Loading...
HomeMy WebLinkAboutStaff Report__ STAFF REPORT Item: Public hearing and' consideration of a City initiated rezoning of the South Hampton Subdivision, a 52 acre single family subdivision located at the southwest corner of Nantucket Dr. and SH 6 from R-1 Single Family to PDD-H Planned Development District - Residential. Item Summary: This property was recently rezoned to R 1 Single. Family after. a master plan was approved. showing. l 15 single family-lots ranging in size from.1/4 to 1/2 acres. The minimum lot size in R-1 is 1/8 acre. If the property remains R-1, the lots could be subdivided in the future into even smaller lots. The PDD is a new district that ties the zoning classification to a particular development plan. This PD district ties the developer of South Hampton and any future owner/developer to the plan that was approved. Any further subdividing or changing of the street layout would require another rezoning process and therefore involve two public hearings. The plan presented with this PDD contains the following: • 109 single family lots, • residential and collector street layout as shown with one access onto Nantucket Dr., • 39 foot wide collectorstreets -Sand Dollar, Sconset from Wayfarer to SH 6, Cranberry Ct., Ebbtide Loop, Bay and Wayfarer, • 27 foot wide streets are the remaining cul-de-sacs • two buffer areas along SH 6 (75') and Nantucket Dr.(40'). These areas will be maintained by the individual property owners. Any yard fences will be built on the buffer line rather than the right-of--way line. Additional. tree planting will be encouraged in the buffer areas. • lots LR1,2,3 will be given to the Nantucket HOA for maintenance. These lots are for signage and. landscaping for the Nantucket subdivision. • setbacks will be the standard R-1 setbacks with the following exceptions as shown on the plan: Those. lots where drainage is along the rear, then the setbacks will be 10 greater than the drainage easement which will be a fixed dimension at the time of final .platting. For lots backing up to SH 6 shall have a 100 foot rear setback (25 feet in addition to the 75 `buffer). In Phase 5 the lots that side on SH 6 will have that side setback of 85 feet {10 feet in .addition to the 75 foot buffer) Lot 1 block 1 Phase One -setback is the'buffer strip. Lots backing up to the buffer on Nantucket will have a rear setback of 50 feet (10 feet from the buffer) • .Sidewalks as per the .subdivision regulations (on both sides of collectors,and none on cul-de-sacs). Variance is being requested to place only one sidewalk on the east side of Sand Dollar Cove because the west side fronts the larger lots in the ETJ. o`.\group\deve_ser\stfrpt\97-119,doc The developer may dedicate more right-ofwayahan called for in the subdivision regulations for. the particular type of street proposed. This is due to the drainage system used. The developer will be tying into_the existing ditches in Nantucket and thus needs to dedicate additional right-of--way to cover the pavement, curb & gutter, sidewalks and ditches. Typical urban street sections do not have ditches to carry the drainage.. There are curbs and gutters and underground storm drains which require less right-of--way. ,Policy Issue Statement: Civic Pride Citizens benefit from well-planned, attractive residential and .commercial areas, and. from preserving historic. areas. Item Background: The rezoning and platting of South Hampton was a controversial case with much opposition. At the time Council approved the rezoning to R-l, staffwas directed to initiate rezoning to PDD once the PD district ordinance was approved. Budgetary & Financial Summary: NA Staff Recommendations:. Staff recommends approval of PDD-H subject to Council approval of the PD district ordinance and subject to staff determination of appropriate right-of--way widths based on design once he drainage report is complete. Related Advisory Board Recommendations: NA City Attorney Recommendation/Comments: NA Commission /Council Action Options: Approve, approve with conditions, deny or table the rezoning.. Supporting Materials: 1. Location Map. 2. Application 3. Engineering Information and Notification Information 4. Master Development Plan o:\group\deve_ser\stfrpt\97-119.doc ,,,. ENGINEERING Water:: There is no City of College Station water service in this area. This property is currently served by Wellborn water supply. The City of College Station will be discussing the opportunity to serve this area with Wellborn Water Supply. Water distribution .will need to be sized and designed to. the City of College Station standards in order to provide adequate fire protection to the