HomeMy WebLinkAboutStaff ReportSTAFF REPORT
Item: Public Hearing and Consideration of rezoning 7.2 acres. located .approximately 290 feet west
of FM 2818, south of F&B Road from R-1, Single Family to C-2 Commercial Industrial. (99-
105)
Applicant: James E. Jett, Trustee for Mary Feltner Futrell, property owner
Item Summary: The subject property was annexed into the City in 1970 and was zoned R-1 when
it was annexed. At that time, R:1 wasused as the temporary holding zone for property annexed
into the .City..
The applicant is requesting a rezoning of the subject property to develop a portion of it as an
overnight delivery service distribution terminal. The C-2 zoning district is considered a
commercial-industrial. district. Thee broad range of C-2 permitted uses includes C-1 uses (retail,
restaurants, theaters,: nightclubs, auto dealerships, etc.) as well as more industrial uses such as
lumber yards and machine shops.
The City's land use plan shows the area (bounded by FM 2818 on the east, the city limits on the
west, F&B Road on the .north :and FM 60 on the south) as Retail Regional, which would include
such development as retail centers, service commercial, and restaurants to name a few. Adjacent
and o the west of the retail regional, the City's land use .plan shows Industrial R&D development
which .would include industraUR&D parks,. technology, centers, clean manufacturing, and
assembly/distribution. To the north, the property is institutional and is owned by TAMU. To the
east across. FM 28.18 the -property is again owned by TAMU. The property immediately to the
south of this tract is partly owned by TAMU and the: other is owned by a joint venture, zoned C-1
and is currently undeveloped.. The property to the west of this subjecttract is not located within
either the City of College .Station or the City of Bryan but. is within the. extraterritorial jurisdiction
of the City of College..Station. Since thin property is located outside the city limits for the City of
Bryan, theirland use planedoes not reflect this property.
The: request is in general compliance with the City's Land Use Plan.. Expanding the Industrial area
on the land use plan to incorporate this tract could be supported. The area infrastructure is not
adequate to support development that might follow the rezoning request. There is no City sanitary
sewer available to this tract and water is notavalable for domestic (office, restrooms, etc.) uses or
for fire suppression (fire hydrants and/or sprinkler systems). (See infrastructure comments for
more detailed discussion).. However, there are .alternatives for at least sewer service. On-site
disposal systems can provide .wastewater treatment.. If .arrangements could be made with another
domestic-water provider, there-are variance procedures to the. fire code that can be sought for the
fire protection situation. The other infrastructure concern is with access which is available only
from F&B Road which is narrow and of poor quality.
Staff Recommendations: There.. is not an issue as to whether or not a commerciaUindustrial
zoning. district is, appropriate at this location. The Comprehensive Plan reflects this area as having
commercial and research/industrial uses. The principle concern is .the timing of the zoning and
development relative to area infrastructure.
Water and wastewater services are not available to t>1e area. However, this may not need to limit
the zoning. There are alternate means. for providing services and variance processes to deal with
o:\group\deve_ser~stSpt\99-1OS.doc
this type of situation. It is possible. that developmentcould be limited by the ability of the site to
support on site systems such as septic systems and .alternative water supplies.
Street access is a concern.. Access to the site is via F&B Road. F&B is not adequate for
conunerciaUindustrial traffic.. Staff recommends denial of the request for C-2 zoning until F&B
Road has adequate: capacity and utility concerns are addressed through variances and/or access to
other providers for such zoning and development.
Related Advisory Board Recommendations: N/A
Item Background: February 23, 1970 -Ord. no. b73 annexed the area along FM 60 from TAMU
to just south of FM 2818 and over to F&B Road into the City of College Station. This annexation
included the subject tract and it has remained R-1 since that time.
Jan. 26, 1989 -Ord. no. 1794 rezoned the adjacent 10.12 acre Toler tract to C-1.
An area to the .south of this tract, fronting on FM 281.8,. was rezoned to G 1 in 1970.
