Loading...
HomeMy WebLinkAboutMiscellaneous 02i10i98 12:12 ^C 4098468224 ARK 1 TEX STUD I O -~~~ DEVELOPMENT SVGS [~j 001 ~• FAX TRANSMISSION COVER SHEET TO: Natalie Ruiz (764-3570.} COMPANY: CS Development Services FROM: Pete Schmid (260-2635} DATE: 10 Feb 98 TIME: 12:00 pm FAX NUMBER: 764-3496 ~ti•L»LL sla """ley ~"e Ea51 NUMBER OF PAGES TO FOLLOW: 3 g~,e~ College Sutlon, Tercet TJ840 Vo1ce 409/260.2635 Fax609/6168224 If you do not receive all indicated pages, please call immediately. THE ARKITEX STUDIO, INC. 511 University Drive East, Suite 201 College- Station, Texas 77840 voice - 409-260-2635 fax - 409-846-8224 FAX OPERATOR: NOTES: Natalie, Additional calculations of developed, protected, etc. areas for CableTime. Also I've included the letter I referenced concerning the 20' buffer zone. Concerning placement of the sign, I find no reference to the distance to the street and whether we can build the sign in the LAUE/BS and/or buffer zone. It doesn't make sense that the sign would be required behind the buffer zone, because it would. be 60' off. the street and not much good to anyone. Therefore, we're proceeding under the assumption that the location will conform the the CS Zoning Ordinance info on sign placement. The sign design etc. will be in accordance with the Business Center Covenants & Restrictions. Do you have the master plan for the business center in your office, (or Elrey's)? We need to look at it for the intended placement of walks etc. in this area. Thanks. 02i10i98 12:12 ^ty4098468224 r Site Area Calculations CabieTime Operational Facility College Station, Texas ARKITEX STUDIO -~-~~ DEVELOPMENT SVCS 0]002 10 FEB 9$ 1. Total Site Area: 4.000 Acres 174,234.89 SF 2. Buildable Area: 2.552 Acres 11,159.2$ SF 3. Area Bounded by LAUE: 3.223 Acres 140,411.70 SF 4. Area of LALTE: 0.777 Acres 33,823.19 SF 5 . Built-Out Area: (Within "Buildable Area") Phase One: • Building 0.523 Acres 22,800 SF • Parking/Walks 1 0.286 Acres 12,451 SF • Parking/Walks 2 0.772 Acres 33,632 SF TOTAL (Phase One): 1.581 Acres 68,882 SF Phase Two: • Building 0.689 Acres 30,000 SF ParkinglWalks 1 0.286 Acres 12,451 SF • Parking(Walks 2 0.829 Acres 36,049 SF TOTAL {Phase'Itwa): 1.804 Acres 78,500 SF 6 . Protected Area: Required Minimum = 0.15(4.000-0.777} 15% x (Total - LAUEBS} = 4.483 Acres Actual = 4.000- 0.671>0.483 ok Worst Case - TotaI - (Developed Area + (2.552+0.777) developable area = LAUEBS) = 0.671 Acres developed area Phase One:. 4.000- 1.024>0.483 ok Phase One: (2.199+0.777) Developed area = = 1.024 Acres Built-Out Area + 20' = 2.199 Acres Phase Two: 4.000- 0.805>0.483 ak Phase Two: (2.418+0.777) Developed area = = 0.$05 Acres Built-Out Area + 20' = 2.418 Acres 02/10/98 12:13 d 4098468224 ARK [ TEX STUD t O ~~-~ DEVELOPMENT SVCS C~ 003 Arkitex Studio 10 FEB 9$ 9742 - CableTime 7. Parking Analysis: Phase One (22,800 SF) • Office -1 /250 sf 21,000/250 = 84 • Warehouse - 1 /3000 sf 1800/3000 = 1 Total Req'd. (Phase One): S 5 Total Provided: 94 Phase. Two (30,000 SF) (7,200 SF Addition} • Office (60%) + 4400/250 = i8 {96 Total) • Warehouse + 2800/3000 = 1 Add'1.(40%) (2 Total) Total Req'd. (Phase Two}: 85 + 19 = 104 Total Provided: 104 02i10i98 12:13 ^tl 4098468224 ARKITEX STUDIO ~~-~ DEVELOPMENT SVCS 1~j004 COLLEGE STATION P. O, Box 9960 1101 Texas Avenue College Station, TX 77842 . Tel: 409 7fi4 3500 Charlie Burris, AIA January 1 b, 1998 Arldtex Studio 51 I University Drive East Suite 201 College Station, TX 77840 Re: Questions regarding preliminary site plans for Cabletime Dear Mr. Bums, The Business Center Advisory Board met on Wednesday January 14th to discuss the questions that were raised at a development staff meeting with your firm on Monday, January 12th regarding the preliminary site plan for Cabletime, The Board felt that the intent of the covenants was adherence to the 20 foot "buffer zone" defined in Section 12.20 along all street frontages. The Board felt that improvements to the site including all those elements listed in Section 12.20 should not encroach the. building setbacks as imposed by the Zoning Ordinance along the rear or side lines of the property. This correspondence will serve as a granting of variance with respect to the matters referenced above. Sinc~r ly, ~- Elrey Ash . Director of Economic and Community Development cc: George. K. Noe, City Manager Jim Callaway, Director of Development Services Home of Texas A&M University >a t •' ~•~ . :.. a`. ~ • ~ .: f~~ ~;;~'.: .. k. •[. :.: - ~ ~~ I~ `I I`~~;I n ~~ I .;~: 02i09i98 12:08 d 4098468224 ARKITEX STUDIO ~-~~ DEVELOPMENT SVCS ~ 004 _F P i L i uau ~ ~'~--- t a r I i I ~ ;v:i' t;,isii.