area. Sewer: There is no City of College Station sewer service in this area. This property is served by a private waste water treatment package plant. There is discussion at present regarding the creation of a sanitary sewer impact fee area which .would include Southampton.. The capital improvement plan includes the construction.. of a large trunk line to serve this area but does not include the development of the. collection system. Streets: Streets are as outlined in the body of the staff report. Off-site Easements:. NA Sidewalks: Sidewalks will be required per the City's subdivision regulations. Drainage: The applicant is preparing an engineering drainage report that will show how they are complying. with the City of College Station Drainage Policy and Design Standards Manual. Flood Plain: The latest Federal Emergency Management Agency (FEMA) Flood Insurance Rate Maps show that no portion of the subdivision is located within the Regulatory 100 Year Floodplain. Oversize request: None. Parkland Dedication: Parkland dedication will be paid at time of final platting at $225.00 per lot. Impact Fees:. None in the area at this time. NOTIFICATION: Legal Notice Publication(s): 26, 1997 The Eagle; October 22, 1997 and November Advertised Commission. Hearing Dates(s): November 6, 1997 Advertised Council Hearing Dates; December 11, 1997 Number of Notices Mailed to Property Owners Within 200': 63 Response Received: None as of date of staff report o:\group\deve_ser\stfrpt\97-119. doc ~, q STAFF REPORT Item:. Consideration of a proposed master preliminary plat for approximately 65 acres located in the Nantucket Subdivision, .generally located on the southwest corner of Nantucket Drive and State Highway 6, including Phases 6 - 12 and Leisure Island Phases 1 - 3.(Planning Case No. 97-312) A related item for consideration is a rezoning request of approximately 6 acres, out of the above 65, located in the 15 00 block of Nantucket Drive, along the south side of Nantucket Drive, approximately 400. feet west of SH 6 from A-0 Agricultural Open to R-1 Single Family. (Planning Case No. 97-108). Item Summary: This preliminary plat covers 65 acres of land, approximately 13 of which are outside the city limits.. The: intention is for single family .development. Last year part of this property was annexed into the City at the request of the property. owners. The developer's intention is to build out Nantucket Subdivision with residential lots that.will be in the City Limits and connected to City sewer through an impact fee line. There is opposition to this master plan and the associated rezoning due to the smaller lots being proposed. The overall density in Nantucket right now, not including the Leisure Island section .averages approximately 2 acres per lot'. The density of the Leisure Island. section averages .17 acres per lot, The average density of the new phases is .41 acres per lot. The average overall density of all existing and proposed phases is 1.4 acres per lot. The proposed land use plan shows this ...,area for low density single family development with a density range of .5 to 3 acres per dwelling unit. The overall average density of Nantucket with the proposed newphases .falls within this range at 1.4 acres per lot. Opposition centers on the perceived change in character of the neighborhood when lot sizes have .historically fallen at the lower end of the range while the new proposed .phases show lot sizes nearer the upper end and outside the range. The applicant has also offered to submit for review a drainage report for the entire master plan with the first final plat to ensure there will be no .impact to the existing phases outside the City limits from these: new phases. Policy Issue Statement: Civic Pride Citizens benefit from well-planned, attractive residential and commercial areas,. and from preserving historic areas. Comprehensive Plan GoaUObjective Statement• Goal # 3 -College Station should continue to protect, preserve and enhance existing and future neighborhoods. Objective 3.1-College Station should continue to protect the integrity of residential areas by minimizing intrusive and incompatible land uses and densities. Item Background: Nantucket was originally master planned in 1983 to be a large lot rural subdivision with commercial and office acreage up near the highway. Development began to occur toward the back of the subdivision initially. The frontage along-the highway has yet to-develop. The intention is tochange from the one acre commercial /-office lots fronting on the highway to o:\groupldeve_ser\stfrpt\97-312.doc L 6 - .