HomeMy WebLinkAboutMiscellaneous12/09/98 17:18 ^0409 764 3496 DEVELOPMENT SVCS I~001
x~:~:x:~x:x:~x~x::~xc~x~~:x~;~~::x~::x*x:~x::x~
~~~ ACTIVITY REPORT :x~x:~
~~~:~k~kxesk~k~kx::kx;:x%k~k:ksk~x:~~:%~m~kN:x:x:
TRANSMISSION OK
TX/RX N0. 5859
CONNECTION TEL 9P6906081
CONNECTION ID
START TIME 12/09 17:17
USAGE. TIME O1'22
PAGES 5
RESULT OK
City-of College Station I IO I South Texas Avenue P.O. Box 9960 College Station, Texas 77842
CITY OF COLLEGE STATION
~i
DEVELOPMENT SERVICES
1
Ta: G~~~
Phone:
Fax phone:
CC:
Date: ~~ / ~ / ~~ _ ..
Number of pages including cover sheet:
From:
1
Phone: 409-764-3570
Fax phone: 409-764-3496
REMARE{$: ^ Urgent ^ For.. your review ^ Reply ASAP ^ Please comment.
~~GLlit~ G~ /~C~i
i'/~Ki ~ 2/ R. .~~2G~. -
~ / I
If you did not receive a complete fax, please call our office im mediately for a new transmittal
HOW TO:
DEVELOPMENT WITH A PIPP
^ Applicant submits four (4) sets of facility layout plan and application to Development
Coordinator.
^ Development Coordinatorxoutes:
^ 1 set to Building' for review.
® 1 set to Planning/Engineering Plans Check Room for review.
^ 1 set to Planning File.
^ 1 set to Applicant
^ Development Coordinator notifies reviewers that plans for a PIPP are in Plans Check
Room for review.
^ Building Checks signs, structures, electrical, irrigation (building signatures constitutes
:Building Permit issuance for all Building Permit related items). (PIP constitutes sign
permit, electrical permit, wiring permit).
^ Engineering checks for drainage items, erosion control, infrastructure conflicts
(Engineering signature constitutes Development Permit,issuance and ordinance
compliance).
^ Planning Checks for completeness of plan and ordinance compliance.
^ Reviews comments returned.
^ Comments addressed, final plans approved and fees .paid for building fees.
IF FIItST SUBMITTAL PLANS ARE INCOMPLETE, THE. SUBSEQUENT
SUBMTTAL WH.L BE CONSIDERED ANOTHER FIRST SUBMITTAL.
o:~~p~~~®~~~~~~~~~b~
`Shirfe Volk- PIPP a lication Pebble Creek Page..1_.
y PP
From: Shirley Volk
To: Deborah Grace,. Natalie Ruiz, Sabine McCully
Subject: PIPP application -Pebble Creek
~' I called. that Bobby Mauldon yesterday and explained that his,application was still incomplete and we are
unable #o do a complete review. I faxed him an application and the checklist so he will know (again)
what he's supposed to submit #or review. This is the 2nd call'I've made to him about an incomplete
submittal. Jeff and Lance looked at the application and neither were able to review it.
i