•::;:?C?'1~?''.:1i~:!v;•,•i})T_p~~~~~:i~:<%c~.%%t<?C';t'~ti~: I _ _ ~lyi // ' 1 I I ~'~' I ~, ~. I I ,1 I~ ~:~ $~~ wpm X14 ~~a t I 1 i oc ! I I 1' 1 A I N I S ~.. V O } ~;ro.s ) J 9~~a I fit.. o ~ 4 o ~~J i I ~' I ~~~ ~.A~I~ __ _ _ - -__ SUBMIT APPLICATION AND THIS LIST CHECKED-OFF WITH 16 FOLDED COPIES OF SITE PLAN FOR REVIEW COLLEGE STATION BUSINESS CENTER MIINIMUM REQUIREMENTS FOR SITE PLAN PROPOSALS (ALL CITY ORDINANCES MUST BE MET) INCLUDING $UT NOT LIlVIITED TO THE FOLLOWINGS 1. Sheet size - 24".x'36" Ct3"`~ 2. Tj~le block to include: a. Name, address, location, and legal. description Name, address, and telephone number of applicant ~~Name, address, and telephone number of developer/owner. ~~ Name, address, <and telephone number of architect/engineer ~/"ey :Date of submittal /f.) Total site area 0~3. Ownership and current zoning of parcel and all abutting parcels. ~~ 4. A key map (not necessarily to scale). Scale should be largest. standard engineering scale possible. on sheet. Provide a north arrow. 7, Topography, final grading plan, and other pertinent drainage information. (If plan has too J much information, show drainage on separate sheet.) G7 8. All existing. streets, drives, buildings, and water courses on or adjacent to the proposed .project site. [?3" 9. Locate 100 yre floodplain on or adjacent to the proposed project site, note if there is none on the site.. C'J 10. Location and size of existing utilities within or adjacent to the proposed project site. tg 11. Pr~op~ed location, type, and size. of the following: ~/a.~ ..Buildings and structures ~) Off-Street parking areas with parking spaces drawn, tabulated, and dimensioned ~.) Sidewalks AlAd.) Common open space sites Sites for solid waste containers _r , __ _. _ ___ __ __ The following are the standards for Plan- Development established by Business Center C~ov~e ants and Restrictions, Ordinance, or Policy. 4T l . Buildin se aration is a minimum of 15 feet. Minimum Lot :Area shall be one acre except as p ovided on Page 8 of the Covenants and Restrictions. Minimum Front Lot width at property line shall be one hundred feet except as provided on Page 8 of the ~„ -Covenants and Restrictions. Lp` 2. Building etbacks are as follows: '! Minimum Front Building Setback from street R.O.W. as shown on final plat; Minimum Side and Rear. Building Setback shall be as required in the Zoning Ordinance for the proposed use of the site/lot. j~Pazking lots and the associated 20' buffer zone as defined in Section 12.20 of the Covenant and Restrictions aze prohibited within the Building. Setback with the exceptions of lots which have building setbacks in excess of 40 feet. Granting or permissionto encroach into these setbacks that are greater than 40 feet shall be at the discretion of the Board. ~ 3. Minimum pazking space is 9' X 20', or on a perimeter row, 9' x 18' with a 2' overhang. l~" 4.'~Minimum drive width is 23' with head-in pazking or 20' without pazking. ~' S. Raised landscaped islands, (6" raised curb) of a minimum of 180. sq. ft. are located at both ends of every parking row. Additionally, 180 sq. ft. of landscaping for every l5 interior parking spaces must be provided. 6. Streetscape" compliance is required which involves special plantings along streets specified in the City's Streetscape Plan. A 6" raised curb is required around all edges of all parts of all paved areas without exception. (To include islands, planting areas, access ways, dumpster locations, utility pads,. etc.) Curb detail to be approved by City Bngineer. No exceptions 'will be made for areas designated as "reserved for future parking". Wheelstops may be required on' interior rows longer than 10 spaces or in special situations... Q 9. Sidewalks are required at time of development if property has frontage on a street shown on the sidewalk Master Plan :or if the Project Review Committee determines the necessity. (Refer to Section 10.2 of the Zoning Ordinance and Section 12.70 of Covenant and Restrictions). ®" 10. Service, loading, and delivery areas shall not be visible o~n .public streets, private drives, public and/or visitor pazking lots, walks, and. the common open space. Visual screening is` required. See Page 12, Sections 12.83 and 12.84 of the Covenants and Restrictions. 