Good Morning, Mark! Paul Kaspar has. been following up on this, and has talked to Vern who is the
inspector on this job. He is going to give a copy of the form the City uses of the "Letter of Completion"
for the contractorto complete and return to him. He will (I think) give it to you to follow up on. FYI, the
engineer's estimates for each project have also: been transferred to your area, and Paul said he thinks
Kim knows where they are kept. If everything is ok., then you can have someone complete the "Letter
of Acceptance" and send it to the contractor and retum the financial guarantee to whoever deposited it
with the City. That needs to be done thru Accounting by whoever is doing the job Deborah Grace used to
dol (At least this,is the way it used to be done- I don't know how you plan to do it in the future, but if
you'll let me know when you decide, I'd appreciate it, because as a coordinator, those types of questions
cometo me all the time.) Thanks to you and your inspectors for your help on this.
»> Mark Smith 01/23/98 05:13PM »>
send the plans to me. we wil be doing pretty. much the same as before on that process except that we
will put the process in writing and .include it in a SOP manual
»> Shirley Volk 01/23/98 05:09PM »>
Mark: I've had a phone call from Mike Wick of DMC,Jnc., the contractorswho are building the Holleman
Arms apartment project, and the infrastructure, both on-site and off-site, that goes with it. Well, actually,
I don't know if they are really the contractor building-the infrastructure, but they are the general
contractors for the whole project. Anyway, his question concerns how he gets the City to accept the
infrastructure he has built and he can get his money back.
1 haven't ever been in on this. end of development very often, so everything I've ever known about it, I've
pretty much fi~ryoiten. However, as i recall, t'r~e-City inspector used to give the contractor a form "letter
of completion" for him to complete and. submit; then the City gives them. a "letter of acceptance" and
then he requests his guarantee back and we give it to-him..
BUTTTTTTTT that was then and this. is now, :and I don't know what to tell the dude. His name is Mike
Wick, the company is DMC, Inc., the phone number is .(713)977-4844 Ext.336, and his FAX number is
(713)260-7825. If you could make contact with him and explain the system, or explain it to me, send me
the form and t'll do it for. you, he would be very appreciative,
Also, I guess when people are wanting a building permit or a certificate of occupancy on a private
project, I'It a-mail you on it because most of the .projects have at least-a fire hydrant and water line that
will be the City's and. (1)you will need :plans for your inspectors to use during constructionand (2)the
hydrant and line will have to be tested and approved prior to C.O., so you really need. to be included in
this checklist before we let either the permit or the C.O. go. if you have someone else I should be
notifying., .please let me know.: I don't have an up-to-date list of which inspector is doing what job, so I
can't be sure who to notify on the project, so I'IFcount on you to be the contact person .until you tell me to
notify someone else!
We'll get this worked out sometime. In the meantime, hang in there and at least try to have. a great
weekend!
CC: Jim Callaway,. Natalie Ruiz
01!2211998 15:36 713-260-7E25 D~1C EUILDERS
January 22, 1998
Mr. Paul Kaspar
Graduate. Engineer
City of College Station
1101 Texas Avenue
College Station, TX 77542
THE
DINERSTEIN
COMPANIES
.IZE: Hollernrcn Arms Apartments -College Station
Dear Mr. Kaspar,
PAGE 04
We are pleased to inform you that the public water and sewer improvements at the above project have
been completed and accepted by the City.
We hereby request that the irrevocable Letter of Credit issued as No. I-473381 by Texas Commerce
Bank in the amount of $1.58,516.60 be returned prior to February 1, 1998.
If convenient, piesse deliver file ori~;iria Letter to Texas Commerce Bdnlc, 717 Travis Street, 3rd Floor,
Houston, Texas 77002 with a copy to Gary Campbell at the address below.
We would appreciate your consideration in bringing closure to the installation of public sewer and water
lines on the Holleman. Arms apartment project.
Should you have questions now oral any time during the construction process, please give me a call at
713!977-4844 ext 336.
Very truly yours,
Stud t p merit ont a tors, Ltd.
