Loading...
HomeMy WebLinkAboutMiscellaneousTICa STA N LLEG~ CO P. O. Box 9960 1101 Texas Avenue College Station, TX 77842 Tel: 409 764 3500 Bryan T. Tucker Cheatum & Associates 1601 E. Lamar Blvd. STE 200 Arlington, Texas 7601.1 RE: CSISD SCHOOL. PROJECTS Mr. Tucker: ~p~ ~a~~ I am forwarding you the copy of the TAMU Stormwater Management Plan that you have requested. The reproduction cost will be $23.26 and $1.92 tax for a total of $25.18. You will be receiving an original invoice in the mail. If Veronica Morgan can be of further assistance please give her a call at 764-3570. Sincerely, ~~~~ Deborah Grace Staff Assistant Development Services Department Home of Texas A&M University October 8, 1997 From: Jim Smith To: Sabine Date: 10/30/97 3:41 PM Subject: PRC -Wednesday, November 5, 1997 Parking Lot Plan -Equity Reality. (97-431): No problem with a small commercial container on wheels at this location. Conditional Use Permit -Oakwood Intermediate Shcool Additions ~ Renovations. (97-718): No problem. Should not impact current garbage collection. Conditional Use Permit -Willow Branch Intermediate School Additions 8 Renovations (97-719): No problem. Should not impact current garbage collection. Conditional Use Permit-.New Intermediate School site on Graham Road (97-720): No problem. Container location is serviceable. Preliminary Plat -College Station ISD, Braham Road School Site (97-322): No problem.. Preliminary Plat -College Station ISD, Willow Branch and Oakwood School Sites (97-321): No problem. Final Plat - Woodcreek Section 8 (97-244): No problem. Final Replat -Richards Addition (97-245): No problem. Final Plat -Dartmouth Crossing (97-246): No problem. Thanks. Lots of "stuff'!! May-07-99 O4:36P CSISD Construction Svcs 409 645612 P.O1 - ~l(~ ~, ~ ~ (~~ ~ . ~~ ~ ~ ~..~ ~ ~- ~~~- Tri Natalre RutL 1 ax: 4Q9I764-3496 Yttgcs: 1 ~ -~ note: Mr~y ~, i 999 . , Cl C~~Q%~ -~~.. From; 13111 Savage -CSISD Construction Services ~~~ ~,~ ~%~:> ~~ l have not had much success eontzeting you or ~ronica Margau this week. Uur L: moil liiilcci ~ ~ ' sand you have been very busy. C)ur need i5; ~ tatus of'our request for variance ii> tlic stortrt ~~° water detenticm pond at Cypress t~rovc intermediate Schoc>], ~ We needta schedule ~t rnectin~~2~ with your,taff to define the rccluirentents we must meet to constrttct the relocated parking 1 tat (,~~~' the JY ot'Iice un andcrson street resulting liom the strrvet removing the ~xisti:ng parkin„ brief description cif the ci~mmcnts sent to Cheatham regarding the ~ictention Bond f'or C)aku~rfc}d t3nd Willow Brandt, (status of ccfnditional use pertnii for A&M C.'onsolidated Midcllc School. Cypress Grove lntenn`.daite School is scheduled fir substantial completion within two ~~eLks and occupancy will follow by first al'Juttc. A.cklatn C:imsttvctivn Company, irtc is needing a bttildittg permit to si~irt constrttctioti i,l'thc new .4&M C'crosalidated Middle Schoal at the existing Willow Branch School. C'.ity is rcduesting value ofparking lot. at JY o[~ftcc to close c}ut purehtttie of property for Attc{ersar~ Street right of way. We can not complete the estimate without in pu.t trnn~ yot.u~ ~,ri~up. W'e nr.ed a mectin~ to establish a basis for ~reparinl; our estin~~~te so the sale of the property cart he finalired. From the desk of 8111 Savt~ge Construction Manager (403)~iAd•561o .~ ~ d ~.i /~ I ` \ X W ~ J 'I \ ~~ , Nm / ANN \ % - -- al-3 J J,~ Fm ~ a ~~ ~ z \ ovv w ~ ~~ ' ~ ~ °° QI \~AU~ \ \ \ ~ ~\ _ w~wzmo N / cnZ ~ ~ zom> ~v~ /"^~ m Fm OI m=~ 40 ~ o~OI-wo ,IJ q w o . _ ~- ~YaI-W 2_. - I I-2QNN / O~M'lOW I / ~' U~c~wN I \~ e0f'9- ~ ~ w~ ~ ~ ~ F, / mgr` • ~ N ,,- ~ I •.41 F.M. ((~~ i' tL ~ j ~ ~~. I 1~1~ ~; ~ - ~ ';'~ I / I :, n ~~ ; u _~ - ' ¢~~; ry w z «. ,-~ ~" ~ m .ww v a s: LL JOmli Q h 'Y ~~ V ~ ZZN xQUJW -~Q J~N0-+2UU .U-. U \ ~ a-~a- or-wo aoa i • > (~ -~ ~°"n,.m.