HomeMy WebLinkAboutMiscellaneousJAlk R r r 'r 1 (3) 1 RII r":j
CONSULTING ENGINEERING & LAND SURVEYING
4444 CARTER CREEK PKWY, SUITE 908 BRYAN, TEXAS 77802 (409) 846-2688 (409) 846-3094
Ms. Shirley Volk
City of College Station
College Station, Texas
Dear Ms. Volk:
On behalf of my clients, Frank Thurman & Jerry Windham, I request that the
Master Plan of Pebble Hills and the Preliminary Plat of Pebble Hills, Phase III
be pulled from the P&Z commission agenda of August 20, 1998 and be placed
on the September 3, 1998 P&Z agenda.
Thank you for this consideration.
Sincerely, j
' LG
Donald D. Garrett
10/23/97 12:13 X2409 764 3496
't
_7
DEVELOPMENT SVCS 444 GARRETT 10002/005
P&Z Case No.
Date Received
APPLICATION FOR REVIEW AND APPROVAL
FINAL PLAT
***SUBMISSION OF THIS APPLICATION IS NOT COMPLETE UNTIL
PLATTING FEES ARE `PAID AND ALL REQUIREMENTS OF CHAPTER 9 OF
THE CODE OF ORDINANCES (ORDINANCE #690) HAVE BEEN MET.***
MINIMUM REQUIREMENTS:
1 Filing Fee of $200.00
2. Application completed in .11)
3. Film positive plus 4**en-(tt6 folded copies of plat.
4 Paid' tax certificates from City of College Station, Brazos Councy and the
College Station Independent School District.
5. A statement addressing any differences between the final plat and
approved Master Preliminary Plat and Plan if applicable.
PLEASE NOTE THAT THE PLAT CANNOT BE SCHEDULED FOR PLANNING
AND ZONING COMMISSION MEETING UNTIL ALL OF THE ABOVE
REQUIREMENTS HAVE BEEN MET.
DEADLINE: Received in the Planning Division 22 days prior to a Planning & Zoning
Commission meeting if identical preliminary plat. Regular meetings are held the first and
third Thursday of each month. Contact Development Coordinator, Shirley Volk at (409)
764-3570 for details.
***fee subject to change without notice***
0:ifbnnstp1an\FNLAPP. UOC
Shirley Volk - Re: TxDOT Page ..1
From: Jane Kee
To: DCHARANZA@City of College Station.City Hall, DGRA...
Date: 6/10/98 1:10PM
Subject: Re: TxDOT
Scott and 1 talked about the ROW. I don't think we can ask for more than what our t-fare plan shows.
That's all Ed and I talked to them about when we met before. If we talk again and think we need more
we can present this to P&Z and CC and talk about how we help pay for it.
Shirley Volk 06/09/98 05:26PM
Paul is going to be checking on what "to & thru the property" means regarding the water line on this
specific tract of land. Is across the SH6 frontage enough or because platting out this property will land
lock the property behind it and perhaps it needs to go not only across the frontage, but also along the
southern property line back to the parent tract which will be left.
Scott is going to be checking on the required width of the r.o.w. for both the north/south and the east/West
collectors in this area. The previously approved master plan has expired (I think), and the developer is
required to bring in a revised plan since he's making some changes in the layout of the thoroughfares, so
Scott is wondering if we can increase the size r.o.w. with this revised plan.
Paul will also be required a utility layout master plan with the revised master plan because he needs to
see flow the utilities will be addressed once that piece fronting on SH6 is sold off.
We have agreed in this meeting that if the revised master plan comes in with enough detail on the
TxDOT piece of land, it might (and probably)_ will be o.k. to go straight to Final Plat on the TxDOT lot
instead of requiring the revised master plan, then a, preliminary plat and then the final plat. I think this
will be o. k. if we get all the infrastructure info we need for the remaining residential development, since
this is only going to be one big lot (with a street running along the southern proeprty line).
I
Shirley Volk Re TxDOT Page
From: Edwin Hard
To: DCHARANZA@City of College Station.City Hall, DGRA...
Date: 6/16/98 11:08AM
Subject: Re: TxDOT
It has always been the case that the north-south "major collector" running 1 believe just east of this tract
was 70'. All property owners/developers were made aware of this when we met to determine its exact
ali nment.
Shirley Volk 06/09/98 05:26PM
7 Paul is going to be checking on what "to & thru the property" means regarding the water line on this
specific tract of land. Is across the SH6 frontage enough or because platting out this property will land
h lock the property behind it and perhaps it needs to go not only across the frontage, but also along the
y'~J~1 f southern property line back to the parent tract which will be left.
9 a Il Scott is going to be checking on the required width of the r.o.w. for both the north/south and the east/west
collectors in this area. The previously approved master plan has expired (I think), and the developer is
required to bring in a revised plan since he's making some changes in the layout of the thoroughfares, so
Scott is wondering if we can increase the size r.o.w. with this revised plan.
