Loading...
HomeMy WebLinkAboutMiscellaneous~a: ,- ~~ "~~ S~ t ; ~,_~.~_ ~--~ ~ ,~ ~Z-~ ,~ ~` ~'w/~~ AGENDA ITEM COVER SHEET ^ REGULAR ITEM ^ CONSENT ITEM ^ STATUTORY ITEM ITEM SUBMITTED BY: David Pullen, P.E., City Engineer FOR COUNCIL MEETING OF: October 25, 1993 DIRECTOR APPROVAL: EXECUTIVE MEMBER APPROVAL: ITEM: Consideration of a Final Plat of College Station Business Center, Phase One, located on S.H. 6 just south of the intersection of Greens Prairie Road and S.H. 6. (93-229) ITEM SUMMARY: This plat subdivides a 90.475 acre tract into 5 lots for business park usage. This tract is zoned as M-2 Planned Industrial and is in compliance with our land use plan and development policies. Proposed improvements consist of streets, water, sewer, and storm drainage. Sidewalks are proposed on both sides of all streets within the landscape easement. The Subdivision Ordinance requires sidewalks to be placed within the rights-of- way unless an exemption is granted by the City Council. The intent is to provide these sidewalks in areas that will allow greater flexibility for the location of utilities by allowing more space to avoid conflicts and provide greater aesthetic consideration for the area. The Planning and Zoning Commission heard this item at their September 16, 1993 meeting and recommended approval with the requested sidewalk variance. FINANCIAL SUMMARY: As discussed previously with the Business Center presentation. STAFF RECOMMENDATION: Staff recommends approval. CITY ATTORNEY RECOMMENDATION: N/A COUNCIL ACTION DESIRED: Approve or deny plat and direct staff with the requested variance. SUPPORTING MATERIALS: 1. Location map 2. Staff report 3. PRC Report 4. P&Z Minutes 5. Plat PROJECT REVIEW COMMITTEE REPORT September 2, 1993 TO: Elrey Ash, Director of ~:conomic Development Services Larry Stone, Schrickel, Rollins & Assoc., Inc. 1161 Corporate Drive West quite 2U0 Arlington, TX 76U06 FRUM: Project ttevfew Committee ;~"~`~, Jane Kee, Ci t y Planner= 0 David Pullen, City Eng,i eer Larry Marriott, P&L Re esentative Others attending: Don Fazzino, Lone Star Gas Mike Lavender, TCA Cable Mark Smith, Director of Public Services George Spain, 1{'fre Marshal Pete Vanacek, Sr. Parks Planner Dian Cram, Brazos Beautiful Shirley Volk, Development Coordinator SUBJECT: FINAL PLAT - College Station Business Center Phase Une (93-229) A Presubmission Conference was held on September 1, 1893 to review the subject plat. The Pro.iect Review Committee and staff recommend approval of the plat with the following conditions: _____. Change the wording of the "3U' Landscape. Access and Underground Utility easement° to indicate "3U' Landscape, Access and Public Underground Utility Easement". ___.__ Include a detail circle or something to clarify the note "25' _____ Ui ve t he remainder of B1 ock 2 a 1 of designation . Fire Hydrants can be located at 600 foot intervals along the streets, but interior lot coverage will be required at site plan review on a case-by-case basis. ____.___ Make the plat a one-page plat, and include the total acres of the subdivision on the title block. Additional comments: AnV technical requirements to meet City specifications will be addressed on the construction documents Yor this subdivision. SUBMIT THE ORIGINAL MYLAR AND 1U COPIES OF THE REVISED P~INAL PLAT BY NOON ON FRIDAY, SEPTEMBER 1U, 1993, TO BE INCLUDED IN THE PLANNING & 'ZONING COMMISSION PACKETS P`OR THE MEETING SCHEDULEll ON SEPTEMBER 16, 1993.