~ \ ~+'' '~ ~ ~ x vwi ~ Iw- v to a z ~ ~ ci ~ ~ - ~~ - `~ ', ~' !-~QQ ZNO V'W •v m ZK SO>J O WW I l \ owoatiaaw mmc I O {"' 'b, .u '. ~ // SWO d3mQ' U COO v/ ~ -,~~_ ~~ I I I I ZF-~S.N W U J:L .-Z \ ~/ 3OW0_Z>-OJ JO X ~~~ / I I I I .. SNOQJ3NQW xU~W \ 4 W / ' ~ I F NWUSd JJN2 ~IZ~S ~~ _,. N I I O NJS«+J4J N NW¢N ~ ~ `4 Z YZOWQ3QN Yam rr~~rr~~ ~ I ' I JOItxS G~Z Jw N ~2r I ~ K Q F-OO ZO QUMM i i 088'6 F- wpxoomzoo owm a _ U O JFW WOMW aZO1- I ~~ ~ ~ Q 3Q F-> J mr.aZW ~ ~ K N 3F-~+OF-7~ NJ 0 Z JW~-+U U F- N:JKF-W I ~~ /-i-,,"'~ / ~ o J w -..x m u_ o o w a J O.-. w ~.:' `o/ f U awtnmaoJr-o mad3N 1 ~ ~ ~Z~ IB3~ J ~i' ~ ~ I ~ /~ _ ~ oo ~ ~ 4 UTA _ / I i~~ 6 Fpm ~ / ', t ', ~ m~~, ~ ~ ~ ~ ~ ~ o ~, N , ,~. W~~ _~~ ~ ~ ~ ~ zm ~. c-~ z , ~- ~_ m ~. l ~ F- ~{~, J' / ~ ~ X E; ~~ ' ~ ~ ~ :Z , (~,, _ ~~~~~4~ , I \ 1 ~ ~z ~ o, a CHEATHAM AND ASSOCIATES Date ~ ~~ job No. /Ol~~ - z ~ iJ.-~' ~e: C~~ ~~®~~ We are enclosing the following: Prints ^ Specifications ^ Shop Drawings ^ Samples ^ Addendum ^ Change Order ^ Copy of Letter Copies Dated Description Copies to: ENGINEERS • PLANNERS • SURVEYOKS A Subsidiary Firm of Southwest Planning and Design, Inc. 1601 E. Lamar Blvd. • Suite 200 • Arlington, Texas 76011 817/548-0696 • Metro 265-8836 • Fax 817/265-8532 ^ For Your Approval or Your Use ,Requested ^ Please Comment ^ Resubmit CHEATHAM AND ASSOCIATE January 27, 1-999 City of College Station 1101 Texas Avenue College Station,. Texas 77842 Attn: Ms. Natalie Ruiz, Development Coordinator RE: Impact on Existing Drainage System by the Addition of a Locker Room at Oakwood Intermediate School Engineer's Project No. 1014-215 Ms. Ruiz: Per your request, we offer the following statements regarding the drainage impact. of the above mentioned locker room addition: We have reviewed the impact of the proposed locker room addition on the existing drainage system and have calculated an extremely conservative increase in runoff of 0.70 cubic feet per second. In our opinion, this net increase will have a negligible impact on the existing drainage systems. We hope this answers your concerns regarding this addition. Please call us if we can be of further assistance. Sincerely, ~ / ~' B a .Tucker cc: Ron King, P.E. F:\WORD\VLKRrch-1014\215\1tr.Ruiz.drainagz.wpd )1, ~ I ,,' U ENGINEERS • PLAN . VI~UJ~~'N~FNV `~ ~ ''nnnn v~ f ~ '~~~ ~S~ ~~~v • ~~ ERS SURVEYORS ~ ~ ~~ - __. A Subsidiary Firm of Southwest Planning and. Design, Inc. 1601 E. Lamar Blvd. • Suite 200 • Arlington, Texas 76011 817/548-0696 • Metro 265-8836 • Fax 817/265-8532 97-718 Homer Adams 205 Timber Street College Station, Texas 77840 97-718 Aric Danen P.O. Box 3072 College Station, Texas 77841 97-718 Richard Hedges 203 Timber Street `College Station, Texas 77840 97-718 Mae Bess Holleman 201 Timber ~ College Station, Texas 77840 E ! 97-718 Ocsar & Gertrude Johnson 908 Kent Street Sweeny, Texas 77840 97-718 Frances Kraft 22934 FM 742 Needvlle, Texas 77461 97-718 James Matis 1908 Bee Creek College Station, Texas 77840 ~I I'I I 97--718 ~~ Clair Nixon 111 Lee College Station, Texas 77840 ~, 97-718 j Jack Perryman 103 Lee Street College Station, Texas 7784U ~~ I 97-718 I; Raymond & Patricia Reed j 1601 Wolfpen Lane Ii College Station, Texas 77840 97-718 James Burk 201 Lee Avenue College Station, Texas 77840 97-718 Edmund T. Feldman Trustee 304 Holick College Station, Texas 77840 97-718 Rodney C. Hill 119 Lee College Station,. Texas 77840 97-718 Anna Jessup 1.15 Lee College Station, Texas 77840 97-718 Robert & Gloria Koronka 304 Glade Street College Station, Texas 77840 97-718 Joe Marek 1300 Anna.Street College Station, Texas 77840 97:718 Howard Nelson 5107 Spyglass Drive Dallas, Texas 75287-7556 97:718 Verland Norton 125 Lee College Station, Texas 77840 97-718 Ray G. & Jon Ray Perryman 107 Lee Avenue College Station, Texas 77840 97-718 Kenneth Sebesta 302. Glade College Station, Texas 77840. 