$y:
C. ~chael is
CMA/mw
cc: Shirley Volk, City of College Station
Jack Dinerstein, Claude Arnold
One Woodway Centre 6363 Woodway 10th Floor Houston, Texas 77057-1717
".~„ n~~ ~a~~ GAY ~i(1 7i4_67T_di2(lli
::.: :.: ~ .. ::.:.:::::.::.... ::::.:::: :... :::::.:: ::.:.:.. :::.::::..:.::: :.. :.. ::.::vr :.:.:.:::.:: :--: :...:..v::::::-:: ::.::::::r :::...:: :.n.:::.:..::::: ::.::.:......::+:::::.: ::.:.::::.::::: ::::.. :::::.:: ::.: ::::.::::.. :::..: ::.:: ::::..: ::..: :.:::.: n::.:::::: :.::: :::::::.:: ~::: -:.:::.~ ::..: ::::.:.:
;Shirley Volk -: Re LC for Holleman Arms ..,. age..1
From: Paul Kaspar
To: DGRACE cLDCITY OF COLLEGE STATION.CITY HALL
Date: 2/3/98 2:03PM
Subject: Re: LC for Holleman Arms
F have received the approved acceptance letter from Mark Smith for the Public Water and Sewer (on and
offsite) for the above apartment complex. The .letter of credit was for the construction of the above
mentioned infrastructure and can now be released back to the applicant. I have compared the total
amount to the Engineers est. and it appears that all work for which the Lett. of Cred. was issued has been
completed. 1 have asked Oebra Charanza to file a copy of the engineers estimate and the acceptance
letter in the Final Plat file for Holleman Arms Apts.
»> Deborah Grace 02/02/98 08:57AM »>
expires March 1. It has your name on it that is why I am sending this to you.
CC: Shirley Volk, Veronica Morgan
DEVELOPMENT PERMIT
PERMIT NO. 474-B
HOLLEMAN ARMS APARTMENTS
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Lot 1, Holleman Arms Subdivision
OWNER:
College Station Student Housing, LTD.
6363 Woodway
Houston, Texas 77057
(713)977-4844
SITE ADDRESS:
Not Addressed
DRAINAGE BASIN:
North Fork Trib. "B", Bee Creek
TYPE OF DEVELOPMENT:
This permit is valid for site construction as shown upon the approved on-site construction plans.
Upon resolution of the Wellborn water line easement situation that is currently being discussed
between Wellborn Water Supply, City of College Station and College Station Student Housing,
LTD., this development permit shall be valid for construction of all public infrastructure as shown
on the approved public water and sewer construction plans. This development permit replaces
DP#474 and DP#474-A.
The Contractor shall take all necessary precautions. to prevent silt and debris from leaving the immediate
construction site in accordance- with the approved erosion control .plan as well as the City of College
Station Drainage Policy and Design Criteria. The Owner and/or Contractor shall assure that all disturbed
areas are sodden and establishment of vegetation occurs prior to removal of .any silt fencing or hay bales
used for temp-ovary erosion control. The Owner and/or Contractor shall also insure that any disturbed
vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall
be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery
and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work.
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced
before any operations of this permit can begin.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be
taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city
streets, or existing drainage facilities.
I hereby grant this permit for development of an area outside the special flood hazard area. .All
development shall be in accordance with the plans. and specifications submitted to and approved by the
City Engineer. in the development permit application for the above named project and all of the codes and
or/di~n~ances o e City o College Station that apply.
Administrator/Repre _ five Date
~ ~- 3a ~ 9~
Owner/Ag t/Con ctor Date
LEGS STATION
COL
P. O. Box 9960 1101. Texas Avenue College Station, TX 77842
Tel: 409 764 3500
September 12, 1997
Mike Wick.
DMC Builders
6363 Woodway, Suite 1000
Houstoq Texas 77057
Dear Mr. Wick:
The City of College Station will allow the use of SDR-35 PVC pipe for the private storm sewer for
the Holleman Arms Apartments.. Approved private drainage pipes are reinforced concrete pipe,
corrugated metal pipe, ductile iron or steel pipe, and polyvinyl chloride pipe (SDR 35 or SDR 26).
For public storm sewer the City of College Station only accepts reinforced concrete pipe.
If you should have any further questions. or concerns, please give me a call at 409-764-3570.
Sincerely,
W. Paul Kaspar
Graduate Engineer
xc: Kent Laza, City Engineer
Veronica. Morgaq Assistant City Engineer
~,,aShirley Volk, Development Coordinator
Home of Texas A&M University
.~
.....THE. /~~
DINERSTEIN
11'.1997 COMPANIES
September ,
'~, Ms. Shirley Volk
Development Coordinator.
City of College Station
1101 Texas:Avenue
College Station, TX 77842:
RE: Holleman Arms Apartments -College Station
Dear Ms. Volk,
Attached to this. letter is our check in the amount of $49,5.00.00 as .payment in full of the $225:00
per housing unit assessment for parkland development.
