HomeMy WebLinkAboutMinutesAGENDA ITEM NO. 3: Public hearing and consideration of a rezoning request and final plat of
approximately 18.78 acres located approximately 15' south of St. Andrews, and Royal Adelade
Drive, proposed Pebble Creek Phase 8, from A-O Agricultural Open to R-1 Single Family. (98-
110 & 98-22~,/
Senior Planner McCully presented the staff report and stated that the proposed rezoning and final plat
are in compliancewith the Land Use Plan and the approved Pebble Creek Master Plan. The subdivision
has been building out during the past decade as a low and medium density single family. development.
She explained that there were numerous off-site public utility easements and one roadway easement that
must be dedicated prior to the filing of the final plat.
Staff recommended .approval of the rezoning as submitted and recommended approval of the final plat
as submitted with the. condition that all 'off--site public utility and roadway easements be recorded prior
to the filing of the final plat,
Commissioner Rife asked for clarification of the requirement of recording the easements prior to filing
the final plat. Assistant City Engineer Morgan explained that the easements would be easier to locate
because there would. be a volume and page number available at the time of filing the plat.
Chairman Massey opened the public hearing. Seeing no one to speak in favor of or in opposition to the
rezoningrequest the public hearing was closed.
Commissioner Parker moved to recommend approval of the rezoning request as submitted.
Commissioner Garner seconded the motion which passed unopposed (7-0).
Commissioner Rife moved to approve the final plat with the condition that all off-site public utility and
roadway easements be recorded prior to the filing of the final plat. Commissioner Garner seconded the
motion which passed unopposed (7-0).
AGENDA ITEM NO. 4: Discussion and possible adoption of parking guidelines for certain
industrial uses.
Senior Planner McCully presented the following guidelines for consideration:
Manufacturing/Assembly 1 space per 1 employee (longest shift)
Research & development/
Laboratory 1 space per; l employee (longest shift)
Wholesale/display l space per 500 square feet
She explained that the parking ratios stated are to be a guideline only, and. are not to be considered the
final parking requirement. The Commission may either increase or decrease the ultimate parking that is
to be required on a case-by-case basis.. Therefore, it' is in the best interest of each applicant to supply
information to support the desired parking numbers at the time the case comes before the Commission.
Commissioner Rife moved to adopt the guidelines.. as presented. Commissioner Parker seconded the
motion which passed unopposed (7-0).
P&ZMfnutes .July 2, 1998 Page 3 of 8