HomeMy WebLinkAboutMiscellaneous
PROJECfREVIEW>COMMITTEE REPORT
July 2, 1993
TO: Ben & Nancy Crouch .. ..' . .............'
8700 Appomattox,College Station,TX 77845
DeborahKeating,U rbanDesignGroup
909 Southwest Parkway East, SteE,College Station,TX 77840
FROM: Project Review Committee
Jane Kee,CityPlanner
David Pullen, City Engineer
Craig Hall,P&Z Representative~' . :\.
Others Attending .. .... i . ..\ r
Nat.a..l.i.e ....T.... ho. m.. as,... Plann.. ing..Tecll\I,#.ee\ fl~. ..
George Spain, Fire Inspector ..'--.Y
Tony Michalsky, Electrical Operation Coordinator
Coy Perry, Building Official
s.am.an..t.h.......a... s.m........ith,E..:. n.....gineer..i..ng....A....S.. s~. t.a ant
Sabine. Kuenzel, Staff Planner 1\)~
Ross Albrecht, Forestry Superintendent
Veronica Morgan, Assistant to<the City Engineer
PeteVanacek:, Parks Senior Planner
Gali Dolev, Planning Intern
Claude Cunningham, CSISD Representative
SUBJECT: Final Plat -Cooner Addition; proposed resub'division of two lots located at
111 and 113 Cooner Street, totalling 0.297 acres into one commercial lot.
(93- 222)
A PresubmissionConference meeting was held Wednesday, June 30, 1993 to disCllSS the
above mentioned final plat. The following comments were made by the various
reviewing agents:
ELECTRICAL:
Change the ownership of the electric~lsubstation to the City of Bryan.
Provide a 10' public utility easement along the e.astside of the property and a 15'
public utility easement along the north side of the property for electrical and
telephone. utilities. . Coordinate details with Electrical Operations Coordinator
Tony Michalsky at (409) 764-3660.
SUBMIT 10 COPIES OF THE REVISED FINAL PLAT AND 1 REPRODUCIBLE
BY FRIDAY, JULY 9, 1993 TO BE INCLUDED IN THE PLANNING AND
ZONING COMMISSION PACKETS FOR THE MEETING OF THURSDAY, JULY
15, 1993.