97-718 97-718 Lilian .Simmons Frankie Surovik 301 Timber P.O. Box 464 College. Station, Texas 77840 Lyons, Texas, 77863 97-718 97-718 Diana Tapley Robert & Michelle Walker 305 Timber Street 207 Lee Avenue College Station, Texas 77840. College Station, Texas 77840-3125 97-718 97-718 ~~ Leonard Williams Mr. Bill Savage 200 Timber Street CSISD ~ College Station, Texas 77840 1812 Welsh College Station, Texas 77840 97-718 97:718 Cheatham & Associates VLK Architects 1601' E. Lamar Blvd., Suite 200 1161 Corporate Drive West, Suite 300 Arlington, Texas 76011 I i 1 ,. Arlington, Texas 76006 STAFF NOTES Oakwood Intermediate School Case #97-718 Staff reviewed .the site plan only for PRC review. The Engineering staff will review the attached construction documents and return to the applicant by Monday, November 10, 1997. Ordinance Requirements: It does not appear that the proposed classrooms and covered walk (totaling 8,749 sq. ft.) ~~~~ have adequate fire protection, In he parking area along Holik, distinguish between existing and proposed pavement. e (Staff had a difficult time distinguishing between the "courtyard" area and the sparking area.) _ Dimension the circulation aisle between the existing parking and the proposed parkimg row that is perpendicular to Holik Street. (Show the 2' overhang for this new parking row.) Comments/Concerns: _ Coordinate the electrical service requirements with Electrical Operations Coordinator Tony Michalsky at (409) 764-3660: _ Changes to the existing facilities will be at the owner's expense. Coordinate telephone service details with G.T.E. Representative Laverne Akin at (409) 821-4723. SUBMIT 10 COPIES OF THE REVISED SITE PLAN ONLY (NOT THE CONSTRUCTION PLANS SUBMITTED .FOR PRC REVIEW) BY WEDNESDAY, NOVEMBER 12, 1997 TO BE INCLUDED IN THE PLANNING AND ZONING COMMISSION PACKETS FOR THE NEXT MEETING ON THURSDAY, NOVEMBER 20, 1997 AT 7:00 P.M. IN THE CITY HALL COUNCIL ROOM AT 1101 TEXAS AVENUE SOUTH. ,. ~., City of College Station 1101 South Texas Avenue P.O. Box 9960. College Station, Texas 77842 CITY OF COLLEGE STATION Cl DEVELOPMENT SERVICES ~ r .~ Phone: ~ p~ Fax phone: ~ ~ ~ ~~ ~^' ~~~ CC: Date: ~ ~ / (cam / / Number of pages including cover sheet: rom• ~ •_ Phone: 409-764-3570 Fax phone:. 409-764-3496 STAFF NOTES Oakwood Intermediate School Case #97-718 The following comments pertain to the. site plan only. The Engineering staff will review the construction documents submitted and return to the applicant by Monday, November 10, 1997. Ordinance Reauirements: It does not appear that the proposed classrooms and covered walk (totaling 8,749 sq. ft.) have adequate fire protection. _ In the parking area along Holik, distinguish between existing and proposed pavement. (Staff had. a difficult time. distinguishing between the "courtyard" area and the parking area.) Show the existing fire lane. _ Dimension the circulation aisle between the existing. parking and the proposed parking row that is perpendicular to Holik Street. (Show the 2' overhang for this new parking row.) Comments/Concerns: Coordinate the electrical service requirements and easement locations with Electrical Operations. Coordinator Tony Michalsky at (409) 764-3660. The transformer locations will be moved and the electrical service. must be