The overall. area (north of FM 60 and west of FM 2818). has experienced only limited development
since annexation. due to lack of adequate water and wastewater services for development. Water is
provided through a 1-1/2-inch waterline: that connects to the Texas A&M University system and
this line is at currently at capacity given'TNRCC requirements. Sewer service is limited to on-site
private_systems (primarily septic systems).
On October 8, 1998, the- City Council approved a contract for a Water and Wastewater Master
Plan for the west;side which would include thisproperty. This study is currently underway.
Commission Action Options; The Commission acts as a recommending body on the question of
rezoning, which will be ultimately decided by City Council. The Commission options are to
recommend approval of rezoning as submitted, recommend approval with physical conditions that
will mitigate negative impacts, recommend a less intense zoning classification, recommend denial,
table indefinitely, or defer action to a specified date.
Supporting Materials•
h Location Map
2. Application
3. Infrastructure andNotification Information
o:\group\deve_serlctfi~pt\99-1OS.doc
INFRASTRUCTURE AND .FACILITIES
Water: There is currently no City of .College Station water infrastructure in the area.
Those lots thatare currently receiving service are..doing so via anagreement between the
City and TAMU for a TAMU service line to be used. The area falls within the College
Station CCN (Certificate of Convenience`and Necessity). area. Staff is currently working
with McClure Engineering on a water and sewer master plan study to serve the west side
of College Station with. utility service.
Sewer: There is currently no City of College .Station sewer infrastructure in the area.
Stag is currently working with McClure Engineering on a water and sewer master plan
study;to serve the west side of College Station'with utility service.
Streets: F&B Road currently provides sole access to the site.
.Off-site Easements: Would be necessary for all infrastructure extensions that could not
be constructed on site..
Sidewalks: Maybe warranted based on potential street upgrades.
Drainage: Would be handled at the time of site, development.
Flood Plain: Floodplain is located on this property.
®versize request: Wi111ikely be requested if the property develops and is required to
make infrastructure extensions, as both'water and sewer will have to be sized such that
future development can tie.. into these lines.
Parkland Dedication: Required under current zoning but. not under the requested
rezoning.
Impact Fees: None required in this area
NOTIFICATION:
Legal Notice Publication(s): The Eagle; 2-17-99
Advertised Commission Hearing Dates(s); March 4, 1999
Advertised Council Hearing Dates: March 25, 1999
Number of Notices Mailed to Property Owners Within 200': 6
Response/Inquiries Received: 12 as of date of staff report
o:~groupWeve_serlstfrpt~99-1O5.doc
STAFF REPORT
Item: Public Hearing and Consideration of rezoning 7:2 acres located approximately 290 feet west
of FM 281:8, south of F&B Road. from R-1 Single Family to C-1 General Commercial. (99-105)
Applicant: James E. Jett, Trustee for Mary Feltner Futrell, property owner
Item Summary: This- rezoning has been-returned to the Commission for. consideration as a C-1
General Commercial zone. In March the Commission considered a request .for C-2 Commercial-
Industrial. The Commission recommended. denial without prejudice. The. Council denied the C-2
request and returned the. item to the Commission for -consideration of C-1 zoning.. The Council
understood the utility issues and alternatives for services. Access to F&B Road was identified as a
concern.
The. applicant is requesting the rezoning of the subject .property for future development to C-1 (as
returned by Council). C-1 allows a broad range of uses .including retail, restaurants, theaters,
nightclubs, and auto dealerships. It does not include. some of the more intense industrial uses such
as lumber yards and machine;shops, allowed in the earlier C-2 request.
The: subject property was annexed: into. the City in 1970 and was zoned R 1 when it was annexed.
At that time, R 1 was used as the temporary holding zone for property annexed into the City.
