HomeMy WebLinkAboutOrdinancea a , ~ v ~` ,TA~
~~~ ~
ORDINANCE NO. 2375
AN ORDINANCE REZONING A 42.88 ACRE TRACT OF LAND, THE PROPOSED
PEBBLE CREEK PHASE 7-A, AN ADDITION TO THE .CITY OF COLLEGE STATION,
BRAZOS COUNTY, .TEXAS, LOCATED IN THE S.W. ROBERTSON SURVEY,
ABSTRACT NO. 202, BRAZOS COUNTY ,TEXAS AND BEING OUT OF A RESIDUE OF
A CALLED 677,49 ACRE TRACT DESCRIBED AS "TRACT 5" IN A DEED TO .PEBBLE
CREEK DEVELOPMENT COMPANY RECODED IN VOLUME 1671, PAGE 276 OF THE
BRAZOS COUNTY, OFFICIAL PUBLIC RECORDS,. AND A TRACT DESCRIBED AS
"TRACT 6" IN A DEED. TO PEBBLE CREEK COUNTRY CLUB, INC. RECORDED IN
VOLUME 2303, PAGE 251 OF SAID.: OFFICIAL PUBLIC REC®RDS.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF COLLEGE STATION,
TEXAS:
PART 1: That the City of College Station Zoning Ordinance #1638, more specifically the
Official Zoning Map,: be amended as set out in Exhibits "A", "B", and "C" attached
hereto and made a part of this ordinance for all purposes.
PART 2: That if any provisions of any section of this ordinance shall be held to be void or
unconstitutional, such holding shall in no way effect the validity of the remaining
provisions or sections of this ordinance, which shall remain in full force and effect.
PART 3: That any person, firm or corporation violating any of the provisions of this chapter
shall be deemed guilty of a misdemeanor, .and upon conviction thereof shall be
punishable by a fine of not less than Twenty-five. dollars ($25.00) nor more than Two
Thousand Dollars ($2000.00),
PART 4: A notice of the time and place, where and when said ordinance would` be given a
public hearing and considered for final passage, was published in .The Eagle, a daily
newspaper of general circulation in the Cities of Bryan and College Station, said
publication being on Wednesday, March 10, 1999, the same being at least fifteen (15)
days prior to a public hearing to be held. in the Council Room of the City Hall in
College Station, Texas, at b:00 p.m., on Thursday, March 25, 1999, 'to permit the
public to be heard prior to final consideration of this ordinances
PASSED, ADOPTED and APPROVED this 25th day of March, 1999.
TEST:
Connie Hooks, City Secretary
a ~ Hickson, Mayor Pro Tem
APPROVED:
Harvey Carg' r,, Cit tt y
~,
ORI~Il\iANCE NO, 2375 PAGE 2 OF 6
EXHIBIT "A"
That the Official Zoning Map of the City of College Station, and part of Zoning Ordinance # 163 89
is hereby amended as follows:
The following property is rezoned from A-O Agricultural Open to R-1 Single Family
Residential:
A 42.88 acre tract. of land .:shown gr~hically in Exhibit "B" arrd .described by metes
and bounds in the attached Exhibit "C", the proposed Pebble Creek Phase 7~A, an
addition o the. City of College Station, Brazos County, Texas, located in the S. W
R®bertson Survey, Abstract No. 202, .Brazos County , Texas and being out of a residue
of a called 677 49 acre tract described as "Tract S" in a deed to Pebble Creek
Development Company. rec®rded in Volume 1671, Page 276 of the Brat®s Couratyy
Offacial Public Records, and a tract described as "Tract 6" in a deed to Pebble Creek
Country. Club, Inc. recorded in Volume 2303, Page 251. of said official public records.
ORDINANCE NOe 2375 EXHIBIT "B" PAGE 3 OF 6
~ ,~, ~ v
z
~ ~ ~~` o ® ~
~ d ~ ~ ~ w
odd ~o ~
a~ d ¢ ~~~a
O ~t °~~
0
~.