-__.. _ ' single family lots that will range from .22 to .58 acres per lot with a landscaped buffer along the ~'~ highway. The first two phases of Nantucket averaged 2 to 2.6 acres per lot. Subsequentphases ranged from .8 to 1.5 acres per lot. Leisure Island is an 18 acre. area that was, and still is, intended as' a smaller lot "retirement" phase where the lots will average about .17 acresper lot with private streets. Part of Leisure-Island is developed at present.: Leisure Island and the existing phases of Nantucket are still outside the City Limits. Budgetary & Financial Summary: NA Staff Recommendations: Staff recommends approval due to compliance with the land use plan and the fact that the average density falls within the accept~.ble range shown on the land use plan and with the. following condition: The applicant successfully rezones each phase to comply with the zoning regulations prior to submitting a final plat of that phase. The applicant has offered to plat a minimum seventy-five (75') foot deep treed buffer easement along the entire SH6 frontage when these phases. are platted.. Related Advisory. Board Recommendations: NA City Attorney Recommendation/Comments: NA Commission Action Options: Approve the preliminary plat as submitted or with conditions or deny the plat with stated reasons for denial. Supporting 1Vlaterials: - - - 1. Location Map 2. Application 3. Engineering Information and Notification Information 4. Presubmission Conference Report or PRC report 5. Letter Requesting Variances o:\group\deve_serlstfrpt\97-312.doc ENGINEERING Water: This property is currentlylocated with Wellborn Water's service area. The City. will have to negotiate a contract with Wellborn.. Water in order for the City to ervice this' area. At the. present dime, Wellborn Water will be .responsible for. providing domestic water. Sewer: The City is in the process of creating. an impact fee area for this area of town. A sewer line must be extended from he Pebble Creek area under State Highway 6 in order for any phase of Nantucket within the .city limits to have public sewer service. Streets: This property, has access to Nantucket Drive, a collector street and the State Highway 6 frontage road, a major arterial. The developer has requested a variance to the right-of--way requirements for the strcets within ~#his plat. 'They propose to construct a residential street within a collector right-of-way and a collector within an arterial right- . of-way. The purpose for tlus request is to be able to contain.. the 100 year storm within .the right-of--way as required in the City's Drainage Policy and Design Standards.. Staff supports this vvariance request because it exceeds the minimum.. requirement for right-of-- way widths and it provides for compliance with the Drainage Policy. Please .see the attached letter requesting this variance. Off-Site Easements: Not applicable. Sidewalks: A sidewalk will be required on one side of the following streets: Street. Mariners .Cove Sand Dollar Cove Ebbtide Cove Windri$ Cove Cranberry Court Sconset Cove Location From Harpers Ferry Road to Sand Dohar .Cove From Nantucket Drive to Mariners Cove From Nantucket Drive to Cranberry Court From Nantucket Drive to Cranberry Court From Windrift Cove to Ebbtide Cove From Wayfarer Lane to 20 foot pedestrian easement There shall also be a sidewalk located within a 20 foot pedestrian. easement. that extends from Cranberry Court to Sconset .Cove. The applicant has requested a variance to the subdivisionregulations to remove the sidewalk requirements for various streets within this subdivision (see attached etter). The following streets will require a variance: Street Location Beacon From State Highway 6 to Sconset Cove Wayfarer Lane From State Highway 6 to the boundary of Phase 11 Staff supports this variance request because of the rural characteristics of the adjacent street sections. Drainage: A .drainage report will be required .for the entire master plan to ensure that there are no impacts to the surrounding properties. Flood Plain: According to FEMA Flood Hazard Maps, this property is not located within the 100-year flood plain. Oversize Request: The. developer is requesting oversize participation for the sewer line that extends southward along State Highway 6. o:\group\cleve_ser\stfrpt\97-312. doe i_. '~ - ____ __ __ ___ __ Park Land Dedication: The developer will be required to pay a parkland dedication fee in lieu of land dedication. Impact Fees: This property. is subject to sewer impact fees. NOTIFICATION: Legal Notice Publication(s): Advertised Commission Hearing Dates(s): August 7; 1997 Advertised Council HearingDates: ,August 28~ 1997 .Number of Notices Mailed to Property Owners Within 