re-routed. Show the new transformer locations on the site plan. _ Contact. cable located. at 1-800-344-8377 for cable locate. GTE has. service to the main building (termination). Any service to the .proposed building is the responsibility of the owner/developer.. Coordinate telephone service details with G.T.E. Representative Laverne Akin at (409) 821-4723. SUBMIT 10 COPIES OF THE :REVISED SITE PLAN ONLY (NOT THE CONSTRUCTION PLANS. SUBMITTED FOR PRC REVIEW). BY WEDNESDAY, NOVEMBER 12, 1997 TO BE INCLUDED IN THE.PLANNING AND ZONING COMMISSION PACKETS FOR THE NEXT MEETING ON THURSDAY, NOVEMBER 20, 1997 AT 7:00. P.M. IN THE CITY HALL COUNCIL ROOM AT l I01 TEXAS AVENUE SOUTH. Planning Technician November 7, 1997 cc: Bill Savage, CSISD Jeffery C. Kalista, VLK Architects Bryan Tucker, Cheatham & Associates ~ii~ni47 13.02 ^n 409 764 3496 DEVELOP11~fENT SVCS I~ 0O1 r :~:~:~ ACTIVITY REPORT :~~~ TRANSMISSION OK TX/RX N0. 2720 CONNECTION TEL 18172658532pp161 CONNECTION ID START TIME 11/10 13:01 USAGE TIME 01'15 PAGES 2 RESULT OK SUBMIT APPLICATION AND THIS LIST CHECKED-0FF WITH 16 FOLDED COPIES OF SITE PLAN FOR REVIEW MINIMUM REQUIREMENTS FOR SITE PLAN PROPOSALS ALL CITY ORDINANCES MUST BE MET) INCLU~ING BUT NOT LIMITED TO THE FOLLOWING: 1. Sheet.size - 24" x 36" L~ 2. Title block to include: a.) Name, .address, location, and legal description b.) Name, address, and telephone number of applicant c.) Name, address, and telephone number of developer/owner d.) Name, address, and'telephone number of architect engineer e.) Date of submittal f.) Total site area 3. Ownership and current zoning of parcel and all abutting parcels. l~ 4. A key map (not necessarily to scale). L9 5. Scale should be largest standard engineering scale possible on{ sheet. [~ 6. Provide a north arrow. W°°~ ~ R1~ any. ~ ~e~ ~o~~z~ (~/ 7. Topography, :final. grading plan, and other pertinent drainage information. (If plan has too much information,' show drainage on separate sheet..) 8. All existing streets, drives, buildings, and water courses on or adjacent to the proposed project site. f~ 9. Locate 100 yr. floodplain on or adjacent to the proposed project site, note if there is none on the site. ~10. Location,and size of existing utilities within or adjacent to the proposed project site. ~~11. Proposed location, type, and size of the following: \\ a.) Buildings.. and structures b.) Off-.Street parking areas with parking spaces drawn, tabulated, and dimensioned c.) Sidewalks r ~~ ~~,,,~ StaG~S ? d.) Common; open space sites ~„o e.) 'Sites for solid waste containers C~ 12. Proposed streets, drives, and curb cuts. For each proposed curb cut (including driveways, streets, alleys, etc.)'loeate existing curb cuts on the same and opposite side of the street to determine separation distances between-existing and proposed curb cuts. Indicate driveway throat length as. measured m the Driveway Ordinance. (See Ordinance 1961 for driveway location and design requirements.) ~~ f~ 13. The otal number of residential buildings and units to be constructed on the proposed project site. 14. Landscape. plan as required in Section 11 of the Zoning Ordinance (See Ordinance # 1638.) The landscaping plan can be shown on a separate sheet. if oo much information is on the original site plan. -- Attempt to reduce or eliminate plantings in easements:-Include. information;on the plan such as: a) existing landscaping to remain r b) required point calculations ,wk~' c) proposed.. new plantings with points earned ~ a,,~ ECG 15. Indicate unit type (number of bedrooms). ^ 16. The density of dwelling units per acre of the proposed project. C/~ 17. The gross square .footage of buildings