The purpose: of .our letter fs t ~ ted ~ beta constructed under ity
improvements be approved and ac p g
.inspection and completed according to plans and speeigcations as
,approved and required by the City of .College. Station, Texan. Thfs
approval and acceptance by the City is requested in onethe wo ke This
gnu any. sub-contracts and to affirm their warranty
approval and acceptance by the City of the improvements listed .below
does hereby void the letter of guarantee for the listed improvements on
;tY}e. above referenced project
The one year warranty is hereby affirmed and .agreed to by
and by their sub-contractors as
iiz ieated y signatures . ow.
WORK COMPLETED
l~~l n ~3~" ~ ~jry~ W ~~ -
•
Utility Rcpresentative (sj
ACCEPTANCE & APPROVAL
ty En neor
.DATE
I -,~;"cj~j,-
O~ancr: ~ 1
Address 3$8'? ~vn e~.~~ m e
r
Contractor: '' ~`'
Address: 1 Jl G~ (~~.,~°s'f`~r-
. flu,,,. -
~~~ ~ .
,, ;
~,
I;
JAN 27 '99 00:03
409 7740565
3887 High Iooaso~me R°'eid
Collego Stado~o. TX ??845 4-0Sb5
Office (409)??b~82bb. Fax (409}?7
Fecsimil~e Traosmitta~: ~.~ ~ ~' _~ 5 ~
From: d~l
~: t l ~
Pages iaclu~ding cover: ~'
~.c~,~1 ~Y1c~ ~
~ ~~~
T0: 409 764 3496 P01
r~~~j_.3~~~c
~..
w-~-a-» ~ t
JAN 2;7 '99 00:.04
f
409 7740565 T0: 409 764 3496 P02
~. ~~.•rt ~ ~QC ~~trini~~Rinlr_ inir_
June 5, 1998
Mr, Edward Froehling
3887 High Lonesome
College Station, Texas 77845
Re: Cost Estimate for Shenandoah Subdivision, Phase b
Dear Mr, Froehling:
Attached is a cost estimate for Phase b of Shenandoah Subdivision, It was
developed upon completion of the subdivision's final design and represents an accurate
estimate of the total cost. If you have any questions regarding the estimate, please
contact me at your convenience.
Thank you,
Kent Laza, P.E.
Project Manager
attachment
1722 6readmoor, Suite 210 • Bryan, Texas 77802 (409) 776-6700 FAX (409) 776-6699
JAN ~7 '99 00:04
409 7740565 T0: 409 764 3496 P04
Item Dereilptioe Uaee Vale lPNoe l2saaeUf Mt
PAV3;MEN? CONSTRUCITON
I Mobilizatim L$, 3,000.00 1 3,000.00
2 Pjepare RO.KI, LS. 5,000,00 I 3,000,00
3 Sih Fare L.F. 4.25 1,000 250,00
4 Ccvudeuaeime F.eIIagoe S.Y. 2SA0 70 1,750,00
S Inlet Prara^tia~ Ea. 40.00 14 400.00
5 b" Lime Stabilized Subbmae B.Y. 3.?S 10,366 18,505.50
T Bstta Lliaa Toe 10.00 70 4~OZ.84
8 6" Crushed Smme I3sse S.Y. 6.50 3,638 36,647.00
9 7" Craml•~ed Some l3aae S.Y. 7,00 2,513 2?,591,00
10
~~~ 1.5"Aspbaltl'avement S.Y. 5.00 S,iSI 40,?55.04
11 Reim; Caws Curb and Ouaet LF. 7.50 2,31 t 18,8SS.60
t 2 Reiufonxd Caesc~ee AptonlDlive~say S,F. 3.00 24,270 7Z<810.00
3 Re+sd'ctoad Car~reae Sidewalk S.F. 2.50 ?,712 19,280.00
is Coam+an 33uoavatiat C.Y. 4.00 13.000 52,000.00
13 Cellulope Fi1~Mvlclr S,Y. 8,70 17,000 1100.00
P lelUT 0031' 315,647.34
16
17
18
i9
20 5' 8tsodartii Receaeed lnle[
IO' Staadat+d Recessed Ldoe
hmction 13oz
MH Access {&a Gldvett)
I S" RCF Fi
13a.