200': None Response Received: 3 calls to date in opposition o:\group\deve_ser\stfrpt\97-312.doc STAFF REPORT Item: Public hearing and consideration of a rezoning of South Hampton Subdivision, 52 Acres,. ..located on the SW corner of State Highway 6 and Nantucket Drive from A-O Agricultu_ raUOpen to R-1 SingleFamily Residential (Planning Case No. 97-111) Item Summary:, This rezoning is intended for ;the developer of Nantucket to build out the remainder of what was: the Nantucket subdivision. This property was annexed into the City at the request of the property owners in 1996. The developer's intention is for urban residential lots at a density that` is higher than permitted by the present zoning. Present zoning is A-O which is an interim classification placed on property upon annexation. Single family residential development is allowed in A-O with minimum lot sizes of 5 acres per dwelling unit. Single family residential development is allowed in R 1 with a minimurrl lot size of 5,000 square feet per dwelling unit. Other single family residential zoning districts include; R-lA -minimum 4,000 SF .lots A-OR -minimum one acre lots A-OX - minimum two acre lots The approved plat can be developed only once an acceptable .zoning .classification is placed on the property.. The plat does not meet the minimum requirements of the current A-O district. R-1 single family zoning would. allow this development, but would also. allow much smaller lot sizes than proposed. With the granting. of R 1 zoning, the City would be obligated to approve any future changes in the plat as long as they meet the R:' 1 restrictions. The PUD zoning is the only district where the zoning and plat are tied together and thus the only one where-any changes to the plat would have to come back before both PNZ and Council through the public hearing process. These changes would be part of a .rezoning and therefore, both bodies would have more discretion in review and consideration. However,,the land use ratios required in the PUD cannot be met with the approved plat. This leaves the R-1 district as the only oxie that ..will accommodate the approved plat at this ime. Policy Issue Statement: Civic Pride -Citizens ..benefit from well-planned; attractive residential and commercial areas, and from preserving historic areas. Comprehensive Plan GoaUObjective .Statements: Land Use Goal # 3 -College .Station-should continue to protect, preserve and enhance existing and future neighborhoods. Objective 3.1 - CollegeStation should continue to protect the integrity' of residential areas by minimizing intrusive and incompatible land uses .and densities. Housing Goal # 1-College Station should continue to provide an appropriate supply of housing with a wide variety of housing types and costs. Item Background: A Master. Preliminary Plat showing lot sizes ranging. from a quarter of an acre to just over one-half acre was submitted to the PNZ at their 8-7 meetings. The plat showed 3 streets accessing Nantucket Drive. After much opposition and discussion, action on the plat was o:\goup~deve_ser~trpt~97-1 l l.doc deferred until the; next meeting to give .the residents of Nantucket and the developer more opportunity to resolve differences. Changes were made to the plat where access was no longer taken to Nantucket Drive, landscape buffers were shown along the highway and Nantucket Drive, but density remained the same with a loss of only 3 lots. This plat was denied by the Planning & Zoning Commission (5-2 vote) at their August 21st meeting. Opposition came from Nantucket residents and centered on the smaller lots being proposed. The overall density in Nantucket right now, not including the Leisure Island section averages approximately 2 acres per. lot. The density of the Leisure Island section averages .17 acres per lot. The average density of South Hampton is .46 acres per lot. The average overall density of Nantucket and South Hampton together is 1.5 acres per lot. Residents perceived a change in the character of the neighFiorhood when lot sizes have historically fallen at the lower end of the range while the.. development shows lot sizes nearer the upper end. and even outside the range. Residents also felt that Nantucket had always been advertised as a large lot rural single family subdivision and that smaller lots were contrary to this representation. Residents felt the integrity of their neighborhoodwould be violated with the change to lots this much smaller. They did indicate at they final hearing`. that 1/2 to 3/4 acre lots, although' smaller than those presently in Nantucket, would be more desirable. The Master Preliminary Plat then went to Council on 