Loading...
HomeMy WebLinkAboutMinutesMr. Randy McCarty, ABC Pest Control General Manager, explained that there would be no chemical storage on site. All chemicals are stored on the vehicles and they are mixed at the job site. Employees take the company vehicles home with them on evenings and weekends. No vehicles are. stored on site. Acting Chairman Gribou closed the public hearing. Commissioner Rife moved to approve the parking lot plan with all staff recommendations. Commissioner Silvia seconded the motion which passed unopposed (5-0). :AGENDA ITEM NO. 4: Consideration of a final plat for Edelweiss Phase 15-A, located southwest of Edelweiss Phase 11 and north. of Edelweiss Avenue. City Planner. Kee presented. the staff report and stated that this final plat is a portion of the Edelweiss Estates Subdivision, located east of Wellborn Road and in the general vicinity of Rock Prairie Road. This final .plat section is located north of Rock Prairie Road. It is in compliance with .the Master Development Plan for this subdivision which was approved in September 1997. Staff recommended approval of the final plat as submitted. Commissioner Lightfoot moved to approve the final plat as submitted. Commissioner Parker seconded .the motion which passed unopposed (S-0). AGENDA TTEM NO. S: Consideration of a Master Preliminary Plat for Pebble Creek Commercial Development Subdivision Phase I, bounded by Greens Prairie Road, Lake`vay Drive, Venture Avenue and SH 6. (98-306) City Planner Kee presented the staff report and stated that this plat contains approximately 44.17 acres for future cornmercial development at the most westerly entrance to the Pebble Creek Subdivision. It is being subdivided into 21ots and a reserve tract. Two lots are for more immediate development and the larger 32 acre tract is for future development. The majority of the property is zoned C-1, with some areas zoned M-1 and A-P that were remaining after the adjacent tracts were platted. Ms. Kee explained that Staff reviewed this plat at a staff review meeting and there were several comments made at the time. The applicant has addressed all comments except the following: 1 Remove note #3 - it is not applicable to this plat. 2. A clean-up rezoning may be required in the future at time of site plan approval. 3. The zoning information for the business park needs to be corrected. 4. l~erify' sewer location across Lrrkeway -future extension may be required when the reserve tract comes in for final platting. Staff recommended approval with the above referenced conditions. Commissioner Parker moved to approve the Master Preliminary Plat with staff conditions. Commissioner Silvia seconded the motion which passed unopposed (5-0). P&Z Minutes April 16, 1998 Page 3 of S STAFF REVIEW REPORT January 22, 1998 TO: Young Brothers, Inc. P.O. Drawer 1800, Waco, TX 76703 Don Garrett, Garrett Engineering 4444 Carter Creek Pkwy#108, Bryan, TX 77802 FROM: Development Review Staff: Veronica Morgan,. Assistant City Engineer - Jane Kee, City Planner Natalie Ruiz,. Assistant Development Coordi to Shirley Volk,: Development Coordinator Tony Michalsky, Electrical Operations Coordinator Laverne Akin, GTE Representative SUBJECT: Master Plan -Future Phase of Pebble Creek; a master plan for 44.17 acres located south of Greens Prairie Road between Greens Prairie and Venture Avenue, west of Lakeway Drive and east of State Highway 6. (98-306) The development review staff reviewed the above mentioned master plan on Tuesday, January 20, 1998 and made the following comments. The following is a list of ordinance requirements identified by staff.. This .list does not relieve the applicant of total. compliance with all current ordinance requirements. Ordinance Requirements: _ Change the name of the plat to a Master Preliminary Plat instead of a Master Plan. There is enough information provided- so that lots 1 and 2 can go directly to a final plat. (If this drawing remains a Master Plan, a subsequent preliminary plat will be required prior to the final plat.) Revise the title block to include a Phase number and the words "Not For Record". Clarify general note #2. What "plat"' are you referencing? Modify the property lines of lot 1 and the 32.5. acre reserve tract near the Parkview Circle extension. 'The proposed 50' .public right-of--way cannot be owned by the adjacent property owners. .(Partial streets may not be platted. The entire right-of--way width must be included with a final plat.). Provide the .zoning :information for the subject and adjacent properties as required in the Subdivision Regulations. (The zoning information for the subject property should also be included on the application.) _ Frovide the topographical information including contours at 2' intervals, flow line elevation of streams and wooded areas. Staff Review Pebble Creek Subdivision Case #98-306 Page 2 of 2 Ordinance Requirements (contJ: Is oversize participation being requested? If so, submit the necessary impact studies to support the request. In general note #3, remove the reference to the "cement stabilization base". How will the proposed lots be served with public water and sewer service? Comments/Concerns: _ Show the existing easements along .Highway 6 and Greens Prairie Road that contain existing utilities. Also show the existing on site utility easement that cover electrical lines. The proposed street will need to have street lighting. Coordinate the street lighting design and electrical service details with Electrical Operations Coordinator Tony Michalsky at (409) 764-3660. _ Coordinate telephone service details with GTE Representative Laverne Akin at (409) 821- 4723. _ Coordinate gas service details, availability and meter locations with Lone Star Gas Representative David borough at (409) 776-0627 or by mobile at 777-0305. SUBMIT THE MYLAR ORIGINAL AND 13 COPIES OF THE REVISED PRELIlVIINARY PLAT BY TUESDAY, JANUARY 27, 1998 TO BE INCLUDED IN THE PLANNING AND ZONING CONIlvIISSION PACKETS FOR THE. MEETING ON THUR.S'DAY, FEBRUARY S, 1998 AT 6: 30 P.M. IN THE CITY HALL COUNCIL ROOM, 1101 TEXAS AVENUE SOUTH.