F,a.
1'a.
LF, 2,0OO.OD
?,300.00
2,000.00
7,500.0(3
30.00 4
4
4
4
31 8,000,00
10.000.00
8,000.00
6,000 fl0
930
00
21 1$' RCP ~~ ~-~ ~ ~ ~ -~ LF. 33.00 TT .
2,541.00
22 21" RCP LF. 33.00 31 1,085.00
~ 2d" kCt' LF, 39.00 138 4,830.00
24 27' RCP LF~, 40.04 173 6,910.00
25
~. 30" RCP - LF. 45.06 307 13,815.00
16 36' RAP .. L.F. 60,00 381 12,860.00
27 a2i' RCP LF. 70.00 307 2 L,490.00
28 48' RCP LF. 80.00 301 24,080.m
29 9k4' Elox Culvert (C-7$9) L.P, 150.00 24S 37,206.00'.
30
~ Sk4' Box C4[vart (C-RSO) LF. 180.00 376 67,680.00
31 S?c4' RC13C 49 Degrm Bend Fa 1.200.00 -. 2 1,4m.00
32 9514' RCBC Sloped Neada~all Ea. 1.000.00 1 2.000.00
33 7i' 3tCP Slapod Headwall Ea. 500.00 2 1,000.DO
34 36" RCP Sloped Headwall 13a. 700.00 2 1.400.00
35 48' Die 13mc Calvet Canpeo[im Fi. 1,000.00 I 000
00
7
36 .~ ,_
[:axrete Rlp Rap w/ Toe Doub 3.F. 2.30 720 .
.
1,$00,04
37 Dory Rip Rap Cbmsra3 L}~ en Fabric B.Y. 30.00 301 9,030Ap
38 Solid l~rtrnuda Sod B.Y. 3.00 3S0 1,050.00
., 39 'Fn>o~e Safety _ _ LF. 1.00 2.060 206D.D0
1 of 2
6~S~y 8
JAN 2? '99 00:05 409 7?40565 T0: 409 764 3496 P05
ShelRandosh, Aeaandiiis Avenue
Cant Estimate
Itcm Deserip4bmt Unk Utdt plicr Qn~dty Coat
WATER I,INB CONSTRUCTIO N
40 12" 1)vatile Iron Water Line LF. 30.06 54 1,620A0
41 6"PVCWnterline LF. 15.40 1,874 28,110.00
42 G" M.J. Gate Valve Ea. 373.00 4 1,SOU.00
43 6" x 13' M.J. Archm~ Coupling Ea 200.00 4 800.00
44 8"PVC Water line L.F. 18.00 446 8,028:00
00
210 2 506.00
43 8" x G' M.J, Cmns Ea. . _
46 8" M.J. date Valve _ Ea. 500.00 3 1:304.00
47 8" x 13" M.J. Coupling Ea. 250.00 3 750.00
48 2" Blow off Aasembty Fi 400.06 6 2,400.00
48 ' Fire Hydra AseamhlY (Type II) ,..~, ErL t,d00.00
00
00 1
3 1,400.Q0
4
00
500
49 Fire Hydrant Assembly (type RE) Es. .
1,5 ,
.
30 l2" M.J. Cap Ea 100.00 2 200.00
51 CumiecttoF.acisdng Fa 300.00 1 300.00
52 lg' ~-dlo lron Water Lint LF. 30,00 1,137 31,114.00
S3 Teo
J
18"xS^M Es St10,00 1 500.00
.
. 1 00
000
4
54 i8" 1~Ry V~ve Ea 4.000.00 .
,
SS 18" M.J.1'1ug Ea 100.00 1 100.00
5b Type 1V Fire Hydrant Assembly &. 2,300.00 1 2500.00
57 8" Buctile Iron Wetor line' wt I-#eeh. Jokes LF. 21.00 108 2,?b8.00
Average l.er~h)
ter Service (60
S" W
1 Fa '736.00 1 S 11,250.00
.._.._
58
. 59 ' :
a
.
