Loading...
HomeMy WebLinkAboutMiscellaneousY L ~i j - '.. PROJECT REVIEW COMMITTEE REPORT January 6,1993 T0: Christian A. Galindo, Galindo Engineers & Planners j 77802 3833 .South. Texas Ste 280,.. Bryan, TX 1 Mathew Kiran, ,Hopkins -Schaeffer 3701 West_ N W Highway, Ste 169=A, ..Dallas, TX 75220 FROM: Project Review :Committee: Jane Kee, Senior Planner. ~. _. David Pullen, City Engineer ~~ Mary Elizabeth Herring, P & Z Repr `. entative Others Attending: Natalie Thomas, Plannin Technic' g Samantha Smith, Engineering Assistant - ' Shirley Volk, Development Coordinator... Deborah Keating, Project: Engineer { George Spain, Fire Inspector Tony Micha sky, Electrical Operations Coord Mark :Smith, Asst Drectox or Public Services Laverne Akin, GTE Representative Claude Cunningham, CSISD Representative Don Fazzino, Lone ;Star Gas Representative Mike .Lavender,. TCA Cable Representative ~~ .,~~~ ,, ~~ SUBJECT: FINAL PLAT - Chimney ~Ii11 Villas, located at Chimney Hill Drive at Arguello:,. reducing the. number of 'townhome lots from 13 to 11. (93-203) A Presubmssion Conference was held Wednesday, January 6 1993 to discuss the above mentioned;` final plat. ~,; .The- Project Review Committee made the following comments: ENGINEERING: In` order to prevent drainage from the alley entering a building on of 11, it is recommended that the finished floor elevation of the building on lot... 11 be at leant 1' above the highest adjacent point. of the alley and that a drainage way be provided between lot ` 11 and :..the 'existing structures on lot 14. Coordinate details with City Engineer David Pullen at (409} 764-3570. UTILITIES: Relocation of any existing utilities (including electrical, .telephone, cable,..: etc.) -will be at the expense of the developer. PLANNINGr. Submit paid tax certificates,.- 1 SUBMIT 1 FILM POSITIVE AND 10 COPIES OF THE REVISED FINAL PLAT. BY FRIDAY, JANUARY 15, 1993 TO BE INCLUDED IN THE PLANNING AND ZONING COMMISSION PACKETS FOR THE JANUARY 21,1993 MEETING.