Loading...
HomeMy WebLinkAboutField NotesF A The Wallace Group, Inc. Engineers ~ Architects ^ Planners ^ Surveyors Waco ^ Killeen ^ Austin ^ Temple PEBBLE CREEK, PHASE ?-A CITY OF COLLEGE STATION, BRAZOS COUNTY, TEXAS ti Gale Arnold, R.PL.~~: George Jezek, A.I.A: M(ke Keahey, P.E., R.P,LS. June E. Lykes, P.E. J.A. "Jake" Pavlas, Jr. P.E. Chris Ruiz, P.E. George E. "Jed" Walker, Jr„ P.E. R.E. "Bob" Wallace, P.E., R.P.LS, Otto E, Wiederhold, P.E. John F. Winkler, P.E. BEING A 42.88 ACRE TRACT OF LAND, THE PROPOSED PEBBLE CREEK, PHASE 7-A, AN ADDITION TO THE CITY DF COLLEGE STATION, BRAZOS COUNTY, TEXAS,. LOCATED IN THE S.W. ROBERTSON SURVEY, ABSTRACT NO. 202, BRAZOS COUNTY, TEXAS AND BEING OUT OF A RESIDUE OF A CALLED 677.49 ACRE TRACT DESCRIBED AS "TRACT 5" IN A DEED TO PEBBLE CREEK 13EVELOPMENT COMPANY RECORDED IN VOLUME 1671, PAGE 276 OF THE BRAZOS COUNTY, OFFICIAL PUBLIC RECORDS, AND A TRACT DESCRIBED AS "TRACT SIX" IN A DEED TO PEBBLE CREEK COUNTRY CLUB, INC. RECORDED TN VOLUME 2303, PAGE-251 OF SAID OFFICIAL PUBLIC RECORDS. SAID 42.88 ACRE TRACT BEING MORE PARTICULARLY SHOWN ON THE ATTACHED PLAT OF WHICH IS MADE A PART HEREOF AND BEING FURTHER DESCRIBED BY METES AND BOUNDSAS FOLLOWS WITH BEARINGS BASED. ON THE MONUMENTED SOUTH LINE OF BLOCK 29 OF PEBBLE CREEK, PHASE 6, RECORDED IN VOLUME 2866, PAGE 7 OF SAID OFFICIAL PUBLIC RECORDS SAID LINE BEARS N 74°32' 18" E - 896.01': BEGINNING AT A POINT IN THE NORTHEAST LINE OF PEBBLE CREEK PARKWAY, THE WESTERLY LINE OF THE ABOVE MENTIONED "TRACT 5", MARKING THE NORTHWEST CORNER OF THE PROPOSED PEBBLE CREEK, PHASE 7-A, FROM WHICH A'/z" DIAMETER :REBAR FOUND AND ADJUSTED MARKING THE NORTHWEST CORNER OF "TRACT 5'' RESIDUE, SAME BEING A WESTERLY CORNER OF THE ABOVE MENTIONED "TRACT SIX" BEARS N 39°33'57" W - 2.28', ALSO FROM WHICH A'h" DIAMETER REBAR FOUND SET IN .CONCRETE MARKING THE SOUTHEAST CORNER OF THE ABODE MENTIONED BLOCK 29 OF PEBBLE CREEK, PHASE 6 BEARS S 47°33'47" W - 1723.50'; THENCE N 50°26'03" E -.65.93' LEAVING SAID LINE OF PEBBLE CREEK PARKWAY, ALONG THE NORTHERLY LINE OF THE PROPOSED .PHASE 7-A, SAME BEING THE PROPOSED EASTERLY EXTENSION OF ROYAL ADELADE DRIVE (60.00' RIGHT-OF-WAY) TO A POINT FOR THE POINT OF CURVATURE OF A CURVE TO THE RIGHT; THENCE AN ARC DISTANCE OF 276.38' CONTINUING ALONG SAID RIGHT-OF-WAY AND A CURVE TO THE RIGHT HAVING A RADIUS OF 1200.00' AND A CHORD OF N 57°01'56" E - 275.77' TO A POINT FOR A CORNER OF SAID PHASE 7-A; i THENCE N 0$°32'54" W - 220.83' LEAVING SAID RIGHT-OF-WAY ALONG A LINE OF FHASE 7-A TO A ~h" DIAMETER REBAR PLACED FOR A CORNER OF PHASE 7-A; THENCE N 50°27'.18" E, AT 18,71' PASSING A 1/z"DIAMETER REBAR FOUND FORA CORNER OF SAID "TRACTS" AND "TRACT SIX", CONTINUING-ALONG A COMMON LINE OF SAID TRACTS AN ADDITIONAL DISTANCE OF 165.67' PASSING A 1/z"'DIAMETER REBAR FOUND FOR A CORNER OF "TRACT 5" AND "TRACT SIX", CONTINUIT~G FOR A TOTAL DISTANCE OF 200.53' TO A I/z" DIAMETER