N ~ .
F
~; I
`!
``~_ 1
I'.
~~i o
~ ~ o Q
i, ~ d
Q 1
-~.
e,~
s ~ Q
s~ ~ x
~~,, R.
~ ' ~ e ?.~
i ~ _: W
I ~ ~ o ..... s- A W
~ _
V ... ... .
nn~~~~ ~
~~- O ~
I sue, ~ L~
~'I ~ O~ ~s ~ ' ~ W
~ em® i
i Q d -~ ~ , °o v °-
i'' ~ ~ N "-
o
q Z
o ~
b
i a
x
L
9
cZ
7 Q
r ~
® ® ~Q
O o~
a O u _..
Q ~ 9z
Q ~~
a ~ ~.
a u
e
~U //
oy
~b
~ ~ '..
~a, ~yl~a
zoa t-o n<.<~w
. i V ~.
ORDINANCE N0. 2375 EXHIBIT '°C"
The
Wallace
Group, (nc.
Engineers ^ Architects ^ Planners ^ Surveyors
Waco ^ Klleen ^ Austin ^ Temple
PEBBLE CREEK, PHASE 7-A .
CITY OF COLLEGE STATION, BRAZOS COUNTY, TEXAS
PAGE 4 OF 6
Gale Arnold. R.PLS.
George Jezek A LA.
Mike Keahey, P.E.. RJ?L.S. °
Jerre E. Lykes. FE.
J.A. °JOke° Povlas. Jr. P.E.
Chris Ruiz P.E.
George E. °Jed' Walker, Jr.. PE.
R.E. °Bob° Wonoce. P.E., R.PI.S.
Otto E. Wiederhoki. PE.
Jodie F. Winkler. P.E.
BEWG A 42.88. ACRE TRACT OF LAND, THE PROPOSED PEBBLE CREEK, PHASE 7-A, AN
ADDITION TO THE CITY OF COLLEGE STATION, BRAZOS COUNTY, TEXAS, LOCATED IN
THE S.W. ROBERTSON SURVEY, ABSTRACT NO. 202, BRAZOS COUNTY, TEXAS AND BEING
OUT OF A RESIDUE OF A CALLED 677.49 ACRE TRACT DESCRIBED AS "TRACT 5' ° IN A
DEED TO PEBBLE CREEK DEVELOPMENT COMPANY RECORDED IN VOLUME 1671, PAGE
276 OF THE BRAZOS COUNTY, OFFICIAL PUBLIC RECORDS, AND A TRACT DESCRIBED AS
'°TRACT SIX'.' IN A DEED TO PEBBLE CREEK COUNTRY CLUB, INC. RECORDED IN VOLUA°tE
2303, PAGE 2~ 1 OF SAID OFFICIAL PUBLIC RECORDS. SAID 42.88 ACRE TRACT BEING MORE
PARTICULARLY SHOWN ON THE ATTACHED PLAT OF WHICH IS MADE A PART HEREOF
AND BEING FURTHER DESCRIBED BY METES AND BOUNDS AS FOLLOWS WITH BEARINGS
BASED ON THE MONUMENTED SOUTH LINE OF BLOCK 29 OF PEBBLE CREEK, PHASE 6,
RECORDED IN VOLUME 2866, PAGE 7 OF SAID OFFICIAL PUBLIC RECORDS SAID LINE
BEARS N 74°32' 18" E - 896.01': ,
BEGINNIlVG AT A POINT ]N THE NORTHEAST LINE OF PEBBLE CREEK PARKWAY, THE
WESTERLY LINE OF THE ABOVE MENTIONED "TRACT ~", MARKING THE NORTHWEST
CORNER OF THE PROPOSED PEBBLE CREEK, PHASE 7-A, FROM WHICH A'/~" DIAMETER
REBAR FOUND AND ADJUSTED MARKING THE NORTHWEST CORNER OF "TRACT 5"
RESIDUE, SAME $EIIeTG A WESTERLY CORNER OF THE ABOVE MENTIONED'°TRACT SIX"
