HomeMy WebLinkAboutField NotesF A
The
Wallace
Group, Inc.
Engineers ~ Architects ^ Planners ^ Surveyors
Waco ^ Killeen ^ Austin ^ Temple
PEBBLE CREEK, PHASE ?-A
CITY OF COLLEGE STATION, BRAZOS COUNTY, TEXAS
ti
Gale Arnold, R.PL.~~:
George Jezek, A.I.A:
M(ke Keahey, P.E., R.P,LS.
June E. Lykes, P.E.
J.A. "Jake" Pavlas, Jr. P.E.
Chris Ruiz, P.E.
George E. "Jed" Walker, Jr„ P.E.
R.E. "Bob" Wallace, P.E., R.P.LS,
Otto E, Wiederhold, P.E.
John F. Winkler, P.E.
BEING A 42.88 ACRE TRACT OF LAND, THE PROPOSED PEBBLE CREEK, PHASE 7-A, AN
ADDITION TO THE CITY DF COLLEGE STATION, BRAZOS COUNTY, TEXAS,. LOCATED IN
THE S.W. ROBERTSON SURVEY, ABSTRACT NO. 202, BRAZOS COUNTY, TEXAS AND BEING
OUT OF A RESIDUE OF A CALLED 677.49 ACRE TRACT DESCRIBED AS "TRACT 5" IN A
DEED TO PEBBLE CREEK 13EVELOPMENT COMPANY RECORDED IN VOLUME 1671, PAGE
276 OF THE BRAZOS COUNTY, OFFICIAL PUBLIC RECORDS, AND A TRACT DESCRIBED AS
"TRACT SIX" IN A DEED TO PEBBLE CREEK COUNTRY CLUB, INC. RECORDED TN VOLUME
2303, PAGE-251 OF SAID OFFICIAL PUBLIC RECORDS. SAID 42.88 ACRE TRACT BEING MORE
PARTICULARLY SHOWN ON THE ATTACHED PLAT OF WHICH IS MADE A PART HEREOF
AND BEING FURTHER DESCRIBED BY METES AND BOUNDSAS FOLLOWS WITH BEARINGS
BASED. ON THE MONUMENTED SOUTH LINE OF BLOCK 29 OF PEBBLE CREEK, PHASE 6,
RECORDED IN VOLUME 2866, PAGE 7 OF SAID OFFICIAL PUBLIC RECORDS SAID LINE
BEARS N 74°32' 18" E - 896.01':
BEGINNING AT A POINT IN THE NORTHEAST LINE OF PEBBLE CREEK PARKWAY, THE
WESTERLY LINE OF THE ABOVE MENTIONED "TRACT 5", MARKING THE NORTHWEST
CORNER OF THE PROPOSED PEBBLE CREEK, PHASE 7-A, FROM WHICH A'/z" DIAMETER
:REBAR FOUND AND ADJUSTED MARKING THE NORTHWEST CORNER OF "TRACT 5''
RESIDUE, SAME BEING A WESTERLY CORNER OF THE ABOVE MENTIONED "TRACT SIX"
BEARS N 39°33'57" W - 2.28', ALSO FROM WHICH A'h" DIAMETER REBAR FOUND SET IN
.CONCRETE MARKING THE SOUTHEAST CORNER OF THE ABODE MENTIONED BLOCK 29 OF
PEBBLE CREEK, PHASE 6 BEARS S 47°33'47" W - 1723.50';
THENCE N 50°26'03" E -.65.93' LEAVING SAID LINE OF PEBBLE CREEK PARKWAY, ALONG
THE NORTHERLY LINE OF THE PROPOSED .PHASE 7-A, SAME BEING THE PROPOSED
EASTERLY EXTENSION OF ROYAL ADELADE DRIVE (60.00' RIGHT-OF-WAY) TO A POINT
FOR THE POINT OF CURVATURE OF A CURVE TO THE RIGHT;
THENCE AN ARC DISTANCE OF 276.38' CONTINUING ALONG SAID RIGHT-OF-WAY AND A
CURVE TO THE RIGHT HAVING A RADIUS OF 1200.00' AND A CHORD OF N 57°01'56" E -
275.77' TO A POINT FOR A CORNER OF SAID PHASE 7-A; i
THENCE N 0$°32'54" W - 220.83' LEAVING SAID RIGHT-OF-WAY ALONG A LINE OF
FHASE 7-A TO A ~h" DIAMETER REBAR PLACED FOR A CORNER OF PHASE 7-A;
THENCE N 50°27'.18" E, AT 18,71' PASSING A 1/z"DIAMETER REBAR FOUND FORA CORNER
OF SAID "TRACTS" AND "TRACT SIX", CONTINUING-ALONG A COMMON LINE OF SAID
TRACTS AN ADDITIONAL DISTANCE OF 165.67' PASSING A 1/z"'DIAMETER REBAR FOUND
FOR A CORNER OF "TRACT 5" AND "TRACT SIX", CONTINUIT~G FOR A TOTAL DISTANCE