9-11 and was approved by a 5-1-1 vote (one in opposition and one abstention). Land Use Plan The proposed land use. plan reflects this area for low density single family development with densities ranging from .5 to 3 acres per dwelling unit. The overall average density of Nantucket and South Hampton together falls within this range at 1.5 acres per lot or dwelling unit. Budgetary & Financial Summary: N/A Staff Recommendations: Staff recommends approval due to compliance with the land use plan and the fact that the average density falls within the acceptable range shown on the land use plan. Related Advisory Board Recommendations: N/A City Attorney Recornmendation/Comments: Legal has approved as to form. Commission Action Options: Recommend approval; recommend approval .with conditions; recommend denial of request. The Commission may. also table rezoning or defer action to a specified date where the Commission finds needs additional information to make a decision. Supporting Materials: 1. Location Map 2. Application 3. Engineering Information and Notification Information 4. Minutes of 8-21 and 8-7 PNZ o: ~group~deve_serlst&ptV 7- l l l . doc i ENGINEERING Water: The property is not serviced by City of College Station utilities. This property outside the city limits is located within .Wellborn Water's service area. The city has applied for certification of the area inside the City limits and.it is currently pending before the TNRCC. At the present time, Wellborn Water is responsible for providing domestic water.. Sewer: The property is not serviced by City of Cohege Station utilities. The City is in the process of evaluating an impact fee area for this part of town. A sewer line must be extended fromthe Pebble Creek area under State Highway 6 in order for any phase of South.Hampton to have public sewer service. Council recently asked staff to look at stopping the sewer line before crossing SH 6 and having the developer cover this cost. Streets: Streets: 'This property has access to Nantucket Drive .(collector) via only one street that has 13 lots fronting on it. Three access points are to the State Highway 6 frontage road, a major arterial. The developer has requested a variance to the right-of- way requirements for the streets within this plat. They propose to construct a residential street within a .collector right-of--way and a collector. within an arterial right-of--way. The purpose for this. request is to be able. to contain the 100 year storm within the right-of- way. asrequired in the City's Drainage Policy and Design Standards. Staff supports this variance request because it exceeds the minimum requirement for right-of--way widths and it .provides for compliance with the Drainage Policy. Please see the attached letter requesting this variance. Off-site Easements: Not applicable. Sidewalks: Variance to the sidewalk requirements was granted at the time of the Master Preliminary Plat. Drainage:. The detention requirements for this property will be reviewed when development/redevelopment is proposed. Flood Plain: According to FEMA Flood Hazard Maps, this property is not located within the 100-year flood plain. Oversize Request: The developer may request oversize for the bore that .will be necessary under SH 6 for sewer line extension, if the impact fee line is approved but stopped short of crossing SH 6. Parkland Dedication: Will be obtained at the time of final. platting. NOTIFICATION: Legal Notice Publication(s): The Eagle; October 1, 1997 and October 29, 1997 Advertised Commission Hearing Dates(s): October 16, 1997 Advertised Council Hearing Dates: November 13, 1997 Number of Notices Mailed to Property Owners Within 200': 4, An additional 15 notices were mailed to interested applicants from Nantucket. Response Received: Although there is concern on the part of Nantucket residents as evidenced during the hearings when the plat was considered, we have not heard directly from anyone as of this report date. o:~groupkleve_serl~tfrpt197-1 l l.doc a STAFF REPORT Item: Consideration of a Final Plat for South Hampton, Phase I, located in the southwest quadrant of Nantucket Dr. and State Highway 6, currently zoned Planned Development District -Housing (PDD- H).