HomeMy WebLinkAboutMiscellaneousCONDITIONAL USES
MINIMUM .REQUIREMENTS
1. Receipt for filing fee ($450.00 or $75.00 for in-house ,child care - min. 7 children).
2. Sixteen (16) copies of site plan which includes requirements for siteplan proposals
as listed on attached sheet. This site .plan. will go to P.R.C. for review, after which
thirteen`(13) copies of revised site plan will be required.
3. Detailed explanation of proposed use including hours of operation, anticipated traffic,
number of employees, number of students, children, :church members,: etc., as
applicable.
4. If sign is planned for project, site plan should include sign elevation and details.
If sign details are not included on plans submitted with;this' application, any future
sign may have to be considered.. as a separate conditional use permit and alt of the
above requirements must be repeatea.
APPLICATION WILL NOT BE CONSIDERED COMPLETE WITHOUT' THE FOLLOWING
INFORMATION ADDRESSED:
Conditional Uses: (check one)
® Child Care:.... ^ Duplexes_ (R-3)
^ Convolescent Homes ^ Telecommunication Towers (A-O, A-
^ Medical Clinics . P, M-1)
^ Pharmacies ^ Fraternity/Sorority Houses (R-5, R-6,
^ Public Libraries C-1, M-1)
^ Community Buildings. ^ Group Housing (R-5, R-6, C-1)
^ Municipal Service Facilities ^ Funeral Houses (C-N, C-NG, M-1,
^ Sanitariums M-2 A-P, C-3)
^ Nursing Homes ^ Large°Recycling Collection Facilities
^ Parking. Lots. (C-NG, A-P, C-1, C-2, C-3)
^ Telephone Exchange ^ Apartment Hotels (C-1)
^ Veterinary Clinic
^ Hospitals
State how the following. issues will be addressed:
1. Parking- will follow city code.
''2. Screening of offensive:areas (trash, loading areas; transformers, utility connections,
detention ponds, etc.)
Will follow city code;
3. Traffic Impacts- Both.. streets are suitably planned to
avoid major ,impact.
4. Protection of neighborhoods- The property is across from the
College Station Business Park and the Pebble
.Creek Elementary ,School and should not impact
the neighborhood.
97-701
Pebble Creek Development Co
c/o Young Brothers
P.O. Drawer 1800
Waco, Texas 76703
97-701
Stylecraft Builders Inc.
7610 Eastmark #201
College Station, Texas 77840
97-701
Resident
4606 Caddie Ct.
College Station, Texas 77845
97-701
Arnold Oates
4807 St. Andrews Dr.
College Station, Texas 77845
97-701
College Station ISD
1812 Welsh. #120
College Station, Texas 77840
s7ao1
Resident
4604 Caddie Ct.
College Station, Texas 77845
97-701
Resident
4608 Caddie Ct.
College Station, Texas 77845
97-701
Trinity Presbyterian Church
P.O. Box 9733
College Station, Texas 77842
• .. .:.. ~; •I •
. s ~
.~~~ . ,
4 •' '` ~'
•* ~ ~ s
' `• •'a•~
f •
~~
~', ~ ~ ~~
~: ~~
~~
p'
I, 1 ~ ~t
f
j ~ Q
~ ~ ~
. ~~
~. _ _ ~--
~y ~~<.
:~;~:rcy;i;
:;v:;.,.y:e
yi :i+;.:
~ '
yT,~rt ,+rrr b
~~
I
f
~4 ~
4
4
1
i
III otftQ trott of IonQ o+n~
I IA t11t N~(/~~p1f ~QQ10At
'i toCatb fns GreN-t Ptokt RQ.
1 I. l Scntt H+r d fnftrsaccron.
,~~~
L
1 :~~ I, ~
c t,,.
:.
.~'
~-
/ ~t
sT~
~ v`
v
~t
p~
~ U~+~~~
a
~~ ~
..~
` !~
~ f
~~~.~~
~` .
