HomeMy WebLinkAboutMinutes:K:.,:::.:::.:.., ~ ................ ...........:.. ...:::::y::y:.~:::::.......................::...::..:.
;^^ ~:~i:4iiii ~i:::::~ii<~i ~-~i:•i:i~:i?•i:~ii:
~' .TFPr:•1F~:i:::'.?:•:{.?ii$:~:~:tiSi'i:::,i:::•'..r~'}i?:yi::': :r,.:i4:ti :iiii:':>.•Xt
r..... •x.....
::nwn:: x.:... .vv x .............. x:::: •v........................•• .................. ........... ........... ...................... .................................
Regular Item
^X Consent Item
Workshop Item
Item Submitted By: Edwin Hard, Transportation Planner _,
it Council Meeting Date: January 14,.1999
Director Approval:
City Manager Approval:
I
Item: Consideration of an amendment to the Master Development Plan of the Pebble ]3ills
Subdivision, 173.1:8 acres located on the north side of Green's Prairie Road approximately 1:1.00'
from the Highway 6 intersection;. and consideration of a Preliminary Plat of approximately 2;5.57
acres located in the. northwest corner of the proposed subdivision. Application is in the namie of
Garrett Engineering for .Terry Windham and Frank Thurmond: (98-314 & 98-315)
Item Summary: The applicant is proposing several changes to the: original Master Plan in order
to accommodate the relocation of the TXDOT facilities on the commercial tract of the proposed
', subdivision.
The revised Master Plan includes the following changes to the original plan:
1. An additional 8 acres of commercial zoning to the existing 17 acres
2. A landscape buffer easement on the future C-1 acreage
3. A reduction of the existing buffer zone of R 5 between the commercial tract and the
future Lakeway extension
4. An alley that extends across the rear of the future R-5 tracts to assure that all access
from the R-S development will be taken from the alley. rather than Lakeway
5. A slight reduction of single family lots (from 2621ots to 2451ots)
6. The relocation of the future Lakeway extension to the east
7. An additional commercial street that will. extend from Lakeway to the Highway 6
frontage road across the south side of the future C-1 and R-S tracts
8. The. relocation of a residential collector street to the south
o:\group\deve_ser\cvsht\jan1499\98-314.doc
A rezoning to change the existing zoning boundaries will come before the City in the future.
The preliminary .plat is for the.. future TXDOT property, and will include the majority of the
commercial street along the south .side... The eland uses on that site will include offices,
warehousing, vehicle maintenance, and a sign shop.
Item Background: The original Master Plan was approved by the City in 1996, at which time the
rezonings to R 1, R 5; and C-1 were. also approved.
Budgetary & Financial Summary: Oversize :participation ma be requested on the 18 inch water
main extension required with-the final plat..Sanitary sewer impact fees will be collected at the time
of final plat..
Staff Recommendations: Staff recommends approval of both the Master Development Plan and
the Preliminary Plat.
Related Advisory Board' Recommendations: The Planning and Zoning Commission
recommends approval by a unanimous vote.
Council Action. Options:
1. Approval as submitted
2. Approval with conditions
3. Denial..
4. Table. or defer action only at applicant's request
Supporting Materials:
1. Location: Maps
2. Engineering Information and Notification Information.
3. Copy of Master Development Plan
4. Copy of Preliminary Plat
o:\group~deve_ser\cvsht\jan1499\98-314.doc
ENGINEERING
Water: Various water mains are proposed with this Master plan. A 12 inch water amain
trunk line will connect the existing 12 inch water main near Desert Hills to existing vvater
service at the `Lakeway Drive and Greens Prairie Road'intersection. This 12 inch system
will also extend to the east to provide adequate water service to the area where the fixture
Pebble Creek Parkway will extend.
As shown on the Pebble Hills Estates Phase 3 Preliminary Plat, an 18 inch water amain
will be extended along. the frontage of State Highway 6 which will be extended as future
development along the frontage: road occurs.
Sewer: Various. sanitary sewer lines. are proposed throughout the subdivision, all of
which will connect to .the proposed impact fee. trunk line being built as part. of the capital
improvement plan in the sanitary sewer. impact fee area 97-01. Also shown on the
master plan is a small .portion of property that is located outside the limits of this plan
that will need to sewer into the proposed. infrastructure that is a part of this master plan.
T'he Preliminary Plat of Phase 3 will obtain sewer service from an-8 inch sewer line that
will be extended by the current ;owners and will connect with the .proposed impact fee
line.
Streets: This plan: shows the .extension of Lakeway .Drive as a .north -south major
collector as well as another .east -west major collector. Pebble Creek Parkway is also
shown as per the .Thoroughfare Plan.
A commercial collector (Creagor Lane) is proposed along the south side of the Pebble
Hills Phase 3 ,Preliminary Plat that will serve that immediate area. A temporary public
access easement will need to'be dedicated at the time of final plat to cover the temporary
cul-de-sac of this street.
Off site Easements: At thistime no ofd site easements are proposed.
Sidewalks: Sidewalks will be required as per the subdivision regulations.
Drainage: Drainage will be reviewed in accordance with the City of College Station
Drainage Policy and Design Standards at the time of finalplatting.
Flood Plain: The 100 year floodplain is delineated on the Master plan as it exists per the
1992.: FEMA maps.' There'' is no floodplain on the proposed Pebble Hills Phase 3
Preliminary Plat.