OF 200.53' TO A I/z" DIAMETER REBAR PLACED FOR A CORNER OF SAID PHASE 7-A;
P. O. Box 22007- Waco, Texas 7b702
8225 Central ParkDrlve, Suite 100 -Waco, Texas 7b712
(254 772-9272 -Fax (254) 77b-2424
e
t+
THENCE S 75°13'44" E - 247.36' TO A 1/z" DIAMETER REBAR PLACED FOR A CORNER OF SAID
PHASE 7-A;
THENCE N 69°43' 36" E - 700.96' TO A 1/2" DIAMETER REBAR PLACED FOR A CORNER OF SAID
PHASE 7-A;
THENCE N 53°14' 19" E - 98.24' TO A'/z".DIAMETER REBAR PLACED FOR THE MOST
NORTHERLY OR NORTHEAST CORNER OF SAID PHASE 7-A;
THENCE S 43°00'09" E -ALONG THE EASTERLY LINE OF SAID PHASE 7-A, AT 47.35' PASSING
A COMMON LINE OF SAID "TRACT 5" AND "TRACT SIX", CONTINUING FOR A TOTAL
DISTANCE OF 276.81' TO A POINT ON A CURVE TO THE RIGHT FOR A CORNER OF SAID
PHASE 7-A;
THENCE CONTINUING THROUGH THE INTERIOR OF SAID "TRACT 5" THE FOLLOWING 19
COURSES:
1) AN ARC DISTANCE OF 21.68' ALONG SAID CURVE TO THE RIGHT HAVING A RADIUS
OF 860.00' AND A CHORD OF S 47°43' 12" W - 21.68' TO A POINT FOR A CORNER OF SAID
PHASE 7-A,
2) S 39°33'57" E - 155.99' TO A POINT FORA CORNER OF SAID PHASE 7-A,
3) S 50°26'03" W - 10.01' TO A POINT FOR A CORNER OF SAID PHASE 7-A,
4) S 39°33'57" E - 160.09' TO A POINT FORA CORNER OF SAID PHASE 7-A,
5) N 51°35'03" E - 21.77' TO A POINT FOR A CORNER OF SAID PHASE 7-A,
6) S 38°24'57" E - 50.00' TO A POINT FOR AN ANGLE POINT DF SAID PHASE 7-A,
7) S 39°33'57" E - 447.40' TO A POINT FOR THE SOUTHEAST CORNER OF SAID PHASE 7-A,
8) S 45°10'44'' W - 131.92' TO A 1/z" DIAMETER REBAR PLACED FOR AN ANGLE POINT OF
SAID PHASE 7-A,
9) S 35°33' 16" W - 129.48' TO A 1/z" DIAMETER REBAR PLACED FOR AN ANGLE POINT OF
SAID PHASE 7-A,
10)' S 62°50'35" W - 105.22' TO A'h" DIAMETER REBAR PLACED FOR AN ANGLE POINT OF
SAID PHASE 7-A,
11) S 72°33'38" W - 201.84' TO A'/i" DIAMETER REBAR PLACED FOR AN ANGLE POINT OF
SAID PHASE 7-A,
12) S 6$°33'57" W - 291.60' TO A lh" DIAMETER REBAR PLACED FOR AN ANGLE POINT OF
SAID PHASE 7-A,
13) S 67°40' 19" W - 186.18' TO A 1/z".DIAMETER REBAR PLACED FOR AN ANGLE POINT OF
SAID PHASE 7-A,
14) S 70°17'58" W - 64.82' TO A '/z" DIAMETER REBAR PLACED FOR AN ANGLE POINT OF
.SAID PHASE 7-A,
15) S 58°39'39" W - 93.29' TO A ~/z" DIAMETER REBAR PLACED FOR AN ANGLE POINT OF
SAID PHASE 7-A,
16) S 50°26'29" W - 150.44' TO A '/z"DIAMETER REBAR PLACED FOR AN ANGLE POINT OF
SAID PHASE:?-A,
17) S 62°14'5.9" W - 98.48' TO A '/z" DIAMETER REBAR PLACED FOR AN ANGLE POINT OF
SAID PHASE.?-A,
18) S 27°58'42" W - 123.33' TO A '/z"DIAMETER REBAR PLACED FOR AN ANGLE POINT OF
SAID PHASE 7-A,
19) ANDS 41°52'34" W - 49.10' TO A '/z" DIAMETER REBAR PLACED IN THE EAST LINE OF
PEBBLE CREEK PARKWAY, SAME BEING THE WEST LINE THE ABOVE MENTIONED
"TRACT 5" RESIDUE,-FOR THE SOUTHWEST CORNER OF SAID PHASE 7-A,
i ~ Y
y~
THENCE N 39°33'57" W - 1170:76' ALONG SAID LINE OF PEBBLE CREEK PARKWAY TO THE
POINT OF BEGINNING.
CALCULATED FROM GRO~TD
SURVEYS PERFORMED ECEMBER, 1998
1
WO# 8803
PLAT D-1237A
8803PH7A-FN-06.DOC
MAP CHK'D BY KRH
3