BEARS N 39°33'57" W - 2.28', ALSO FROM WHICH A'/:" DIAMETER REBAR FOUND SET IN
CONCRETE`MARKING THE SOUTHEAST CORNER OFTHE ABOVE MENTIONED BLOCK 29 OF
PEBBLE CREEK,'PHASE 6 BEARS S 47°33'47" W - 1723050`;
THENCE N 50°26'03" E - 65.93' LEAVING SAID LINE OF PEBBLE CREEK PARKWAY, ALONG
THE NORTHERLY LINE OF THE PROPOSED PHASE 7-A, SAME BEING THE PROPOSED
EASTERLY EXTENSION OF ROYAL ADELADE DRIVE (60.00° RIGHT-OF-WAY) TO A POINT
FOR THE POINT OF CURVATURE OF A CURVE TO THE RIGHT;
THENCE AN ARC DISTANCE OF 276.38° CONTINUING ALONG SAID RIGHT-OF-WAY AND A
CURVE TO THE RIGHT HAVING A RADIUS OF 1200,00' AND A CHORD OF N 57°01'56°' E -
275.77' TOA POINT FOR A CORNER OF SAID PHASE 7-A;. j
THENCE N 08°32'54" W - 220.83' LEAVING SAID RIGHT-OF-WAY ALONG A LINE OF
PHASE 7-A TO A r/i' DIAMETER REBAR PLACED FOR A CORNER OF PHASE 7-A;
y
THENCE N 50°27'18" E, AT 18.71' PASSING A ~fi" DIAMETER REBAR FOUND FOR A CORNER
OF SAID "TRACT 5' ° AND "TRACT SIX°°, CONTINUING ALONG A COMMON LINE OF SAID
TRACTS AN ADDITIONAL DISTANCE OF 165.67° PASSING A'/a"DIAMETER REBAR FOUND
FOR A CORNER OF °`TRACT 5" AND "TRACT SIX", CONTINUING FOR A TOTAL DISTANCE
OF 200.53' TO A t/z" DIAMETER REBAR PLACED-FOR A CORNER OF SAID PHASE 7-A;
P. O. Box 22007- Waco, Texas 76702
8225 Central Park Drive° Suite 100 -Waco, Texas 16712
MSA1 777-0777 - (-i~tr f75r11 77F,_')O'>A
__
ORDINANCE N0. 2375 EXHIBIT "C" PAGE 5 OF 6
THENCE S 75°13'44" E - 247.36' TO A'/a°° DIAMETER REBAR PLACED FOR A CORNER OF SAID
PHASE 7-A;
THENCE N 69°43'36" E - 700.96' TO A'.'i°° DIAMETER REBAR PLACED FOR A CORNER OF SAID
PHASE 7-A;
THENCE N 53°14' 19°' E - 98.24.' TO A'/z°° DIAMETER. REBAR PLACED FOR THE MOST
NORTHERLY OR NORTHEAST CORNER OF SAID PHASE 7-A;
THENCE S 43°00'09" E -ALONG THE EASTERLY LINE OF SAID PHASE 7-A, AT 47.35' PASS[NG
A COMMON LINE OF SAID "TRACT 5'° AND "TRACT SIX°', CONTINUING FOR A TOTAL
DISTANCE OF 276.81' TO A POINT ON A CURVE TO THE RIGHT FOR A CORNER OF SAID
PHASE 7-A;
THENCE CONTINUING THROUGH THE INTERIOR OF SAID.'°TRACT 5°° THE FOLLOWING l9
COURSES.
1) AN ARC DISTANCE OF 21.68' ALONG SAID CURVE TO THE RIGHT HAVING A RADIUS.
