HomeMy WebLinkAboutMiscellaneousLETTER OF COMPLETION CITY ENGINEER CITY OF COLLEGE STATION COLLEGE STATION, TEXAS DATE' 6-17-98 RE: COMPLETION OF Edelweiss Phases 12,13, and 15-A Dear Sir: The purpose of our letter. is to request .that the following listed improvements be approved .and accepted as being constructed under city inspection .and completed according to .plans and specifications as approved and required by the City' of College Station, Texas. This approval and acceptance by the City is .requested in order that we may finalize any sub-contracts and to affirm their warranty on the work. This approval and acceptance by the City of the improvements listed below does hereby void the .letter of guarantee for the listed .improvements on the above referenced. project.. The one year warranty. is hereby affirmed and agreed to by Young Contractors and by their sub-contractors. as indicated by signatures. below. WORK COMPLETED L«sL CDUA.'j` Celia loop, Celia Ct. ,'~'''' ""-` " "' • ,Sophia Lane storm sewer sanitary sewer water GDEi~l~lss .4v~., F~eaM F'1{~.5~ 1 T~ 1~~,13J a~ Atfhs~ 13 /tr,Z'~ f'i~+9~~IE Utility Representative (s) DATE lv Z`3 ~'~ i~ /~ f~ APPROVAL ~t St~v~ ~~~~k~ ~~~~T~~~CEk Owner: Begonia Corporation Address:. ~~~ S: 7"~titfi ~ l~~ ~ .~~1 i~ 1uG~ '~~~~~J ~ ~r~~~ Contractor:Young Contractors Address: m.wiizieaae O 0 ~~~~~~e~n ~~ TATION LLEGE S C® R O. Box 9960 1101 Texas Avenue College Station, TX 77842 Tel: 409 764 3500 MEMORANDUM TO: Mike McClure, P.E., R.P.L.S., McClure Engineering , FROM: Natalie Ruiz, Assistant Development Coordinat r DATE: March 30, 1998 RE: Edelweiss Estates Phase 15-A Staff reviewed the above mentioned final plat and identified no problems. Please submit the mylar original and 10 copies of the final ..plat by noon Monday, Apri16, 1998 to be included on the April 16, 1998 Planning and Zoning Commission meeting. The Commission meeting will be held at 7:00 p.m. in the City Hall Council Room at 1101 Texas Avenue South. If you have any questions or need additional information, please call me at 764-3570. Thank you. Attachment cc: Steve Arden, Brazosland Realty, 4103 South Texas Avenue #100, Bryan, TX 77802 James O. Crowell, Begonia Corporation, 1901 San Jacinto, Houston, TX 77002 ~ase file #98-213 Home of Texas A&M University ENGINEER'S CONSTRUCTION COST ESTIMATE Edeiwiess Estates Phase 15A :March'! 8, 1998 it U Amount Item Descrip#ion Unit Quantity n Price No. STRE ET CONSTRUCTION 1 Erosion & Sedimentation Control L.S.. 1 $750.00 $750.00 . 2 Clearing & Grubbing L.S. 1 2,000.00 2,000.00 3 Roadway Excavation C.Y. 1,317 3.55 4,675.35 4 . Cellulose Fiber Mulch Seeding S.Y. 2,500 0.30 750.00 5 6" Lime Stabilized Subgrade (6% Lime) S.Y. 3,537 3.00 10,611.00 6 Extra Lime Ton 24 73.00 .1,752..00 7 6"Flexible Base Crushed Stone S.Y.. 2,839 5.75 16,324.25 8 l%' Hot Mix Asphaltic Concrete (Type D) S.Y. 2,839 4.05 11,497.95 9 Conc. Curb {Type 3) Reinf L.F. 1,783 6.50 11,589.50 10 . Concrete Sidewalk & Ramps Reinf S.F. 1,540 2.53.. 3,896.20 11 . End of Road Marker e 4 curb /T A R " Ea. S.F. 3 620 121.00 3.15 363.00 1,953.00 12 yp pron w eim. Conc. Thick. 6 STREET CONSTRUCTION SUBTOTAL $66,162.25 DRA INAGE CONSTRUCTION 13 5' Std. Recessed Conc. Inlet Each 1 $1,800.00 $1,800.00 14 . 10' Std. Recessed Conc. Inlet Each 3 2,650.00 7,950.00 15 27" RCP (C-76, Cl. III) L.F. 398 38.00 15,124.00 16 27" X 45° RCP Bend (C76, Cl. III) Each 1 240.00 240.00 17 18" RCP (C76, Cl: III) isting 27°' RGP t to E ' & C Pl L:F. L.S. 31 1 29.00 250.00 899.00 250.00 18 x onnec i ug Remove DRAINAGE CONSTRUCTION SUBTOTAL $26,263.00 WA TER LINE CONSTRUCTION 19 6" PVC{C900, Cl. 200) Pipe L.F. 604 $12.50 $7,550.00 20 8" PVC (C900, Cl. 200) Pipe L.F. 381 15.00 5,715.00 21 Fire Hydrant Assembly (Type In Each 2 1,800.00 3,600.00 22 2" Blow-off Assembly with 6" :Cap Each 1 470.00 470.00 23 2" Blow-off Assembly with 8" Cap Each 1 475.00 475.00 24 .Remove Blow-off & Connect to Existing 8" PVC Line Each 1 550.00 550.00 25 6" M.J. Gate Valve Each 1 412.00 412.00 26 8" M.J. Gate Vave Each 1 612.00 612.00 27 8" X 6" M.J. Tee Each 1 200.00 200.00 Page 1 of 2 'i ~` ENGINEER'S CONSTRUCTION COST ESTIMATE Edelwiess Estates Phase 15A March 18, 1998 .Item Description Unit Quantity Unit Amount No. Price 28 6" X 13" M.J. Anchor Coupling Each 1 98.00 98.00 29 8" X 13" M.J. Anchor Coupling Each 1 180.00 180.00 30 1" Type K Copper Water Service (72' Length) Each 1 525.00 525.00 31 32 1 %2" Type K Copper Water Service (3T Avg. Length) Trench Safety (Water Lines) Each L.S. 4 1 790.00 SUU.UU 3,160.00 50U.UU WATER LINE SUBTOTAL $24,047.00 SEW ER LINE CONSTRUCTION 33 6" PVC (SDR-26, D3034){< 6' depth) L.F. 90 $15.00 $1,350.00 34 6" PVC (SDR-26, D3034){6' to 8' depth) L.F. 331 , 16.00 5,296.00 35 6" PVC (SDR-26, D3034)(8' to 10' depth) L.F. 250 18:50 4,625.00 36 6" PVC {SDR-26, D2241)(6'to 8' depth) L.F.. 20 1.6.00 320.00 37 Std. 4' Diameter Manhole (< 8' depth) Each 3 1,330.00 3,,990.00 38 Std. 4' Diameter Manhole (8' to 10' depth) Each 1 1,520.00 1„520.00 39 4" Double_Service Line (Type I)(47` Avg. Length) Each 2 800:00 1.,:600.00 40 4" Double Service Line (Type II)(8T Avg. Length) Each 2 900:00 1;800.00 41 42 4" Single Service Line {Type I){4T Length) Trench Safety{Sewer Lines) Each L.S. 1 1 775.00 l,000.OU 775,00 ' 1UOU.UU . SEWER LINE SUBTOTAL $22,276.00 TOTAL ESTIMATED COST OF CONSTRUCTION $138,748.25 ~`~ a ~`~°'` "~'~l A ~~ 6~ ; '~ o r,~ o ~. Page 2 of 2