1.5' WaLx savioe (15' Average Lenglh) ,~.. ..~ 273.00 2 SS0.00
60 l .5' wrier Service (30' Average 1 ength) Ea 500.00 3 1,700.00
Gl 1" Water Sarvioe (20' Average I,~gth) Ea. 300.00 1 300,00
62 6" 11.23 Deg[eo M.J, Bend Es. 200.00 1 200.00
63 french S I..F. 1.0 0 1,551 1,SS1.W
WATER LllYE COST 110,a3T.00
SEWER, i,1NE CONSTR UCTIO N
64 Standard Manhole (6' to $' Deep) Ea. 1,500.00 G 9,000.00
6S Standard Manhole (8' to 30' Deep) F.a. 1,710.00. 5 8,750.00
6(i Standard Manhole (10'to 12' Deep) 1•a 2,000.00 3 6,000:00
b7 C`,annect in Esisting MH Fa 300.00 1 500.00
68 6" PVC (!73034, 4' to 6' Deep) L.F. 13.00 406 1,278:00
G9 6" PVC (D3034.4' to b' Imo) w/ 3traAural Fill LF. 15.00 .172 2,.380.00
70 6"PVC (83034, 6' fo 8' Deep) L.F. 15.00 1,063 1545:00
71 G" PvC (U3034, 6` to 8' Deep) wl Strucdrral Fill L.F. 17.00 65 1,105:00
7Z 6"PVC{D3034. Sto 10' Deep) LF. 17,00 589 10,013DO
73 6" 1?vC (D3034, S'to 30' Deep) wl S[ructtrral Fill LF. ,._ 20.00 80 1;600,00
74 6" PVC (p3034, 10'to 12' Dmp) i_F. 20.00 491 9,820.00
75 G" PVC (132241, 4' to 6' Ikxp) L.F. 13.00 263 3.445';00
76 6'' PvC (172241, 4'to 6' Reap) wt Stcttctutal Fill LF. 15.00 40 .608.00
77 G"PVC (D2241,10' to 12' Deep) LF. 20.00 120 3,400.00
78 F" Ceps Ea. 30.00 13 610.00
79 6" Mock Bare (ASTM D-2241 Pip$) L.F. 35.00 33 1,855.00
BO Trench 3afdy LF. I,00 3,291 3,291.00
81 Type Y Sewer Service (20' Averago Length) Es. 450.00 1 450.00
82 Type I Sewer Service (SO' Average Lengdr) Ea 950.00 6 4,300.00
83 Typo Y Sewer Service (60' Average Lengdt) _ Ea 850.00 S .. 6,800.00
64 Type TI.:Sewer Servirs (5' Average Length) Ea. 250.00 1 210.OC9
85 7~'P16 I1 sewsft. Sexvios (40' Average length) Ea. 600.80 1 600.00
86 Type 1I Jewer Service (50' Average I,or~tlr) Ea. 700,00 1 700.00
87 TS'Pe I[ Dewar Sarviae (80' Average I~ngth) Ea. 1.000.00 1 1,000.00
x8 '1' Ii'Sewar Service 90' Aver ) Ea 1,100.00 2 2,200,60
l3EWS1i I,tiNE COST 594j32.00
TtY[AL CONST1iiUCTiON COt41' 978a,.~?34
avez
e
Shenandoah Subdivision, Phase 6
Preliminary Punch. List
February 16, 1999
The following items were noted on this date as needing correction prior to the
completion of this project.
I. Install joint sealant in all expansion. joints on the sidewalks, curb and gutter.
$200
2. Clean out forms, trash, debris. in the storm drain inlets and junction boxes.
$50
3. Install straw bale barriers on Barron Road downstream of Alexandria Drive.
$150
4: Install inlet protection around the inlets within the subdivision. $450
5. .Install dry rip-rap in Barron Road ditch. All rip-rap items = $3130
C: Install dry rip-rap. at the end of the curb and gutters on Alexandria Drive. (see
#~ above)