Paul will also be required a utility layout master plan with the revised master plan because he needs to
see how the utilities will be addressed once that piece fronting on SH6 is sold off.
We have agreed in this meeting that if the revised master plan comes in with enough detail on the
TxDOT piece of land, it might (and probably) will be o.k. to go straight to Final Plat on the TxDOT lot
instead of requiring the revised master plan, then a preliminary plat and then the final plat. I think this
will be o.k. if we get all the infrastructure info we need for the remaining residential development, since
this is only going to be one big lot (with 'a street running along the southern proeprty line).
I
i
I
I
u1TY OF COLLEGE STATION
CUSTOMER RECEIPT
OPER: MRODGERS CT DRAWER: 1
DATE: 6/24/98 00 RECEIPT: 9916415
DESCRIPTION QTY AMOUNT TP TM
FILING FEE/DS/BI $290.00 B7 CK
MASTER PRELIMINARY PLAN
GARRETT ENGINEERING
MASTER PRELIMINARY PLAN
PEBBLE HILLS PHASE 3
CK. 16473
LH
TIME: 12:08:53
TOTAL PERSONAL CHECK $208.09
AMOUNT TENDERED $200.80
THANK YOU
CONSULTING ENGINEERING & LAND SURVEYING
4444 CARTER CREEK PKWY, SUITE 108 BRYAN, TEXAS 77802 1409) 846-2688 (409) 846-3094
September 1, 1998
Ms. Shirley Volk
City of College Station
College Station, Texas
Dear Ms, Volk:
On behalf of my clients, Frank Thurman & Jerry Windham, I request that the Master Plan of Pebble Hills
and the Preliminary Plat of Pebble Hills, Phase III be pulled from the P&Z Commission Agenda of
September 3, 1998 and be placed on the September 17, 1998 P & Z Agenda.
Thank you for this consideration.
Sincerely,
Donald D. Garrett
Garrett Engineering
z
Texas Department of Transportation
'if 1300 N. TEXAS AVE. • BRYAN; TEXAS 77803-2760 • (409) 778-2165
July 22, 1998
District Site
Brazos County
BC-101-2501
17-77-000002501.
Ms. Shirley J. Volk
Development Coordinator
City of College Station
P.O. Box 9960
College Station, Texas 77842
Dear Ms. Volk:
The. Texas Department of Transportation is currently negotiating to purchase a 24.046 acre
property from Frank Thurmond and Jerry Windham in south College Station. This property is
located along the east side of State Highway 6 South, north of Greens Prairie Road. Based on
zoning information provided by the City of College Station, the frontage portion of the property
is zoned C-1, General Commercial, while the rear portion is zoned R-5, Apartment/Medium
Density. In previous visits with City of College Station staff, we were informed that the rear
portion of the property does not currently have the appropriate zoning for our intended use. The
intended use of the property is for the district administrative, engineering, and right-of-way
offices of the department, as well as a warehouse and shop.
The Department is hereby requesting your guidance in rezoning this property or receiving a
conditional use permit for our intended use.
If you have any questions or need additional information, please contact Mr. Allen Schulze of
our office at 409-778-9701.
Sincerely,
Phillip E. Russell, P.E.
Director of Transportation
Planning and Development
An Equal Opportunity Employer
12/17/98 12:27 GARRETT ENGINEERING 4 409 764 3496 D01
__j r 11 r"
r I w l G
,j,4 A R R r'r 'r6 R
CONSULTING ENGINEERING 8 LAND SURVEYING
4444 CARTER CREEK PKWY, SUITE 108 BRYAN, TEXAS 77802 (4081846-8686 14105) 846-3084
December 16,1998
Ms. Shirley Volk
City of College Station
College Station, 'T'exas
Dear Ms. Volk:
On behalf of my clients, Frank Thurman 8% Jerry Windharn., 1 request that the
Mauer Plan of Pebble Hills and the Preliminary Plat of Pebble Hills, Phase III
be pulled from the P&7. Commission Agenda of December 1.7,1998 and be
placed on the January 7,1998 P&Z Agenda..
's'hank you for this consideration.
Sincerely,
Donald D. Garrett
f~n
V-1 JR f
X16 0
/A 1
wok
x
os q-
I
p~
P`~Q s~ ~ lA~►
s
r
3
S O
O ~
3
1 t
(MUAR10~ 1q E3S
BARRON PARK
LOT
939/2(
I H S BRAZOS VAL
TO
MEDITRUST OF COLL
(CALLED 15.00
VOLUME 1797, P/
FILED FOR RECORI
LOT 2 f
HOMESTEAD SAVINGS ASSOCIATION QQF EXR?
TO f\~ o
METHODIST CHURCH, TE S FFrENo E
(CALLED 9.62 ACRES)
VOLUME 2034, PAGE 41
FILED FOR RECORD 2/~1/94v f'
n
ol 1
STATE HIGHWAY v 6 n,R.
0
¢
v
0
0
M
w w
v C-
x U ¢ 0 \
W O
U
Z
,g 0
¢ 0
Q U
U
c ~