11. Healthy, native-trees over 6" in .caliper should be retained whenever possible. Ali new canopy trees shall be a minimum of 2.75" caliper.. All new non-canopy trees shall be a minimum of '1.5" caliper. See Section 1 L.3 of Ordinance #1638 for recommended species. 12. Proposed streets, drives, and curb cuts. For each proposed curb cut (including driveways, streets, alleys, etc.) locate existing curb cuts on the same and opposite side of the street to determine separation distances between existing and proposed curb cuts. Indicate driveway throat length as measured in the Driveway Ordinance. (See Ordinance 1961 for driveway location and design requirements.) L~]" 13. Landscape plan as required in Section 11 of the Zoning .Ordinance (See Ordinance # 1638.) The landscaping plan can be shown on a separate sheet if too much information is on the original site plan. Attempt to reduce or eliminate plantings in easements. Include information on the plan such as: fisting landscaping to rem ' ~ ~ required. point calculations ~~~u~ ~roposed new plantings. with points earned La" 14. The gross square. footage of buildings and the proposed. use of each building. Qd" 15. Desi ate number of arkin s aces re aired b ordinance and rovided b r ~ p g P q Y P Y P oposal. f~6. Show dimensions to size and locate all structures, pazking spaces, drives, curb cuts, .parking islands, and setbacks. ~7. Are there impact fees associated with this development? ^ 18. Provide a water and sanitary sewer legend to include water demands ' (minunum, maximum and average demands in gallons per minute) and sewer loadings (maximum demands in gallons per day). ^ 19. Show all meter locations and note their sizes. ^ 20. All plans approved prior to issuance of b~.ulding permit to included but not limited to: - Landscape Plan for developed az lu ' irrigation plan and all point calculations- "? - Plan showin are trees ey s g size an species; - Streetscape plan for landscaping. Landscape design shall be in general conformance with landscape concept as shown on the Master Plan and the Master Landscape Plan (see Sections 12.40-12.50 of Covenant and Restrictions). v ^~~12. Fire lanes of a minimum. of 20 feet in width with a minimum height clearance of 14 feet must be established if any structure of any type is more than 150 feet from a public street or highway. C~13o Any structure in any zoning district other than R-1, R-lA, or R-2 must be within 300 feet of a fire hydrant as measured along a public street or highway. ^ 14. Fire hydrants. must be located on the .same side of a major street as a project, and shall be in a location approved by the City Engineer. ^ 15. Fire .hydrants :must be operable .and accepted by the City and drives must have an all weather urface before a building permit cari be issued. ^ 16. All plans must include irrigation systems for landscaping. Irrigation meters are separate from the :regular water systems for buildings and must be sized accordingly and. include backflow prevention protection. ^ 17. All parking facilities, service anddelivery areas,. and refuse facilities shall be screened from view as indicated (see Sections 12.80, 12.81, 12.82, 12.83, and 12.84: for screening ,~. methodology). C3' 18. See Section 13.20. and 13.30 for Parking Spaces Required. ... ............ ...... .......... .... - _... - - ... -........ ...... - ....................- -- .......... .:: ::::.:1: Shirle Volk - Re: CableTime -.- ~~~~~~•~~> Y ..................................:.....:.:::.~:::.~:::.:::.:::::::::::::::::---.~.~:.~._:::.:~.~:::::::::::::::::::::::::::::::::::::.:~::::::::::::::::::.~.~:::::::.::::::::::::::::::::::::.::~:._.:_._:.:~::::::::::::::::::.:_:::::::::.:_::::::::::.