7. Turn all fire hydrants to face the street and adjust all valves. to ground level.
$100
8. Fill and level soil behind the. curb and sidewalks. $0
9. Paint water and sewer service markers to indicate the type of service (blue or
green). $50
10. Lower the blow-off valves into a meter box. $200
11. Remove and replace colored sidewalk ramps. Use a stronger color mixture
that. produces a brick red coloring: $3000
12. Remove the wooden form on the back side of the first driveway on Remington
Court (northeast corner lot). $0
13. Remove trees at ends of driveways where it is obvious they have to come out
to construct the house. driveways. $0
14. Remove broken concrete and truck washouts from behind the curbs. $0
15. Remove dead or broken trees from behind the sidewalk on Alexandria. $200
16. Remove the silt from the culvert at AlexandriaJBarron Road intersection.
$100
17. Grade the Barron Road ditches upstream and downstream of Alexandria. $200
18. Fill the subsided area around sanitary sewer manhole #3R. $50
19. Uncover the butterfly valve vault on Barron Road. $200
20. Change the manhole lids an the storm sewer system at Station 18+57 and
Station 21+67. Existing lids are far the sanitary sewer system. $100
21. Install manhole ring and cover on storm sewer at Station 24+77. $200
22. Install the ring and grate: inlet at Station 27+10. $200
23. Adjust sanitary sewer manhole elevations at future crossing of Alexandria to
existing ground surface elevations. $500
24. The area south of future Southern Plantation Drive does not appear to be
graded as shown on the plans. Check elevations. There is no channel to drain
water from the intersection of Southern Plantation and Alexandria Drives. $0
25. Verify the ground elevations near the outfall of box culvert at approximately
Station 30+00. $0
26. Clean out silt from the box culvert and backfill around. the headwall at the
detention pond. $1000
27. Shape the downstream channel from the box culvertoutfall. $300-
28. The top elevation of the earthen dam on the detention pond is not carried
around on the .east and west legs. These must be raised to elevation 293.50.
$550
29. Install dry rip-rap at the box culvert outfall (Station 31+20) as shown on the
plans. (see #5 above)
30, Install dry rip-rap at the detention pond outfall. (see #5 above)
31. Construct the earthen spillway on the detention pond dam. $1000
32. Shape the upstream and downstream channel atthe pond outfall. $600
33. Install the End-of--Road markers on Alexandria. (completed)
34. Level around. the manholes on the north side of Barron Road imthe future
subdivision. $100
35. Install a section of silt fence across the dead end of Cardinal Lane. $100
36. Sweep streets, driveways, and sidewalks. $500
37. General clean-up of debris. and construction materials.. General leveling of the
entire site. $0
38. Apply fibermulch seeding on all exposed areas except along the cul-de-sacs
where house construction will begin shortly. $8500
Total value of all remaining work = $21,730
02/19/99 11:15 ^C 98460731
FIP~ST s
B~Nx~
PO Box 1033 Bryan, Tx 77805
] 111 Briarcrest, Bryan, Tx 77802
(409)2&0-4303
FAX (409846-1237
FAB - &fAIN
FAX OVER SHEET
DATE: 19 February 1999
TO: Natalie Ruiz
764-349b
FROM: Judy G. Clark
RE: Edward Froehling
Letter of Credit No. 145
The original letter will be mailed to you today by our note department.
If you have any questions, please call
NUMBER OF PAGES INCLUDING COVER SHEET:
~ ool
02/19/99 11:16 x`98460731 FAB - DfAIN X1002
` ~ FIKST
,,
a~ ~~~ ~ BAl`IK`~
IRREVOCABLE LETTER OF CRED}T
NO. 145
Amount - $21 ,730.00
February 19, 1999
BENEFICIARY: City. of College Station
P 0 Box 10230
College Station, Texas 77.842
All drafts hereunder must be marked: Drawn under Letter of Credit No. 145 and the amount
endorsed on the Letter of Credit
Re: Edward Froehling
Gentlemen:
We hereby authorize you to draw on First American. Bank, SSB, by your drafts at sight for any sum
or sums not exceeding a total of $23,730.00 for the account of Edward Froehling. Partial drawings
will be permitted.
All drafts, as referenced above, are to be accompanied by the beneficiary's original Letter of Credit
nder re resent .amounts remainin un aid
and a si ned statement,. certifyin that drafts drawn hereu p 9 P
g 9
for goods and services delivered for the account. of Edward Froehling: If a partial drawing is
presented and paid, the oi•iginat Letter of .Credit will be returned to you. If your drawing exhausts
~~ the outstanding balance, the Letter of Credit will be retained by us.