The City's land use plan shows the-area (bounded by FM 2818 on-theeast, the city limits on the
west, F&B Road on the north and FM 60 on the south).. as Retail Regional, which would include
such development as retail centers, service commercial, and restaurants to name a few. Adjacent
and to the west of the retail regional, the. City's land use plan shows Industrial R&D development
which would include... industriaUR&D parks, .technology centers, clean manufacturing, and
assembly/distribution. Property to the north is institutional and is owned by Texas A&M
University (TAMin. To the east, across FM 2818, the property is owned by TAMU. Property
immediately. to the: south includes a tract is owned by TAMU and a C-1 tract owned by a joint
venture (currently undeveloped). The property to the west of this subject tract is not located within
the City. but is within the extraterritorial jurisdiction of the City of College Station. This tract
includes an existing single family. residence..
The request is in compliance with the City's Land Use Plan. There is an existing single-family
residence immediately to the west of thin property, which could pose potential land use and
buffering issues.
The area public, infrastructure is not adequate to support development at this time. There is no
City sanitary sewer available to this: tract, requiring the use of on-site disposal systems. Water is
adjacent but capacity may not be currently available for domestic (office,. restrooms, etc.) uses or
for fire suppression (fire hydrants and/or sprinkler systems).. See infrastructure comments for more
detailed discussion. Capacity issues will have to be resolved atthe..time of development. If fire
suppression requirements can not be met, alternate provisions for fire. suppression can be
considered with. applications for variance to the fire code. The other infrastructure concern is
access to F&B Road, which is narrow and of poor .quality.
Staff Recommendations: There is not an issue as to whether or not a retail zoning district is
appropriate at this. location. The Comprehensive Plan reflects this. area as having retail commercial
o:\groupWeve_see\st&pt\99-1 OSrw.doc
and research/industrial uses. The principle. concern is the timing. of the area development relative
to area infrastructure.
Water and. wastewater cervices are. not available to the area. However, .this may not need to limit
the zoning. There. are alternate. means for providing services and variance processes to deal with
this type of situation.. It is possible that development could be limited by the ability of the site to
support. on site systems such as septic. systems and alternative water. supplies:
Street access is _a concern.. Access to the site.. is via F&B .Road. F&B is not adequate for traffic
that may be generated by C-1 uses. Staff recommends. cpproval of the request for C-1 with the
conditions that access be taken from FM2818 or that F&B road be improved from the. western
property line of -the subject tract to FM2818, providing adequate capacity for the development
proposed. (Utility concerns will have to be addressed at the time of development through providing
adequate facilities and/or obtaining variances before permits canoe issued).
Related Advisory Board Recommendations.:. See Council minutes attached.
Item Background: February 23, 1970 -Ord. no. 673 annexed the area along FM 60 from TAMU
to just south of FM 2818 and over to: F&B Road into the. City of College Station. This annexation
included the subject tract and it has remained'R-l since that time.
Jan. 26, 1989 -Ord. no. 1794 rezoned the;adjacent 10.12 acre Toler tract to C-1.
An area to the south of this tract, fronting on FM 2818, was rezoned to C-I in T970.
The overall area.(north.of FM 60 and west of FM 2818): has experienced only limited development
since annexation due to lack of :adequate water and wastewater services for development. Water is
provided through a 1-1/2-inch waterline that connects to .the Texas. A&M University system and
this line is at currently at capacity given TNRCC requirements. Sewer service is limited to on-site
private systems (primarily septic. systems).
On October 8, 1998, the. City Council.: approved a contract for a Water and Wastewater Master
Plan for the west side which would include. this. property.. This study is .currently underway.
Commission Action Options: The Commission acts as a recommending. body on the question of
rezoning, .which.. will be ultimately decided by City Council. The Commission options are to
recommend approval of rezoning as submitted, recommend approval with physical conditions that
will mitigate negative impacts, recommend a less intense zoning classification, recommend denial,
table indefinitely, or defer action to a specified date.
Supporting Materials:
1. Location Map
2. Application.
3: .Infrastructure and Notification Information
4. Council minutes
o:\goup\deve_serl~fiptV 9-105rw. doc
INFRASTRUCTURE.RND FACILITIES
Water: There: is currently no City of College .Station water infrastructure in the area.