~._:::::::::::::. From: Veronica Morgan To: SVOLK cLDCITY OF COLLEGE STATION.CITY HALL Date: 3/16/98 7;20PM Subject: Re: CableTime well, i guess i interpreted your "Paul & V, feel free to offer your input on this, too." as a question. v »> Shirley Volk 03/16/98 04:55PM »> Hey V, did I ask a question about this??? I slept since i did, if I did!!! »> Veronica Morgan 03/16/98 12:44PM »> i would suggest that natalie tell him that for a concept review (i take it this means not a full site plan review.....) we need to know "conceptually" what they are doing with their stormwater... are they detaining/not detaining/ is there a spot left #or it on the site plan/ will it be in their parking lot/ they have to have given it some thought and know what their initial plan is to deal with it. i dont care if it is shown on the plan or written in a brief letter at this point. when the site plan comes in for review is when they will need to have all the drainage calculations/etc. done..... hope that helps. v »> Shirley Volk 03/13/98 04:23PM »> Just had a call from Mike at the Arki-tex Studio about the plan submitted for the "concept design review" of this project, He asked if the reference to "site plan information such as....drainage..."means just arrows or a more complete grading and drainage plan.. I don't know the answer, so I haven't replied yet. I've sent this to Nat because she will be the project manager on this one! Paul & V, feel free to offer your input on this, too. It's difficult forme to know what the creators of this document had in mind when the requirements were written, so maybe we can get clarification as we go along with each project! Thanks. TI0 -E ESTA N CO P. O. Box 9960 1101 Texas Avenue College Station, TX 77842 Tel: 409 764 3500. MEMORANDUM TO: Mike Record, The Arkitex Studio FROM: Natalie Ruiz, Assistant Development Coord' o '~ DATE: April S, 1998 RE: Cabletime development in the Business Center at College Station... Attached is a redlined copy. of the concept design review plan -for the new Cabletime building. There was enough. information provided, that staff was able to do a complete site plan review. The Business Center Board also reviewed-ahe site plan and approved it with ahe redlined staff comments and with the condition that the following items be submitted for further review and approval by the Board: -- Sign details for the proposed freestanding sign and any attached signage to the building. -- Exterior colors and textures of the building. The Board has given staff the authority to review the remaining items .listed in Section 4.50 of the Final Design Review requirements. Please submit 4 copies of the revised site development plan along with the two items mentioned above for final site plan approval. (If .the construction documents are ready, you may choose to,submit 4 sets of complete construction documents with the revised site plans attached for review.) Also, return the attached redlines with the revised plans so that staff can compare the two. If there is an item on the redlined drawings that you are not able to address, .submit a letter explaining the details. If you have any questions or need additional information, please call me at 764-3570. Thank you Attachment Home of Texas A&M University Q% ~._w_m~._. L.~.V ,~~.._... _.._.... W,...r ,~, ~..,. `~ m.e.e. v_E.. _._.~ _._~ ._ ,. . Rage: ~.:: Shirley Volk - Re Cabletime..- : - :., ...::.....: ... :.....::::...::.::-----.::.::...:.:::...:::;::::....:....... From: Mark Smith To: Brett McCully, Paul Kaspar, Veronica Morgan Date: 7/10/98 10:42AM Subject: Re: Cabletime not OK with me. the plans must first be prepared and sealed by a PE according to the law. »> Shirley Volk 07/10/98 09:47AM »> Steve Rians of SAFE pointed out to me yesterday that he did not get engineer's approved documents for the water line for the fire sprinkler system at Cabletime. They are in rather a hurry to get this done and want to begin on it next week. He has offered to get sealed "as built" construction does after he installs it hat do ou sa ? We knew that the were going to install a fire hydrant on an if that s o.k. with you all. W y y Y existing line; but we didn't need constr. does for that. I'm not at all sure how this is supposed to work, and neither is the building division, so I'm asking you! When do these construction does usually come in, and who checks them? I know the actual fire sprinkler plans come in to the building division and are checked there, but what about the water line plans? CC: Jirn Callaway, Lance Simms, Natalie Ruiz, Shirle... ° ` i l ~ 6 I .:,.., . :. 