Oversize request: See Budgetary. and Financial Summary Section.
Parkland Dedication: ' Park/greenbelt areas are shown on the Master plan. These
dedications will. be processed at the time of final .platting.
Impact Fees: This master plan is located within the Sanitary Sewer Impact Fee .Area
97-01 Impact fees will be assessed at the time of final platting.
NOTIFICATION:
None required
o:~goupldeve_ser\cvsht\jan1499U8-314.doc
..~-~sirnn.#~- 5_ c~
Regular Item
QX Consent Item
Workshop Item
Item Submitted By: Edwin Hard, Transportation Planner
Council Meeting Date:
Director Approval:
City Manager Approval:
January 14,.1999
Item: Consideration of an amendment. to the Master Development Plan of the Pebble
Hills Subdivision, 173.18 acres located on the north side of Green's Prairie Road
approximately 1500' from the Highway 6_intersection; and consideration of a Preliminary
Plat of approximately 25.57 acres located in the. northwest corner of the proposed
subdivision. Application is in the name of Garrett Engineering for Jerry Windham and
Prank Thurmond, (98-314 & 98-315)
Item Summary: The applicant is proposing several changes to the original Master Plan
in order to accommodate the relocation of the TXDOT facilities on the commercial tract
of the proposed subdivision.
The revised Master Plan includes the following changes to the original plan:
1. An additional 8 acres of commercial zoning to the existing 17 acres.
2. A landscape buffer easement on the future C-1 acreage.
3. A reduction of the existing buffer zone of R-5 between the commercial tract
and the future Lakeway extension.
4. An alley that extends across :the rear of the future R-5 tracts to assure that all
access from the R-5 development will be taken from the alley rather than
Lakeway. -
5. A slight reduction of single family lots (from 2621ots to 2451ots).
6. The relocation of the future Lakeway extension. to the east.
7. An additional commercial street. that will extend from Lakeway to the
Highway 6 frontage road' across the south side of the future C-1 and R-5
tracts.
8. The relocation of a residential collector street to the south.
A rezoning to change the existing zoning boundaries will come before the City in the
future.
The preliminary plat is for the future TXDOT property, and will include the majority of
the commercial street along the south side,.. The land .uses on that site will include offices,
warehousing, vehicle maintenance, and a sign shop,
Item Background:. The original Master Plan was approved by the City in 1996, at which
time the rezonings to R-l, R-5, and C-1 were also approved.
Budgetary & Financial Summary: ®versize participation may be requested on the 18
inch water main extension required with the final plat. Sanitary sewer impact fees will be
collected at the time of final plat.
Staff Recommendations: Staff recommends approval of both the Master Development
Plan and the Preliminary Plat.
Related Advisory Board Recommendations: The Planning and Zoning Commission
recommends approval by a unanimous vote.
CouncilAction Options:
1. Approval as submitted.
2. Approval with conditions.
3. Denial.
4. Table or defer action only at applicant9s request.
Supporting Materials:
1. Location Maps.
2. Engineering Information and Notification Information.
3. Copy of Master Development Plan,
4. Copy of Preliminary Plat.
ENGINEERING
Water: Various water mains are proposed with this Master plan. A 12 inch
water. main trunk line will connect the existing 12 inch water main near Desert
Hills to existing water service at the L,akeway Drive and Greens Prairie Road
intersection. This 12 inch system will also extend to the east to provide
adequate water service to the area where the future Pebble Creek Parkway will
extend.
As shown on the Pebble Hills Estates Phase 3 Preliminary Plat, an 18 inch wager
main will be extended along the frontage of State Highway 6 which will be
extended as future development along the frontage road occurs.
Sewer: Various sanitary sewer lines are .proposed throughout the subdivision,
all of which will connect to the proposed impact fee trunk line being built as part
of the capital improvement plan in the sanitary. sewer impact fee area 97-O1.
Also shown on the master plan is a small portion of property that is located
outside the limits of this plan that will need to sewer into the .proposed
infrastructure that is a part of this master plan.
The Preliminary Plat of Phase 3 will obtain sewer service from an 8 inch sewer
line that will. be extended by the current owners and will connect with the
proposed impact fee line.
Streets: This plan shows the extension of Lakewa Drive as a north -south
major collector as well as another east - west~~`~' collector. .Pebble Creek
Parkway is also shown as per the Thoroughfare Plan.
A commercial collector (Creagor Lane) is proposed. along the south side of the
Pebble Hills Phase 3 Preliminary Plat that will serve that immediate area. A
temporary public .access easement will need to be dedicated at the time of final
plat to cover the temporary cul-de-sac of this street.
Off-site Easements: At this time no off-site easements are proposed.
Sidewalks: Sidewalks will be required as per the subdivision regulations.
Drainage: Drainage will be reviewed in accordance with the City. of College
Station Drainage Policy and Design. Standards at the time of final platting.
Flood Plain:. The 100 year floodplain is delineated on the Master plan as it
exists per the 1992 FEMA maps. There. is no floodplain on the proposed Pebble
Hills Phase 3 Preliminary Plat.
Oversize request: See Budgetary and Financial Summary Section.
Parkland Dedication: Park/greenbelt .areas are shown on the Master Plan.
These dedications will be processed at the time of final platting.
Impact Fees: This master plan is located within the Sanitary Sewer Impact F'ee
Area 97-01. Impact fees will be assessed at the time of final .platting.
NOTIFICATION: None required.