We hereby agree with drawers, endorsers and bona fide holders of drafts drawn under and in
compliance with the terms of this credit that such drafts will be duly honored upon presentation to
First American Bank, SSB, if presented on or before the expiry date of February 19, 2000, 3:00
p.m. Central Standard lime. This letter of credit is non-transferable.
This. credit is sub}ect to the Uniform Customs and Practice for Documentary Credits {1993 Revision}
International Chamber of Commerce Publication No. 500.
Very truly yours,
Firs merican Bank, SSB
/ ~~ ,~- ..
,,/ Joe G Salvato
Executive Vice President
JGSlcnb
ohF\e ~~
a
~EFS~ Ar~aer?~~n ganit, ~B~
? ? '3 7 13!•iarci'°st Drive. ~r}-a~, i'ei<aS 77H02 (409} X60-300 P.~. rox ' 0?3 Aryan, -e±<as 7 7805
Nlenber `D!C
atalie Ruiz - shenandoah..p _ ::;:
From: Veronica Morgan
To: Natalie Ruiz
Date: Fri, Jan 29, 1999 1:00 PM
Subject: shenandoah ph 6
natalie, please place the following email in the shenandoah 6 file. I talked with mike mcclure re: impact
fees in shenandoah 6. they DO NOT owe impact fees for phase 6. early on in the design it was
designed to go to the impact fee line. the design was changed during the review of the finai plat and i
forgot to change it on the staff report. vern reminded me that the design was changed. i have called. both
mikemcclure and Haney froehling with this information.
i have cc's on this to remind those that impact fees MAY be due on phases 7-10 so dont forget to check
on each individual phase. bottom. line if it sewers to oakgrove-cypress meadow it is not in the impact fee
area, if it sewers to thee. existing shenandoah it is in the impact fee area.
CC: Jane .Kee, Jeff Tondre, Jessica Jimmersorr, Sabin...
~ ~.a~~
.. - ~-~ ~~
5.
~~~MINIMUM REQUIREMENTS FOR FINAL PLATS
~~1~' ALL CITY ORDINANCES MUST BE MET
INCLU~ING BUT NOT LIMITED TO TFIE FOLL WING:
(Requirements based on field survey and marked by monuments and markers)
~°'~ 1. Drawn on 24" x 36" sheet to scale of 100° per inch.
v'CY a~ vicinity map .which includes enough of surrounding area to show general location of
subject :property in relationship to College Station and its City Limits. No scale requred
but include north arrow..
2. Name & address of subdivider, recorded owner, .planner, engineer and surveyor.
~~ 3. Name & address of all lenders on the property.
~...-fl ~~ 4. Name & address of all easement holders.
t.~~'`~/5. Proposed name of subdivision (not spelled or pronounced similarly to any other subdivision
in Brazos County, Texas).
L-`~ 6. Date of preparation, scale in feet and north arrow.
'-'"6~~ 7. Application fee.
'7
~6d~--®-'~ • 8. Construction documents on 24" x 36" sheets.
/Q'~~ 9. Paid tax certificates from City of College. Station, Brazos County and the C.S.LS.D.
""~~ 10. Total area intended to be developed.
'~''/~' 11. Subdivision. boundary lines indicated by heavy lines.
~C5 12.Certificate of Ownership & Dedication;
~-~'Certificate of Surveyorship and/or Engineer;
--Certificate of City Engineer;
..- Approval of Commission;
,G~~pproval of City Council;
Certificate of the County Clerk
~ (Owner(s)' signature(s) must be in place before taking plat to P&Z for consideration).
'~C~ 13. Number of lots.
"rC3~ a. number of lots by Zoning District.
~b.~average acreage of each residential lot by Zoning District.
`-~~ 14. Approximate area of street rightmof--.way.
(,.,_- la' S. Proposed parkland dedication information.
16. Requested oversize participation items, if any.
17. Location of the One Hundred Yr. Floodplain according to the most recent available date.
~~ 18. If more than 1 sheet, an index sliest showing entire subdivision at a scale of 500 feet per inch.
~~~' ~' z/
~,
!~ 19. Exact location, dimensions, name and legal description of all existing or recorded streets,
alleys, reservations, easements or other R.O.W. within the subdivision, intersecting or
contiguous with boundary or forming boundary with accurate dimensions, bearings or
deflection angles and radii, area,. center angle, degree of curvature, tangent distance and
length of all curves.
