PROJECT REVIEW COMMITTEE REPORT
K.
February 17, 1993
• ' eerln
T0. Michael R. McClure., McClure Engin _ g
1722 Broadmoor Ste 210, Bryan, T~ 77802
Ed Froehling
3887 H1gh Lonesome, College Station, TX 77845
I
,~
Ann M. French
P. O. Box 9262 Coke eStation- TX 7842
g
a
v'ew Committee;. ~.~
~ FROM... Project Re 1 f
Jane Kee, Senior 'Planne
Veronica Mop an Assistant the Ct En veer
_g ~ Y g
Others Attendin_
g ,,
Natal7e Thomas, Planning Technlcran
Samantha Smith, Engineering Assistant
Shirley Volk, Development Coordinator
Deborah .Keating, Project Engineer
George Slain, Fire Inspector.
Tany Michalsky, :Electrical Operations Coord
Coy Perry, Building Official
Laverne Akin GTE Re rescntatve .
p
SUBJECT: FINAL PLAT -Shenandoah .Phase One; lets 10 and 11, block 1 of
Shenandoah Phase .One located along Windswept Drive. (93-204)
~~ A Presubmission Conference was held ~Vednesda , Februa 17, 1993 to discuss the ..above
. , y rY
mentioned final plat. The Project Review Committee made the fallowing comments.:
~ ELECrTRICAL:
a
Provide 'a 5' public utility easement along .the west property line of lot 11A to allow for
~~ ~ the relocation of street lighting. Coordinate details with Electrical Operations Manager
Tony Michalsky at (409) 764-3660.
,~
~~
f
if
SUBMIT 1 FILM POSITIVE AND 10 COPIES OF THE REVISED FINAL PLAT BY
~ FRIDAY FEBRUARY 2~, 1993 T0: BE INCLUDED IN THE PLANNING AND ZONING
COMMISSION PACKETS FOR THE MEETING OF MARCH 4, 1993.