1 Shirley Volk....Re Cabletime _ _:::. :_ .:.:.:::._: :::::.........:.:::.:...: .: :::..<. .:.:..:::...:::::::: :...:... :......:.::.:.::.:.::.....::: Page:::. From: Shirley Volk To: MSMITH cLDCITY OF COLLEGE STATION.POLICE DEPARTMENT Subject: Re: Cabletime Thanks, Mark. That's what I needed to know to be able to give Steve a definite answer. Steve Rians is out of the office today,. but J talked with the engineer in the office -read him your reply and told him we will not be able to let him do the work until we get those plans into review and approve. »> Mark Smith 07/10/98 10:42AM »> not OK with me. the plans must first be prepared and sealed by a PE according to the law. i »> Shirley Volk 07/10/98 09:47AM »> ~', Steve Rians of SAFE pointed out to me yesterday that he did not get engineer's approved documents for the water line for the fire sprinkler system at Cabletime. They are in rather a hurry to get this done and want to begin on it next week. He has offered to get sealed "as built" construction does after he installs it if that's o.k. with you. all. What do you say? We -knew that they were going to install a fire hydrant on an existing line, but we didn't need: constr. does forthat. I'm not. at all sure how this is supposed to work, and neither is the building division, so I'm asking youl When do these construction does usually come in, and who checks them? I know the actual fire sprinkler plans come in to the building division and are ' checked there, but what about the water line.plans? i ~~F ~'°°- , . v STATIOI~1 LLEGE co P. O. Box 9860 1101 Texas Avenue College Station, TX 77842 TeI: 409 764 3500 MEM®RANDUM TO: Matt Klunkert, Klunkert Construction Via fax (409) 774-4361 .; FROIvI: Natalie Ruiz, Assistant Development Coordin for _ DATE: June 11, 1998 ~~.~ RE: Building. permit issuance of the Cable Time building in the CS Business Center. Attached is a building permit application that needs to be completed and submitted before the building. permit can be issued. I've also put together the following list of items and/or fees that must also be taken care of prior to permit issuance: Water and sewer tap fees in the amount of $2650 2" Domestic Water Tap - $1500 1 1/2" Irrigation Water Tap - $800 4" Sanitary Sewer Tap - $350 Temporary electrical pole fee in the amount of $45. Completed application for Building Permit (see attached). Building permit fees in the amount of $4,460. Erosion control plan to be reviewed .and approved by staff. _ Development permit & inspection fees in the. am®unt of $400. We have the completed application signed by your civil engineer. Staff will issue the development permit once the erosion control plan is approved and the fees .are paid. ease '~v~ -~.e5~ ~~e,s 1t ~ ~ r~ ~.Y~`l"a ` G"''~~ ~ Home of Texas A&M University < 1 b . F Memo to Matt Klunkert Cabletime Building Permit June 11, 1998 Page 2 of 2 For your information, there are two items that still need to be approved by the CS Business Center Review Boazd: (1) the sign. details for the proposed freestanding sign and any attached signage to the building; and, (2) exterior colors and textures of the building. These items will not hold up the issuance of a building permit; however, they need to be reviewed and approved as soon as .possible. There is a note on the building plans pertaining. to these two items. Please note that combustible materials aze not allowed on site until the fire lanes are in and the fire hydrant is installed and accepted by the City. Coordinate details of this requirement with Building Official Lance Simms at (409) 764-3741. All of the fees listed above may be paid at one location with one check for your convenience. If you have any questions about the issuance of the building permit or any future permits, please contact me at (409) 764-3570 or a-mail me at "nruiz@ci.college-station.tx.us". I look forward to working with you on this project. Attachment cc: Case file #98-408 Mike Record, The Arkitex Studio, via fax (409) 846-8224 Building Official Lance Simms ~, ~°~-~''° COLLEGE STATION P. O. Box 9960 1101 Texas Avenue College Station, TX 77842 Tel: 409 764 3500 MEMQRANDUM T®: Matt Klunkert, Klunkert Construction Via fax (409) 774-4361 ~!