Loading...
HomeMy WebLinkAboutStaff ReportSTAFF REPORT Item: Public hearing and consideration of rezoning 88.8 acres bound by Barron Road, Shenandoah and undeveloped property to the south and west (to be called Shenandoah Phases`6- 10) from A-0 Agricultural Open to R-1 Single Family Residential. (case # 98-107) Also consideration of a master preliminary plat of the same property dividing same. into 277 residential lots and one 12 acre city park. (case # 98-309). Item Summary: This property west of the existing Shenandoah Subdivision and is a continuation of the same type: ofresidential development. Southern Plantation Drive. will continue and connect into theses new phases and the developer will dedicate 12 acres of parkland. Lots will average 208 acres per lot and there will be 17.5 acres ofright-of--way eventually dedicated. The Parks Board reviewed the proposed parkland dedication and recommends that the Commission and Council accept the proposal. It is in excess of the ordinance requirement which is approximately Z acres.. There is a drainage way and detention facility located in the park that the City will own and maintain along with the parkland. The land use plan shows this area for medium density single family development and the thoroughfare plan shows minor collector roadways going through the tract. Southern Plantation and Alexandria function as these collectors. The rezoning and master preliminary plat comply with the comprehensive plan for development of this area. Policy Issue Statement: Civic Pride Citizens benefit from well-planned, attractive residential and commercial areas, and from preserving historic areas. .Item Background: Staff has been working with property owners in this area of town over the past several months to define thoroughfare locations. Southern Plantation is shown to decrease from a 70 foot right-of--way'to 60 feet through these new phases. This complies with the minor collector shown. on the thoroughfare plan. Alexandria is shown as an additional north/south minor collector that will eventually connect the Crowley property to the south with Barron Road. Budgetary & Financial Summary: NA Staff Recommendations:. Approval of the rezoning and plat. Commission Action Options: Approve rezoning,. approve with conditions or deny. Approve plat; approve with conditions,. deny for stated reasons. Supporting Materials: 1. Location Map 2. Application 3. Engineering Information and Notification Information o;\group\deve_ser\stfrpt\981073 09. doc ENGINEERING Water: The applicant will be extending water service throughout the new phases of Shenandoah as each phase is final platted. Existing infrastructure is adequate to support the proposed extension.. Sewer: The applicant will be extending sewer service throughout the new phases of Shenandoah as each phase is final platted. Existing infrastructure is adequate'to support. the proposed extension. Streets: 12 new SO foot right-of--way residential streets are proposed with this-Master Plat. Anew 60 foot minor collector, Alexandria Avenue, is proposed as well as the extension of Southern Plantation Drive as a 60 foot minor collector. A total of 17.527 acres of street right-of--way is proposed with this Master Plat, Off-site. Easements: NA Sidewalks; Sidewalks are required on one side of the residential streets and on both sides of the 2 collector streets. Drainage: The applicant is proposing regional detention to be located within the 12 acre City Park that is being. dedicated with thisplat. This detention facility will be owned and maintained by the. city. Flood Plain: The latest Federal Emergency Management Agency (FEMA) Flood Insurance. Rate Maps show that no portion of the subdivision is located within the Regulatory 100 Year Floodplain. Oversize request: See Budgetary and Financial Summary Section. Parkland Dedication: Parkland dedication is being taken care of by the dedication of a 12.097 acre park as shown on this Master Preliminary Plat. Impact Fees: This property is located within Sanitary Sewer Impact Fee Area 97-01. .Impact fees in the amount of $267.94 per dwelling unit will be imposed at the time of final platting. NOTIFICATION: Advertised Commission Hearing Dates(s): May 7, 1998 Advertised Council Hearing Dates: May 28, 1998 Number of Notices Mailed to Property Owners Within 200': 30 Response Received: None as of date of staffreport o:\group\deve_ser\stfrpt\98107309.doc