and the proposed use of each building. ('^ ~ 18. Designate number of parking s~aces required by ordinance and provided by proposal. C~ 19. Show dimensions to size and locate all structures, parking spaces, drives, curb cuts, parking islands, and setbacks. (~ 20. Are there impact fees associated with this development? ^ 21. Provide a water and sanitary sewer legend to include water demands (minimum, maximum and average demands in gallons per minute) and sewer loadings (maximum demands in gallons per day). ^ 22. Show all meter locations. Meters must be located in easements or RO.W. (City will size meters.) The following are typical standards for Plan Development established by Ordinance or Policy: 1. Building separation is a minimum of 1S feet.. Cl 2. Building setbacks are outlined in Ordinance .1638, Zoning Ordinance, Table A (Sec. 7, P. 30). L~ 3. Minimum parking space is 9' X 20', or on a perimeter row, 9' x 18' with a 2' overhang. 4. Minimum drive width is 23' with head-in parking or 20' without parking. Cl 5. Raised landscaped islands, (6" raised curb ~ 'mum of 180 sq. ft. are located at both ends of every parking row. Additionally, 180 sq. ft. landscapingevery 15 interior parking spaces, must be provided. • `^~ 6. Streetscape compliance is required which involves special plantings along streets specified in the City's `r'~ . Streetscape Plan. ^ 7. A 6" raised curb is required around all edges of all parts of all paved areas without exception. (To include islands, planting areas, access ways, dumpster locations, utility pads, etc.) Curb detail to be t~~ arki~-~ CitY En ig_neer. No exceptions will be made for areas. designated as "reserved for future ~~,, ~~~~ ~ P g~~ ,~~ '~ 8. Wheelstops may be required on interior rows longer than 10 spaces or in special situations. Sidewalks are required at time of development if property has frontage on a street; shown on the sidewalk Master Plan or if the Project Review Committee deternunes the necessity. (Refer to Section 10.2 of the Zoning Ordinance). 10. Locations of dumpsters shall be .such that dumpsters are not visible from streets. Gates are discouraged and visual screening from R.O.W. is required. ~ j,,rr.~ !~ 11. Healthy, native trees over 6" in caliper should be retained whenever possible. C~ 12. Fire. lanes of a minimum of 20 feet in width with a minimum height clearance of 14 feet must be established if any structure of any type is more than 150 feet from a public street or highway. 1~' 13. Any structure in any zoning district other than R-1, R-1A, or R-2 must be within 300 feet of a fire ',". hydrant as measured along a public street or along an approved fire lane as the hose is laid off the truck. 14. Fire hydrants must be located on the same side of a major street as a project, and shall. be in a location '~ approved by the City Engineer. -- -_ 15. Fire hydrants must be operable and accepted by the City and, drives must have an all weather surface before combustibles can be brought on any site. ~.~,~9 16. A twenty. four foot setback from R.O.W. to curb of parking lot is required. Parking may be allowed in this area up to a maximum of 7 contiguous spaces. 17. All plans must include irrigation systems for landscaping. Irrigation meters are separate from the regular water ___ systems. for buildings and. must be sized accordingly and include backflow prevention protection. K ~ a ~ n~~~~ %l '~i Case #97-718 a x, d, Li~Y; ~.~.~ C;~~~~~~ Staff reviewed the site plan only for PRC review. The Engineering staff will review the attached construction documents and return to the applicant by Monday, November 10, 1997. Ordinance Requirements: (~ It does not appear that the proposed classr ms/and covered walk (totaling 8,749 sq. ft t have adequate fire protection. Jam,, (Ja-u-~-~--.