Loading...
HomeMy WebLinkAboutStaff ReportSTAFF REPORT Item: Public Hearing and Consideration of a Rezoning for Sandstone Addition, Lot 20, a 14.41 acre tract located in the Sandstone Subdivision at the end of Oakwood Trail. (HTE #99-181, Case File #99-130) Applicant: Tony Jones Item Summary: This tract is surrounded by the Foxfire and Sandstone subdivisions on the east, south and west and Sandstone Park on the north. It contains 14.41 acres and lies at the end of Oakwood Trail in the Sandstone Subdivision. Foxfire is zoned A-OR Rural Residential (minimum one acre lots) and Sandstone is zoned R-1 Single Family although the lots meet the A-OR dimensions. The developer intends to build large (over one acre lots) for single family development. A plat will come before the Commission in January. The land use plan reflects this area for low density single family development. This density calls for lots ranging from 'h acre to 3 acres in size. The plat that will come before you contains 9 lots ranging from just over one acre to just over 4 acres. Staff Recommendations: Staff recommends approval of the rezoning. Related Advisory Board Recommendations: NA Commission Action Options: The Commission acts as a recommending body on the question of rezoning, which will be ultimately decided by City Council. The Commission options are to recommend approval of rezoning as submitted, recommend approval with physical conditions that will mitigate negative impacts, recommend a less intense zoning classification, recommend denial, table indefmitely, or defer action to a specified date. Infrastructure and Facilities Water and sewer extensions will be made as part of the platting process, as will the extension of Oakwood trail to provide access. Parkland dedication will be addressed at the time of platting. Notification: Legal Notice Publication(s): The Eagle; 12-1-99 and 12-29-99 Advertised Commission Hearing Dates(s): 12-16-99 Advertised Council Hearing Dates: 1-13-00 Number of Notices Mailed to Property Owners Within 200': 17 Response Received: None as of date of staff report Supporting Materials: 1. Location Map 2. Application