Loading...
HomeMy WebLinkAboutMiscellaneousN ., - j - - I - - :. PROJECT REVIEW COMMITTEE REPORT K. February 17, 1993 • ' eerln T0. Michael R. McClure., McClure Engin _ g 1722 Broadmoor Ste 210, Bryan, T~ 77802 Ed Froehling 3887 H1gh Lonesome, College Station, TX 77845 I ,~ Ann M. French P. O. Box 9262 Coke eStation- TX 7842 g a v'ew Committee;. ~.~ ~ FROM... Project Re 1 f Jane Kee, Senior 'Planne Veronica Mop an Assistant the Ct En veer _g ~ Y g Others Attendin_ g ,, Natal7e Thomas, Planning Technlcran Samantha Smith, Engineering Assistant Shirley Volk, Development Coordinator Deborah .Keating, Project Engineer George Slain, Fire Inspector. Tany Michalsky, :Electrical Operations Coord Coy Perry, Building Official Laverne Akin GTE Re rescntatve . p SUBJECT: FINAL PLAT -Shenandoah .Phase One; lets 10 and 11, block 1 of Shenandoah Phase .One located along Windswept Drive. (93-204) ~~ A Presubmission Conference was held ~Vednesda , Februa 17, 1993 to discuss the ..above . , y rY mentioned final plat. The Project Review Committee made the fallowing comments.: ~ ELECrTRICAL: a Provide 'a 5' public utility easement along .the west property line of lot 11A to allow for ~~ ~ the relocation of street lighting. Coordinate details with Electrical Operations Manager Tony Michalsky at (409) 764-3660. ,~ ~~ f if SUBMIT 1 FILM POSITIVE AND 10 COPIES OF THE REVISED FINAL PLAT BY ~ FRIDAY FEBRUARY 2~, 1993 T0: BE INCLUDED IN THE PLANNING AND ZONING COMMISSION PACKETS FOR THE MEETING OF MARCH 4, 1993.