Loading...
HomeMy WebLinkAboutMinutesAGENDA ITEM NO. 7: Consideration of a Final Plat for Shenandoah Phase 6 which consists of 62 residential lots totaling 16.75 acres located along Barron Road, southwest of Shenandoah Phases 4 and-S. (98-221) Assistant City Engineer Morgan presented the staff report and stated that the Final Plat is the first final plat from the Shenandoah Phases 6-10 Master Plan .that was approved by the City Council on May 28, 199$, The final plat is located adjacent to Barron Road and consists of Alexandria .Avenue, a minor collector, and four residential cul-de-sacs. Alexandria will continue through the subdivision and connect to Southern Plantation Drive in future phases. Parkland Dedication will be taken care ofby a 12.097 acre park south of Southern Plantation. The Parks Board reviewed -this proposed dedication, recommended approval to the Commission and the. Commission approved the location with the Master Preliminary Plat. This dedication is sufficient to fulfill the required dedication for all lots shown on the approved Shenandoah Phase 6-10 Master Plan. This subdivision is located within the Sanitary Sewer Impact Fee Area 97-O1. Impact Fees in the amount of $267.94 per residential lot, or $16,612.28, must be paid prior to filing of the final plat. Staff recommended approval of the final .plat with the following conditions: 1. Dedication of the offsite 10 foot public utility easement prior to filing of the final plat. 2. Dedication of the offsite public drainage easement prior to filing of the final plat. 3. Payment of sanitary sewer impact fees prior to filing of the final plat. 4. Renaming of Detrick Court per a request by the Police Department. 5. Parkland dedication by separate instrument prior to filing the final plat. Michael McClure, developer of the project, stated that Brazos County 911 requested the developer to change the name of Detrick Courf and approved the street name Skyline Drive. Commissioner Maloney moved to approve the Final Plat with staff's recommendations. Commissioner Mooney seconded the motion which passed unopposed (7-0). AGENDA ITEM NO. 8: Consideration of a Replat of Tract "N" to create Lots 1N, 2N, and 3 N of the Ray Cowart Division, being: approximately 2.0.5 acres in the City's ETJ (Extra Territorial Jurisdiction) located off of Peach Creek Road. (98-223)x/` Graduate Engineer Kaspar presented the staff report and stated that this replat would create 3 lots out of 1 existing 20.5 acre tract of land. All three lots would have access to Peach Creek Road. There is a significant amount of undetermined floodplain on these properties, but this should not be a problem since they are large acreage lots. Water service will be provided by the Wellborn Water Supply Corporation.. Staff recommended approval of the replat with the condition. that the replat is approved by the Brazos County Commissioner's Court. Commissioner Garner moved to approve the Replat with the condition that it is approved by the Brazos County Commissioner's Court. Commissioner Parker seconded the motion which passed unopposed (7-0). P&Z Minutes July 2, 1998 Page S of 8