~ G~~~ ~ G In the parking area along Holik, distinguish between existing and proposed pavement. (Staff ha~ a difficult time istinguis 'ng between the "courtyard" area and the parking area.) ~~iti~.w c~~.~e~- ' ' _/ Dimension the circulation aisle between the existing parking and the proposed parkinng row that is perpendicular to Holik Street. (Show the 2' overhang for this new parking row.) Comments/Concerns: _ Coordinate the electrical service requirements with Electrical Operations Coordinator Tony Michalsky at (409) 764-3660: Changes to the existing facilities will be at the owner's expense. Coordinate telephone e service details with G.T.E. Representative Laverne Akin at (409) 821-4723. SUBMIT 10 COPIES OF THE REVISED SITE PLAN ONLY (NOT THE CONSTRUCTION PLANS SUBMITTED FOR PRC REVIEW). BY WEDNESDAY, NOVEMBER 12, 1997 TO BE INCLUDED 1N THE PLANNING AND ZONING COMMISSION PACKETS FOR THE NEXT MEETING ON THURSDAY, NOVEMBER 20, 1997 AT 7:00 P.M. IN THE CITY HALL COUNCIL ROOM AT 1101 TEXAS AVENUE SOUTH. ~~~~ ~, rte= - ~ w.. STAFF NOTES Oakwood Intermediate School ~~. NOVEMBER 5,1997 CONDITIONAL USE PERMIT - OAKWOOD INTERMEDIATE SCHOOL ADDITION AND RENOVATIONS; PROPOSED. ADDITIONS AND RENOVATIONS TO THE EXISTING SCHOOL SITE LOCATED AT lOb HOLIK STREET. GTE COMIYII;NTS: CONTACT CABLE LOCATE AT 1-800-344-8377 FOR CABLE LOCATE. GTE HAS SERVICE TO THE MAIN BUILDING (TERNIINATION). ANY SERVICE TO THE PROPOSED BUILDING IS THE RESPONSIBILITY OF THE OWNER/DEVELOPER. IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT LAVERNE AHIN WITH GTE AT 409/821-4723. CHEATHAM AND ASSOCIATES March 24, 1998 Ms. Shirley Volk Development Coordinator City of College Station 1101 Texas Avenue College Station, Texas 77842 Re: City Comments on Oakwood/Willow Branch Construction Plans Job # 1014-215 Ms. Volk: We wish to summarize and respond to the City's comments for the above mentioned project. Please refer to this response list and the three sets of revised construction plans as submitted with this package. I. Oakwood Intermediate School Sheet C2.01 A. .City Comments 1) How is unit B fire protected? 2) All new parkingmust have 6" .raised curb and gutter 3) 18' spaces must have 2 .foot overhang 4) General Comment - If there are any public sewer or water lines, please indicate that clearly. Per this review, we did not see any nor did we see any new meters. 5) Change parking paving rebar to #4's B. Response 1) Unit B is fire protected by sprinklers, refer to mechanical engineers drawings. 2) Corrected 3) Corrected 4) All public utilities have been clearly labeled and utility easements shown. 5) Corrected ENGINEERS • PLANNERS • SURVEYORS A Subsidiary Firm of Southwest Planning and Design, Inc. 1601 E. Lamar Blvd. • Suite 200 • Arlington, Texas 76011 817/548-0696 • Metro 265-8836 • Fax 81.7/265-8532 3 Ms. Shirley Volk March 24, 1998 City of College Station Page 2 Sheet C2.02 A. .City Comments 1) Is this (storm drain line) to remain under building? Utility plan shows item to be removed. 2) Why not (cap/plug/grout) existing sanitary line at manhole? 3) Clarify -must remove or grout fill extent of line being abandoned. B. Response 1) All existing storm lines under building. foot print are to be demoed, please refer to demolition note 2) ..Clarified -refer to new sheet 3) Clarified -refer to new sheet Sheet C2.03 A. City Comments 1) Where does the water from this 12" PVC storm go? 2) Show how these (new surface inlets) tied into storm sewer system. Specify grate. 