OF 860.00' AND A CHORD OF S 47°43' 12" W - 21.68' TO A POINT FORA .CORNER OF SAID
PHASE 7-A,
2) S 39°33'57" E - 155.99' TO A POINT FOR A CORI\'ER OF SAID PHASE 7-A,
3) S 50°26'03" W - 10.01' TO A POINT FOR A CORNER OF SAID PHASE 7-A,
4) S 39°33'57" E - 160.09' TO A POINT FOR A CORI`TER OF SAID PHASE 7-A,
5) N 51°35'03" E o 21.77' TOA POINT FOR A CORNER OF SAID PHASE 7-A;
6) S 38°24'57" E- 50:00' TO A POINT FOR AN ANGLE POINT OF SAID PHASE 7~A,
7) S 39°33'57" E - 447.40' TO A POINT FOR THE SOUTHEAST CORNER OF SAID PHASE 7-A,
8) S 45°10'44" W - 131.92' TO A'/:'° DIAMETER REBAR PLACED FOR AN ANGLE POINT OF
SAID PHASE 7-A, '
9) S 35°33' 16" W - .129.48' TO A Yi°° DIAMETER REBAR PLACED FOR AN ANGLE POINT OF
SAID PHASE 7-A,
10)' S 62°50'35" W -105.22' TO A'/s ° DIAMETER REBAR PLACED FOR AN ANGLE POINT OF
SAID PHASE 7-A,
1 l) S 72°33'38" W - 207.84' TO A'/z°° DIAMETER REBAR PLACED FOR AN AI~IGLE POINT OF
SAID PHASE 7-A,
12) S 68°33'57" W - 291.60' TO A I/z°° DIAMETER REBAR PLACED FOR AN ANGLE POINT OF
SAID PHASE 7-A,
13) S 67°40' 19" W - 186.18' TO A '/a°° DIAMETER REBAR PLACED FOR AN ANGLE POINT OF
SAID PHASE 7-A,
14) S 70°17'58" W -64.82' TO A '/z'° DIAMETER REBAR PLACED FOR AN ANGLE POINT OF
SAID PHASE 7-A,
15) S 58°39'39" W - 93:29' TO A '/z°° DIAMETER REBAR PLACED FOR AN ANGLE POINT OF
SAID PHASE 7-A,
16) S 50°26'29" W - 150.44' TO A '/z°° DIAMETER REBAR PLACED FOR AN ANGLE POINT OF
SAID PHASE 7-A,
17) S 62°14'59" W - 98.48' TO A '/z°' DIAMETER REBAR PLACED FOR AN T-NGLE POINT OF
SAID PHASE 7-A,
18) S 27°58'42" W - 123.33' TO A `/z°' DIAMETER REBAR PLACED FOR AN ANGLE POINT OF
SAID PHASE 7-A,
19) ANDS 41°52'34" W - 49.10' TO A '/i' DIAMETER REBAR PLACED IN TEIE EAST LINE OF
PEBBLE CREEK PARKWAY, SAME BEING THE WEST LINE THE ABOVE MENTIONED
"TRACT 5" RESIDUE, FOR THE SOUTHWEST CORNER OF SAID PHASE 7-A,
• ORDINANCE N0. 2375 EXHLBIT ''C"
PAGE 6 OF 6
THENCE N 39°33'57" W - 1 170.76° ALONG SAID LINE OF PEBBLE CREEK PARKWAY TO THE
POINT OF BEGINNING.
CALCULATED FROM GRO D
SURVEYS PERFORMED j~I~ECEMBER, 1998
,~~ ®E ,°~
,~P.•G~STE;Q
G~A,LE AFtNOLO
-9 ~'b~sst~`'~``®Q-
~~ Sd1R°~~
GALE ARNOL,D R.P.L.S, NO. 3879
i
WO# 8803
PLAT D®1237A
8803PH7A-FN-06.D®C
MAP C1~iK'D BY KRH
3