~ `
1""~"-~I3lfa' " -
.~
t~
~~
~H
.~
FILE NOTE
Trinity Presbyterian Church
Pebble Creek Subdivision
Applicants: Don Garrett, Dr. Arnold Oats (Rep. of Church), Dave Ruesink (Rep. of Church), Rick
Baldwin (Young Contractors) and F. M. Young (Pebble Creek Dev'1).
Staff: Tony Michalsky, Jennifer Reeves, Lee Battle, Sabine McCully, Paul Kaspar, Scott
Hester and Natalie Ruiz.
On Monday, December 22, 1997, staff met with representatives of the church and Pebble Creek
Development to discuss the platting of approximately 45 acres in the. Pebble Creek Subdivision bound
by Greens Prairie Road, Lakeway Drive, Venture Avenue and State Highway 6 Frontage Road. The
church is purchasing approximately 8 acres on the SW .corner of Lakeway & Venture for a future
facility to include an education center, family life center and sanctuary. The following items were
discussed in the predevelopment meeting:
_ The church and Pebble Creek Dev'1 will work together to plat the entire 45 acres. A preliminary
plat will be required for the total acreage that will be reviewed by P&Z and Council.
Scott Hester informed the applicants that Parkview Drive could not be extended through the
subject property to the Frontage Road as a collector. However, it could be reduced to a 50' right-
of-way, a residential street section, and extended to the Frontage Road. Staff prefers to end the
street in a cul--de-sac with no connection to the Frontage Road.
_ Once the preliminary plat is approved, the church will submit a final. plat of their property to include
the Parkview street right-of--way both on and immediately adjacent to .their property. (Staff
informed the .applicants that no half streets are allowed and the entire 50' right-of--way width must
be dedicated at the. same time.) Along with the final plat, the applicant must also submit complete
construction documents for all public infrastructure and guarantee the infrastructure prior to filing
the plat for. record. Dr. Oats and Mr. Young. agreed to work together on the platting including the
dedication and ultimate construction of Parkview.
The 32.5 acre tract with frontage on Greens Prairie Road. can be shown as a large reserve tract if
the developer is not sure how it will develop in the. future.
Electricity for the church site should come from the Frontage .Road, through the 3.7 acre tract to
serve the 7.9 acre tract far the church. There is electricity avalableacross the Lakeway Drive and
Venture intersection; however,. the developer will have to bore the intersection to get to the church
site. Staff recommended that. the church obtain an off site utility .easement to the .Frontage Road.
atali omas Ruiz
Assistant Development Coordinator
December 23, 1997
._._..
::.
P 1`
:Shirley_Volk_-.Pebble Creek ~ ~ ~~ age
;~ (/
From: Shirley Volk
To: Edwin Hard, Natalie Ruiz, Paul Kaspar, Sabine M...
Subject: Pebble Creek
I just talked to both Rick Baldwin of f=.M.Young (Pebble Creek developer) and Dwaine ofi Garrett
Engineering about the platting of the section of PC for the church. Mr. Baldwin asked if, rather than to
make a cul-de-sac for theextension of the street that goes by the school, they can make a loop street
and have commercial lots off it. I said that sounds rather like a good idea, and cautioned that they need
to be careful of the spacing between where both. ends of the street will hit l_akeway Drive. I suggested
they sketch out something and fax it to us to look. I told them we could give them an "opinion" if they
would do that. I also asked about zoning and he said he thinks it is zoned for "light manufacturing". As I
look at my zoning map, I think part of it is zoned for A-P and the rest is C-1, isn't it? Did you all talk
about zoning at the predev. mtg. last week?
Dwaine asked me about phase numbers for PC and l referred him to Baldwin and explained that the
developer gives phase numbers, not us! I also told him about the loop street idea and he hadn't heard
about that. I said all the more reason to contact him, then.