Those lots that are currently receiving service are. doing o via an agreement between the
City and TAMU for a TAMU service line to be used.- The area falls within the College
Station CCN (Certificate of Convenience and Necessity) area. Staff is currently working
with McClure Engineering on a water and sewer master plan study to serve the west side
of College Station with utility service.
Sewer:. There is currently. no City of College: Station sewer infrastructure in the area.
Staff is .currently working with McClure Engineering on a water and sewer master plan
study to serve the west. side of College .Station with utility service.
Streets F&B Road currently provides sole access to a site.
Off--site Easements: Would'be` necessary for all infrastructure extensions that could not
be constructed on site.
Sidewalks; Maybe warranted based on potential street upgrades.
Drainage:. Would be handled at the time. of site development.
Flood Plain:- Floodplain is located on his property.
Oversize request: Will likely be requested if the. property develops and is required to
make infrastructure extensions, as both water and sewer .will have to be sized such .that
future development can tie into these lines.
Parkland Dedication:. Required under current zoning but not under the requested
rezoning.
Impact Fees: None required in this area
NOTIFICATION:.
Legal Notice Publication(s): The Eagle; 4-21-99
Advertised,Commission Hearing Dates(s): May 6, 1999
Advertised Council Hearing Dates: May 27, 1999
Number of Notices Mailed to Property Owners. Within 200': 6
Response/Inquries Received:. none as of date of staff report
o:~group~deve_sec~stfrpt~99-1 OSrw.doc
R~1-~o5
^X .Regular Item
~-~
Consent Item ` ~ `,'
Workshop Item
Item Submitted By: ~Ieronica Morgan, Assistant City .Engineer
Council Meeting Dater May 27, 1999.
Director Approval: Jim Callaway, Development Services Director
City Manager Approval:
Item: Public hearing, discussion, and possible action on rezoning 7.2 acres located
approximately 290 feet west of Fly 2818, south ®f F&B Road from R-1 Single Family to
C-1 General Commercial. The applicant i~ James E. Jett, trustee for Mary Feltner
Futrell, property owner. (99-105)
Item Summary: This rezoning: was before the Council as C-2_in March 1999. At that
time, the Council. voted unanimously to defer consideration of the item and return it to the
Commission for consideration as a C-1 General Commercial zone.. At their May 6, 1999
meeting, the Planning & Zoning Commission voted to approve the C-1 zone with staff
recommendations.
The applicant is requesting the rezoning of the subject. property for future .development to
C-1 (as returned by Council). C-1 allows a broad range of uses including retail,
restaurants, theaters, nightclubs, and auto dealerships. It does not include some of the
more intense industrial uses such as lumber yards and machine shops, allowed in the
earlier C-2 request.
The subject property was annexed into the City in 1970 and was zoned. R-1 when it was
annexed. At that time, R-1 was used as the temporary holding zone for property annexed
into the City.
The City's land use plan shows the area (bounded by FM 2818 on the east, the city limits
on the west, F&B Road on the north and FM 60 on the south) as Retail Regional, which
would include such development as retail centers, service commercial, and restatarants to
name a few. Adjacent and to the west of the retail regional, the City9s land use plan
shows Industrial R&D development which would include industrial/R&D parks,
technology centers, clean manufacturing, and assembly/distribution. Property to the
north is institutional and is owned by Texas A&M University (TAMU). To the east,
across FM 2818, the property is owned by TAMU. Property immediately to the. south
includes a tract is owned by TAMU and a C-1 tract owned by a joint venture (currently
undeveloped). The property to the west of this subject tract is not located within the City
but is within the extraterritorial jurisdiction of the City of College Station. This tract
includes an existing single family residence.
The request is in compliance with the City9s Land Use Plan. There is an existing single-
family residence immediately to he west of this property, which could pose potential
land use and buffering issues.