~-"~'' 20. Same information for proposed streets, alleys, etc. as .preliminary plats.
21. Lot corner markers and survey monuments (by symbol) and tied to basic survey data.
~'~ 22. ~ Street,. alley,_and sidewalk plans,'profiles and sections, with specifications and detail cost
- / estimates.
L~' 23. Sanitary sewer plat with 2 foot contours, plan and profile lines, showing depth and grades,
with cost estimates.
Cy'~ 24. Water line plat showing fire hydrants, valves, etc. with specifications and a detailed cost
estimate.
25. Storm drainage system plat with' 2 foot contours, street lines, inlets, storm sewer and
drainage channels, with profiles and sections, and showing drainage and runoff areas, and
runoff based on 5, T0, and 25 year rain intensity. Detail drainage structure design and
channel lining design if used, with specification and detail cost estimate.
~~ 26. Street lighting plan showing. location of lights, design, and with specifications anfl detail cost
~Q ~ estimate.
,('~~V~,la`" 27. Submit a statement addressing any differences between the final plat and approved Master
Preliminary Plat & Plan.
,~~~ 28. Indicate :any variances requested and reasons for same.
/'~~ 30. Are there impact fees associated with this development?
~° 31. Add a general note that. no private sewage facility maybe installed on any lot in this
/~ subdivision without the issuance of a license by the Brazos County Health Unit under the
:provisions of the private facility. regulations .adopted by -the Commisstoners Court of Brazos
County, pursuant to the provisions of Section 21.004 of the Texas Water Code.
t~s .
From: Deborah Grace
To: Lance Simms, Lisa Hankins, Melissa Rodgers
Subject: Shenandoah Phase VI
Veronica wanted me to send this a-mail telling you that on this phase of Shendandoah you can go a head
and collect sewer tap fees but hold the work orders until further instructions. Got any questions please
direct them to Mr. C.
Grace
764-3784
CC: Jim Callaway
McCLURE ENGINEERING, INC.
February 18, 1999
Ms. Natalie Ruiz
Development Coordinator
City of College Station
P.O. Box 9960
College Staton,,Texas 77842
Re: Shenandoah Subdivision, Phase b
Dear Natalie:
The. construction of~Shenandoah Subdivision,. Phase 6 is nearing completion and
the developers, Ed and Nancy Froehling, would like to post a Letter of Credit for the
remaining work so they can begin obtaining. building: permits. I have worked. with Bob
Mosley and Vern Wright to develop the attached list of items in the subdivision that are
not completed. With their- help I have also estimated a value: of $21,730.00 for that work.
The. crew fromthe City's Wastewater Division has notyet performed the
television inspection of-thee sewer system. According: to Mr. Mosley, that inspection
should be completed in approximately two weeks.. To prevent unnecessary delays to the
developer, Mr: Mosley indicated that: he would allow the plat to be filed and building
permits issued with the understanding that no sewer connections would be made until the
inspection was performed. That: is an acceptable condition as long as the inspection can
be performed in approximately two weeks.
Mr. or Mrs.. Froehling. will bring the Letter of Credit. by your. office soon. We
request that the plat be filed as quickly as possible after that. Thank you.
Sincerely,
Kent Laza, P.E.
Project Manager
~~dl-~: ~-eX2~e--,
1722 Broadmoor, Suite 210 Bryan, Texas
`a'~~ ~~~
o~-
~~tC~
/ ~a~, -~
~ /l / ~ MGCGVlG. ~ ~SC 7°
l ~RST
~r~- ~ ~~ ~
~~ ~ ~ w~ ~ ~ ~~ ~
,~~ ,~,~~- ~`' `fig
~~~ ~ C~ ,D~y a /6
P" `
p
~"
F':.
°~!~~t4oo~e~~r~
V R :•1
~ w j ~~
'~, a
I
~ '+~ ::
~ i
~, F
I + ~,
~'.
2
V •,'Si
~~ ~ ~~ i~~ ~~~~ ~ •,~•, ',fin
~.'
~r .4 s~. ~~~ ~ ~ ~~
r ` f`