REBAR PLACED FOR A CORNER OF SAID PHASE 7-A; P. O. Box 22007- Waco, Texas 7b702 8225 Central ParkDrlve, Suite 100 -Waco, Texas 7b712 (254 772-9272 -Fax (254) 77b-2424 e t+ THENCE S 75°13'44" E - 247.36' TO A 1/z" DIAMETER REBAR PLACED FOR A CORNER OF SAID PHASE 7-A; THENCE N 69°43' 36" E - 700.96' TO A 1/2" DIAMETER REBAR PLACED FOR A CORNER OF SAID PHASE 7-A; THENCE N 53°14' 19" E - 98.24' TO A'/z".DIAMETER REBAR PLACED FOR THE MOST NORTHERLY OR NORTHEAST CORNER OF SAID PHASE 7-A; THENCE S 43°00'09" E -ALONG THE EASTERLY LINE OF SAID PHASE 7-A, AT 47.35' PASSING A COMMON LINE OF SAID "TRACT 5" AND "TRACT SIX", CONTINUING FOR A TOTAL DISTANCE OF 276.81' TO A POINT ON A CURVE TO THE RIGHT FOR A CORNER OF SAID PHASE 7-A; THENCE CONTINUING THROUGH THE INTERIOR OF SAID "TRACT 5" THE FOLLOWING 19 COURSES: 1) AN ARC DISTANCE OF 21.68' ALONG SAID CURVE TO THE RIGHT HAVING A RADIUS OF 860.00' AND A CHORD OF S 47°43' 12" W - 21.68' TO A POINT FOR A CORNER OF SAID PHASE 7-A, 2) S 39°33'57" E - 155.99' TO A POINT FORA CORNER OF SAID PHASE 7-A, 3) S 50°26'03" W - 10.01' TO A POINT FOR A CORNER OF SAID PHASE 7-A, 4) S 39°33'57" E - 160.09' TO A POINT FORA CORNER OF SAID PHASE 7-A, 5) N 51°35'03" E - 21.77' TO A POINT FOR A CORNER OF SAID PHASE 7-A, 6) S 38°24'57" E - 50.00' TO A POINT FOR AN ANGLE POINT DF SAID PHASE 7-A, 7) S 39°33'57" E - 447.40' TO A POINT FOR THE SOUTHEAST CORNER OF SAID PHASE 7-A, 8) S 45°10'44'' W - 131.92' TO A 1/z" DIAMETER REBAR PLACED FOR AN ANGLE POINT OF SAID PHASE 7-A, 9) S 35°33' 16" W - 129.48' TO A 1/z" DIAMETER REBAR PLACED FOR AN ANGLE POINT OF SAID PHASE 7-A, 10)' S 62°50'35" W - 105.22' TO A'h" DIAMETER REBAR PLACED FOR AN ANGLE POINT OF SAID PHASE 7-A, 11) S 72°33'38" W - 201.84' TO A'/i" DIAMETER REBAR PLACED FOR AN ANGLE POINT OF SAID PHASE 7-A, 12) S 6$°33'57" W - 291.60' TO A lh" DIAMETER REBAR PLACED FOR AN ANGLE POINT OF SAID PHASE 7-A, 13) S 67°40' 19" W - 186.18' TO A 1/z".DIAMETER REBAR PLACED FOR AN ANGLE POINT OF SAID PHASE 7-A, 14) S 70°17'58" W - 64.82' TO A '/z" DIAMETER REBAR PLACED FOR AN ANGLE POINT OF .SAID PHASE 7-A, 15) S 58°39'39" W - 93.29' TO A ~/z" DIAMETER REBAR PLACED FOR AN ANGLE POINT OF SAID PHASE 7-A, 16) S 50°26'29" W - 150.44' TO A '/z"DIAMETER REBAR PLACED FOR AN ANGLE POINT OF SAID PHASE:?-A, 17) S 62°14'5.9" W - 98.48' TO A '/z" DIAMETER REBAR PLACED FOR AN ANGLE POINT OF SAID PHASE.?-A, 18) S 27°58'42" W - 123.33' TO A '/z"DIAMETER REBAR PLACED FOR AN ANGLE POINT OF SAID PHASE 7-A, 19) ANDS 41°52'34" W - 49.10' TO A '/z" DIAMETER REBAR PLACED IN THE EAST LINE OF PEBBLE CREEK PARKWAY, SAME BEING THE WEST LINE THE ABOVE MENTIONED "TRACT 5" RESIDUE,-FOR THE SOUTHWEST CORNER OF SAID PHASE 7-A, i ~ Y y~ THENCE N 39°33'57" W - 1170:76' ALONG SAID LINE OF PEBBLE CREEK PARKWAY TO THE POINT OF BEGINNING. CALCULATED FROM GRO~TD SURVEYS PERFORMED ECEMBER, 1998 1 WO# 8803 PLAT D-1237A 8803PH7A-FN-06.DOC MAP CHK'D BY KRH 3