STAFF PRC REPORT
C.S. Institute of Religion
Case #97-706
Ordinance Requirements:
Submit a drainagereport for the new construction as it relates to the overall site.
Label building uses and square footage.. (Include the existing and proposed buildings.)
Label and show details of the: proposed screening of the mechanical equipment yard area.
Provide a vicinity map.
Provide a legend containing minimum, maximum and .average domestic water demands
® (gallons per minute), irrigation .water. demands (gallons per minute), and sewer demands
(gallons per day) for the new addition or the total site.
How. is the site being serviced in terms of garbage pickup? Staff suggested the location of
® a future`dumpster location to include a 12' x 12' pad site with appropriate screening from
the publicrights-of--way.
Where will the new catch basin be located? (See note at the rear. of building.)
What are the four rectangular columns located in the existing driveway along the. rear of
® the building? Label on the site .plan.
Comments/Concerns:
Coordinate electrical' service details with Electrical Operations Coordinator Tony
® Michalsky at (409) 764-3660.
G.T.E. currently has termination on the existing building. If the existing termination needs
® to be relocated due to the addition/remodeling, it will be at the owner's. expense. Sheet
SD-2 indicates an existing 1 1/2" underground conduit to telephone company box;
however, the conduit shows g®ing to the addition not to the existing building... The
conduit with pull string shall ell up 4' oar .the outside building termination .and 6" at the
telephone .company .box. The termnation shall be within 20' of power. ~~ not, the. owner
is responsible for providing and" placing a 8' x 5/8" copper ground. rod at the base of the
termination. Coordinate telephone .service details. and necessary .easements with G.T.E.
Representative Laverne Akin at (409) 821--4723.
SiJBN1IT 10 COPIES OF `THE REVISED SITE PLAN. BY WEDNESDAY, JUNE 25, 1997 TO
BE INCLUDED IN THE PLANNING & ZONING COMMISSION PACKETS FOR THE
MEETING OF THURSDAY, .JULY 3, 1997. THE MEETING WILL BE AT 7:00 P.M. IN
TI3E COLLEGE STAT70N CONFF~EI~CE CENTER AT 1300 GEORGE BUSH DRIVE.
FROJECT REVIEW COMMITTEE REPORT
June 19, 1997
TO: Dan Evans, Architect
17000 El Camino Real, Suite 300C, Houston, TX 77058
Lee Harlan, Architect
50 East North Temple Street, COB 4WW, Sa1t;Lake City, UT 84150
FROM: Project Review Corn ' e
Jane Kee, .City anne
Steve Homeyer, nt to the City Engineer
Winne Garner, P&Z epresentative ,
Others Attending
Natalie Ruiz, Planning Technician
Tony Michalsky, Electrical Operations Co inator
Laverne Akin, GTE Representative
Shirley Volk, Development Coordinator
Jon Mies, Fire Marshal
SUBJECT: Parking Lot Plan -College Station Institute of Religion; proposed building
addition and remodeling of the: existing facility located at 100 East Dexter Drive,
generally located in the southwest quadrant of the intersection of Dexter Drive and
Old Jersey Street near Brison Park. (97-706)
A Project Review Committee meeting was held Wednesday, June 18, 1997 to discuss the above
mentioned parking lot plan. .Commissioner Garner moved to approve the site plan with the
following ordinance requirements and. comments. The following is a list of ordinance
requirements and comments identified by the Project Review Committee. This list does not
relieve the applicant of total compliance with all current ordinance requirements.
Ordinance. Requirements:
Clarify on the site plan exactly what is being added to the site.
_ Submit a drainage report for the new construction as it relates. to the overall site.
_ .Label building uses and square footage for the e~sting and proposed buildings.(A copy of
the .chart submitted with the building plans. will suffiee.)
Label :and show details of the proposed screening of the mechanical equipment yard. area.
_ Provide a vicinity map.
_ Staff suggested the location of a "future" dumpster location to include a 12' x 12' pad site
with appropriate screening from the public rights-of--way.
Clarify where the proposed catch basin will be located near the rear of the building.
PRC Report
CS Institute of Religion
Case #97-706.
Page- 2 of 2
Comments/Concerns:
Coordinate the electrical service details with Electrical Operations Coordinator Tony
Mchalsky at (409).764-3660:
GTE currently has termination on the. existing building. If the existing termination needs
to be relocated due to the addition/remodeling, it will be at the owner's. expense. Sheet
SD-2 :indicates an' existing l 1/2" underground conduit to telephone company box;
however, the conduit shows going to the :addition not to he existing :building. The
conduit with pull string shall ell up 4' on the outside building termination and b' at the
telephone company box. The termination shall be within 20' of power. If not, the owner
is responsible for providing and placing a 8' x 5/8"copper ground-rod at the base of the
ermination. Coordinate telephone service details with G:T:E. Rep: Laverne Akin at (409)
821-4723.
Assistant to the C'rty Engineer Homeyer seconded-the. motion to approve he site plan .with the
above .mentioned conditions which passed unopposed {3 _ 0).
SUBMIT 10 COPIES OF THE REVISED SITE PLAN AND l COPY OF THE FLOOR PLAN
BY WEDNESDAY, JUNE 25,' 1.997 T4 BE INCLUDED IN THE PLANNING AND ZONING
COMMISSION PACKETS FOR THE MEETING OF THURSDAY, JULY 3, 1997. THE
MEETING :WILL BE HELD AT 7:00 P.M. ,IN THE: COLLEGE :STATION CONFERENCE
CENTER AT 1300 .GEORGE BUSH DRIVE.
APPEAL PROCESS. An applicant may appeal the decision. of the_Project Review Committee
to the Planning and Zoning Commission within five days after the PRC .Committee meeting.
Failure to appeal the PRC action shall constitute a contractual. acceptance of all conditions
imposed,-.and- a waiver and urrender of all complaints, defects, or potential invalidity, whether
under state or federal law. An applicant appealing the decision of the PRC shall file. ten copies of
the final site plan as approved by the PRC, showing all changes and requirements imposed bythe
PRC, and accompanied by a written explanation of those items being appealed. Until said copies
are on file, no fixrther development approval shall occur, and no further-action by the Commission
shall take place: An applicant may appeal only certain. aspects of site _;plan review, and in the
absence of discretionary review by the Commission, ;or review pursuant to a petition, all other
aspects of the site plan shall be final .Any notice of appeal shall state with particularity the aspects
which are to be appealed. Coordinate appear process through ,Development .Coordinator Shirley
Volk at (409) 764-3741.