- FROM: Natalie Ruiz, Assistant Development Coordinator ~ ~ >' ~~ DATE: June 11, 1998 RE: Building permit issuance of the Cable Time building in the CS Business Center. Attached is a building permit application that needs to be completed and submitted before the building permit can be issued. I've also put together the following list of items and/or fees that must also betaken care of prior to permit issuance: Water and sewer tap fees in the amount of $2650 2" Domestic Water Tap - $1500 1 l/2" Irrigation Water Tap - $800 4" Sanitary Sewer Tap - $350 Temporary electrical pole fee in the amount of $45. Completed application for Building Permit (see attached). Building permit fees in the amount of $4,460. Erosion control plan to be reviewed and approved by staff. _ Development permit & inspection fees in the amount of $400. We have the completed application signed by your civil engineer. Staff will issue the development permit once the erosion control plan is approved and the fees are paid. Home of Texas A&M University w r Memo to Matt Klunkert Cabletime Building Permit June 11, .1998 Page 2 of 2 For your information, there are two items that still need to be approved by the CS Business Center Review Board: (1) the sign details for the proposed freestanding sign and any attached signage to the building; and, (2) exterior colors and textures of the building. These items will not hold up the issuance of a building permit; however, they need to be reviewed and approved as soon as possible. There is a note on the building plans pertaining to these two items. Please note that combustible materials are not allowed on site until the fire lanes are in and the fire hydrant is installed and accepted by the City. Coordinate details of this requirement with Building Official Lance Simms. at (409) 764-3741. All of the fees listed above may be paid at one location with one check for your convenience. If you have any questions .about the issuance of the building permit or any future permits, please contact me at (409) 764-3570 or a-mail me at "nruiz@ci.college-station.tx.us". I look forward to working with you on this project. Attachment cc: Case file #98-408 Mike Record, The Arkitex Studio, via fax (409) 846-8224 Building Official Lance Simms COLLEGE STATION Charlie Burris, AIA Arkitex Studio S 11 University Drive East Suite 201 College Station, TX 77840 January 16, 1998 Re: Questions regarding preliminary site plans for Cabletime Dear Mr. Burris, College Station, TX 77842 The Business Center Advisory Board .met on Wednesday January 14th to discuss the questions that were raised at a development: staff meeting with your firm on Monday, January 12th regarding the preliminary site plan for Cabletime. The Board felt that the intent of the covenants was adherence to the 20 foot "buffer zone" defined in Section 12.20 along all street frontages. The Board felt that improvements to the site including all those elements listed in Section 12.20 should not encroach the building setbacks as imposed by the Zoning Ordinance along the rear or side lines of the property. This correspondence will serve as a granting of variance with respect to the matters referenced above. Sincpr ly, Elrey Ash Director of Economic and Community Development cc: George K. Noe, City Manager Tim Callaway, Director of Development Services. P. O. Box 9960 1101 Texas Avenue Tel: 409 764 3500 Home of Texas A&M University STAFF REVIEW C{?MMENTS No. 1 Project: Cabletime Expansion Site Plan 1. Footprint of proposed building differs from the expansion plan that was originally approved. This change. will require approval. of the Business Center Board. 2. A note will need to be added to the plan stating that the colors and materials of the new building will. match existing. Anything different would need to be approved by the Board. 3. Will there be any exterior light fixtures? Reviewed by: Jessica Jimmerson Date: 12/14/1999 l\CHl NETWARE\VOL1lGROUPIDEVE SERUESIcabletime98-408.doc