Loading...
HomeMy WebLinkAboutMiscellaneous .;I.- ..-'a !VIA Final Plat Checklist (For Submittal .Acceptance) ~ Plat ~ Engineering Drawings (with ALL details) . water . sewer . streets . drainage (including detention, ifapplicable) . erosion control ~ Drainage report per drainage ordinance !Jilt 0 N/A 0 tt'X4 0 pa- 0 Formal Oversize Participation Request Figures based on Engineer's Estimate (ifapplicable) $300.00 Subdivision Inspection Fee $100.00 Drainage Development Permit Fee & COIl}pleted Application SoilTesting Fee Schedule (as established by. Engineer of Record) & Fee ..... ~, ~, ~ JV~~ ~/'_'~ ,. From: To: Date: Subject: Jane Kee nruiz, svolk, vmorgan 3/26/98 1 :52PM Graham Rd. School plat when the final plat comes in next week or whenever (before next Thurs.) it will show the entire property but only Phase One, lot 1 block 1 will be within a bold line. The new line between the lot to be final platted and the rema.inder will be described and there will be dimensions along the sides to this new line. They will not rewrite a metes and bounds descrition for the phase one lot. The document will look the same when they final plat Phase 2 lot 2, block 1 except the title block will change and the bold line will move. Is this clear as mud??? If not, just holler at me when the plat comes in and I'll look at it. I have a picture burned in my brain. ~,,~~~~~= I ~ PLAT 14L~ \ : t.fk-hfj