director of Planning. SUBMIT 10 COPIES OF REVISED SITE PLAN TO PLANNIPJG DEPARTMENT BY 5:00 P.M. ON APRtL 29th IN ORDER TO BE ON PAZ AGEPJDA MAY 5. sjv ~~~ G~~~ ~~ ~~ ~~=~ /l L ~~,1.-sv ./~~'~-~~2 ~ yE-~ ~/~z-~ . - D . / /.r~7-'~_~ L, . EGG ~ . , /~ ~ ~~ ~ ~~~ ~ `~ ~ `~~"-' ~~ `~~ ~~~ `~ y ~~~ , ~j' /~-~ Gc~ ~/ lug-~~C ~-e.~~,~ ~~ C:~~~ ~ ~/~/ ~ 7 /' / ~~~~~ ~ `~~..G .c~z~- G~-- _ ~, , ,~ ~c _ ~ ~~~ ~~~ ~ ~,~a _~~~~~~ _.. ~~? ~ ~-- G --: .,~j~~~ , /'~K,LL'~-li~i (~~`L~ti- G~%%'~C~c~Z~f-CGS- ~,~-u-``~-ire ~~~Z.~ ~~i~~-1.~:,•~~., _ ,r_..e 0 7 /J ~~,~~ v/' Q ~c ~ ~'~ ~~,,~ ~ ~~~ j ~ ~a