3) Where is fiber optic line? B. Response 1) Existing storm system to be completely. demoed, please. refer to sheet C2.02; and C2.07 (However, arrows show direction of flow) 2) This sheet represents site grading only. Existing utilities are shown for referencing potential conflicts. Refer to sheet C2.07 for. storm drain system. 3) All existing utilities now shown -refer to new sheet Sheet C2.04 A. City Comments 1) Is this a curb cut? 2) What about silt fence to prevent spoils from depositing on driveway? B. Response 1) Yes, refer to new sheet for clarification 2} Added Ms. Shirley Volk City of College Station March 24, 1998 Page 3 Sheet C2.05 A. City Comments 1) Please refer to sanitary sewer line as "Line A" for .clarity. B. Response 2) Corrected Sheet C2.06 A. City Comments 1) Is this section of sanitary sewer line public? B. Response 1) No, entire line is private Sheet C2.07 A. City Comments 1) What about capacity of existing 15"? 2) Is this 15" sufficient? 3) Does this concern you? 4) Is the 15" out sufficient? 5) I think many of these questions would be answered in a drainage report. B. Response 1) Please refer to new sheet for all responses. Sheet C2.08 A. City Comments 1) Need drainage report B. Response 1) Please refer to new sheet and drainage report. Ms. Shirley Volk March24, 1998 City of College Station Page 4 Sheet C3.01 A. City Comments 1) Show limits of flood plain 2) Existing north parking lot entrance must beano left turn exit if new parking lot is built. 3) Please correct dimensions labeled 4) Must have minimum 4' clearance on sidewalk and 2' overhang from parking; increase sidewalk to 6 feet wide. 5) Stripe fire lane on new driveway B. Response 1) Please refer to sheet C3.10 for 100 ,year water surface elevation. for proposed detention pond 2) Correctly labeled 3) Added/Corrected 4) Corrected 5) Corrected/Added Sheet C3.02 A. City Comments 1) Abandon this section? 2) Are these to be removed? 3) Please label B. Response 1) Yes, see new sheet 2) Yes, refer to demo note 3) Labeled Sheet C3.04 A. City Comments 1) Do you feel that any additional armoring of channel is necessary to prevent undermining of retaining wall? 2) Change rebar to #4 rebar B. Response 1) 100 year water surface elevation at retaining wall is only 299.25 feet. The bottom of retaining wall is at elevation 302.00. Refer to detail sheet C4.06. Ms. Shirley Volk March 24, 1998 City of College Station Page 5 2) Per conversation with Paul Kaspar, #3 bars are okay. Sheet C3.05 A. City Comments 1) Change driveway. rebars to #4 bars 2) Change sidewalk rebars to #4 bars B. Response 1) Corrected 2) Per discussion with Paul Kaspar, #3 bars okay for sidewalk Sheet C3.06 A. City Comments 1) Label fire hydrant 2) (On a post-it-note) 8" sewer line proximity to channel. B. Response 1) Labeled 2) Please refer to sheet C3.07, line has more than adequate cover and slope. .Sheet C3.07 A. City Comments 1) Please label proposed contours B. Response 1) Labeled Sheet C3.09 A. City Comments 1) Any relocation of meters or hydrants, assure that they are located within a P.U.E. or Right-Of--Way. . 4 Ms. Shirley Uolk March 24, 1998 City of College Station Page 6 B. Response 1) Water line is a public line and has a 10' P.U.E. shown. Sheet C4.02 A. City Comments 1) Change sidewalk rebars to #4 bars B. Response 1) #3 bars at 18" c.c. okay for private, #3 bars at 12"c.c. for public, per Paul Kasper. Sheet C4.03 A. City Comments 1) 24" curb and gutter required, may be 30" if desired. B. Response 1) Unchanged If you have any additional questions, please do not hesitate to call. us. Sincerely, _. ---Br . ucIcer ~ _.: cc: Mr. Bill Savage, P.E. C.S.I.S.D. Mr. Steve Aloway, VLK Architects F:\WORD\VLK\215\ltr. Volk.citycomments.wpd