The area public infrastructure is not. adequate to support development at this time. There
is no City sanitary sewer available to this tract, requiring the use of on-site disposal
systems. Water is adjacent but capacity may not be currently available for domestic
(office, restrooms, etc.) uses ar' for fire suppression (fire hydrants and/or sprinkler
systems). See infrastructure comments for more detailed discussion. Capacity issues will
have to be resolved. at the time of development. If fire suppression requirements can not
be met, alternate provisions for fire suppression can be considered with applications for
variance to the fire code. The other infrastructure concern is access to F&B Road, which
is narrow and of poor quality.
Item Background: February 23, 1970 - Oxd. no. 673 annexed the area along FM 60
from TAMU to just south of FM 2818 and over to F&B Road into the City of College
Station. This annexation included the subject tract and it has remained R-1 since that
time.
Jan. 26, 1989 -Ord. no. 1794 rezoned the. adjacent 10.12 acre Toler tract to C-1.
An area to the south of this tract, fronting on FM 2818, was rezoned to C-1 in 1970.
The overall area (north of FM 60 and west of FM 2818) has experienced only limited
development since annexation due to lack of adequate water and wastewater services for
development. Water is provided through a 1-1 /2-inch waterline that connects to the
Texas A&M University system and this line is at currently at capacity given TNRCC
requirements. Sewer service is limited to on-site private systems (primarily septic
systems).
On October 8, 1998, the City Council approved a contract for a Water and Wastewater
Master Plan for the west side which would include this property. This study is currently
underway.
Staff Recommendations.. There is not an issue as to whether or not a retail zoning
district is appropriate at this location. The Comprehensive Plan reflects. this area as
having retail commercial and research/industrial uses. The principle concern. is the
timing of the area development relative. to area infrastructure.
Water and wastewater services are not available to the area. However, this may not need
to limit the zoning. There are alternate means for providing services and variance
processes to deal with this type of situation. It is possible that development could be
limited by the ability of the site to support. on site systems such as septic systems and
alternative water supplies.
o a
Street access is a concern. Access to the site is via F&B Road. F&B is not adequate for
traffic that may be generated. by C-1 uses. Staff recommends approval of the request for
C-1 with the conditions that access be ialcen from FM2$18 or that F&B road be improved
from the western property line of the subject tract to FM2818, providing adequate
capacity for the development proposed.. (Utility concerns will have to be addressed at the
time of development through providing adequate facilities and/or obtaining variances
before permits can be issued).
Related Advisory Board Recommendations. See P&Z minutes attached.
Council Action Options:
1. Approval of rezoning as submitted.
2. Approval with conditions.
3. Denial.
4. Denial without prejudice.
5. Table indefinitely.
6. Defer action to a specified date,
Supporting Materialsa
1. Location Map.
2. Application.
3. Infrastructure and Notification Information.
4. P&Z minutes.
4 ~
INFRASTRUCTURE AND FACILITIES
Water: There is currently no City of College.Station water infrastructure in the area.
Those lots that are currently receiving service are doing so via an agreement between the
City and TAMU for a TAMU service line to be used. The area falls within the College
Station CCN (Certificate of Convenience and Necessity) area. Staff is currently working
with McClure Engineering on a water and sever master plan study to serve the west side
of College Station with utility service,
Sewer: There is currently no City of College .Station sewer infrastructure in the area.
Staff is currently working with McClure Engineering on a water and sewer master plan
study to serve the west side of College Station wzth utility service.
Streets: F&B Road currently provides sole access to the site.
Off-site Easements: Would be necessary for all infrastructure extensions that could not
be constructed on site.
Sidewalks: May be warranted based on potential street upgrades.
Drainage: Would be handled at the time of site development.
Flood Plain: Floodplain is located on this property.
Oversize request: Will likely be requested if the property develops and is required to
make infrastructure extensions, as both water and sewer will have. to be sized such that
future development can tie into these lines. `
Notification:
Legal Notice Publication(s): The Eagle; 5-12x99
Advertised Commission Hearing Dates(s): May 6, 1999
Advertised Council Hearing Dates: May 27, 1999
Number of Notices Mailed to Property Owners Within 200': 6