(98-206) Item 5ummarys This phase has 8.81 acres and is divided into 20 single family lots. The plat reflects all conditions approved as part of the PDD-H zoning granted earlier this year. Special attention should be given to the engineering comments relative to water, sewer and drainage in this particular case. Water will be provided by Wellborn Water Supply Corp., sewer will provided through the impact fee -line approved recently by City Council and a variance to the drainage easement width is pending before the ZBA and should be resolved prior to P&Z consideration.. Policy Issue Statement: Civic Pride Citizens benefit from well-planned, .attractive residential and commercial areas, and from preserving historic areas. Item Background: The property making up the master planned area of South Hampton was annexed in 1996, rezoned to R-1 Single Family in 1997 and then to PDD-H in 1998. The PDD-H district ties the developer and any subsequent developers. or owners to-the master plan as it was approved with any and all conditions.. Any changes must be accomplished through a rezoning process with the associated public hearings. This latter zoning was done. to give some assurances to the adjoining Nantucket residents that what the developer was proposing was indeed what would be built. Once zoned R-1 Single Family, the property could be subdivided into the minimum size lots allowed in R-1 which is 5,000 square feet. The master plan approved as part of the PDD-H zoning shows larger lots ranging from approximately 1/4 to 1/2 acre. Budgetary & Financial Summary: None Staff Recommendations: Staff recommends approval of the final plat, with the following conditions: 1. All off-site easements are filed for record prior to construction or prior to filing the plat, whichever occurs first. 2. The impact fee line design must be completed and approved with all necessary easements granted, or an alternate sanitary sewer service provided, prior to the filing of the final plat Related Advisory Board Recommendations: N/A .Supporting Materials: 1. Location Map 2, Application 3. Engineering Information and Notification Information o:\group\deve_ser\stfrpt\98-208.doc ENGINEERING Water: Water is to be provided by Wellborn Water Supply Corp. with the following conditions as agreed to by the City of College Station Utility Department and Wellborn Water Supply Corp.: 1. The service will be metered off the 8 inch water line located at Nantucket Drive and State Highway 6 frontage road 2. Wellborn Water Supply Corp. will supply the development water through their lines 3. The developer would meet the required fire flows within the subdivision based on using the available water flow and pressures found at the 8 inch Wellborn water line 4. An interlocal agreement between the City of College Station and Wellborn Water Supply Corp. be approved prior to the filing of the Final Plat. Sewer: Sanitary sewer service. will be provided. by the 97-02B impact fee line which is currently under design. This developer will be extending that line under State Highway 6 and ~' then internall throu hout the subdivision. The. impact fee line design' .with all necessary Y g easements must be completed or an alternate sewer service provided, prior to the filing of the ', final plat. Streets: Bay Street, Cranberry Court, and Windrift Cove (from Bay to Cranberry) will be constructed as residential collectors while Windrift Cove from Cranberry Court to the end will be constructed as a residential cul-de-sac. Off-site Easements: Off-site easements will be required for drainage and utilities. All off- site easements will be required to be filed for record prior to construction or prior to filing the plat, whichever occurs first. Sidewalks: Sidewalks are required on both sides of Bay and Cranberry Court. They are also required on both sides of Windrift Cove down to Cranberry Court. Drainage: The subdivision will be all overland drainage conveyed in rear lot channels. There will be some inlets and storm drainage pipes to convey water from the streets to these channels. All surface runoff from this subdivision will ultimately discharge through a TexDOT culvert near Bay Street and into Alum Creek. 'The developer will be improving the minimum A variance re uest to the cross sections. of these channels at various locations. q M f Ad'ustments on a ith the Zonin Board o Y cessed w J drainage easement width is being pro g 19, 1:998 for various channels within this subdivision. Flood Plain; The latest Federal Emergency Management Agency (FEMA) Flood Insurance Rate Maps shows that no portion of the subdivision is located within the 100 Year Floodplain. Oversize request:. None. Parkland Dedication: Parkland dedication will be paid in the amount of $225 per lot or $4500 prior to the filing of the. Final Plat. Impact Fees: This subdivision is located within the Sanitary Sewer Impact Fee Area 97-02b. NOTIFICATION: Advertised Commission Hearing Dates(s): May 21, 1998 Advertised Council Hearing Dates: NA Number of Notices Mailed to Property Owners Within 200'.: NA o:\group\deve_ser\stfrpt\98-208. doc