We are continuing our efforts to obtain an actual parcel of land to transfer to the City in order to
satisfy our parkland obligation, but to date have not been able to fmalize a purchase. If within 6
months. of today's date we are able to bring a satisfactory land parcel to the City, the City will
refund our payment in the'full amount of $49,500.00, upon acceptance of the land deed.
If this exchange is agreeable, please have a copy of this letter signed by a City representative and.
return same o me.
Should you have questions now or any-time during he construction process, please. give me a
calla
Very truly yours,
Student Apartment Contractors, Ltd.
By: DMC Building Company, Inc.
General Partner City of College Station, Texas
B B
ael Wick, Vice President
CMA/wb
cc: W. Paul Kasper,_Graduate Engineer
Jack Dinerstein, Mike Wiek, Bi11 Lawrence
One Woodway Centre 6363 Woodway. 10th Floor Houston, Texas 77057-1717
_.
(713};977-4844 FAX N0.713-977-4806
sitec ENGINEERING CORP.
The Site Technology Group
ENGINEERS • .PLANNERS. SURVEYORS
August 25,1997
City of College Station
Project Review Committee
1101 Texas Avenue
College Station, Texas 77842-9960
ATTN.• Shirley .Volk, Development Coordinator
RE: Site Plan -Holleman Arms Apartments (97-500)
Project No. 653-001
Ladies and Gentlemen:
Enclosed: please find the revised Site Plan for Holleman Arms. Apartments. Revisions have been
made in accordance with .your review. comments as outlined in your report of August 8, 1997.
Specifically, the following items have been addressed:
• The Engineer, Architect .and. Landscape Architect have been made aware of the screening
requirements for any utility connections visible from Holleman Drive.
• The throat length and width for the driveway entrance on Holleman Drive have been
dimensioned. The median width at the entrance has been decreased to 6 feet, flaring to a
width of 12 feet at the interior end of the driveway, in accordance with discussion at the PRC
meeting.
• The existing sidewalk along Holleman Drive has been labeled as such and. handicap ramps
indicated (detail added to sheet 5).
• A Key Map has been added to (new) Sheet 20.
• Adjacent driveway locations along Holleman Drive have been shown and noted.
• A general note addressing the absence of floodplain on the subject property has been added.
• Fire hydrant locations have been shown.
• All proposed public utilities (water and sanitary sewer) have been shown.
2202TIMBERLOCH PLACE SUITE 100
Tel. (281) 363-4039 THE WOODLANDS, TEXAS 77380 Fax (281) 363-3459
~ "' t
• Dumpster locations have: been labeled, and typical dimensions shown. A dumpster location
has been added to the peripheral parking SW of Building #3.
• 1Vlinimum, maximum and average utility demands for the development have been provided on
Sheet 4.
Landscape Plan Related
• The Landscape Architect has been asked to ensure there are no sight distance problems at the
Holleman Drive entrance.
• A general note has been added that all areas disturbed during construction must be cleaned up
and restored to their original condition.
• A general note has been added the irrigation shall cover all landscaped areas.
• It is understood that no points will be awarded for existing trees if any equipment or materials
are stored within the dripline.
Telephone and electrical service are being coordinated with the appropriate representatives.
The full .sets of construction documents submitted with the Site Plan and revised Drainage Report
reflect additional revisions in response to engineering review. The mark-ups are returned
herewith your reference.
We trust these revisions will fully respond to the conditions outlined at the PRC meeting and we
can proceed with Phase II of the. Building Permit process. Thank you for your continued
attention to this project.
SITECH ENGINEERING CORPORATION
'~ ~~ G~~-c~~ r ~yt~~iu~
BY: Lou Ann Montana
'~ From': Jim Smith
To City Hall.Smccully
Date: 8/1/97 12:-02pm
j Subject: PRC -Wednesday, August 6, 1997
~!, Master Preliminary Plat - Greesworld Subdivision (97-314.)s No problem.
Site Plan -Holleman Arms Apartments (97-500): Great looking site plan with
eight container locations.. However, I see a possible problem. How about
adding one more container located south of building #3, west of the parking
~ lot (mirror image of the container .location south of building #14 and east of
1 the parking lot). I'm certain Ghat the container southeast of building #3
will overflow. because of building #4, #5 and #13. See what you think and let
me know.
Final (Replat) Plat -.Rainbow Acres lst Installment-Block 1 Reserve Tract A
(97-227): No problem..
Thanks!!!
y~~ ~
ATI
OLLEGE ST ON
C
P. O. Box 9960 1101 Texas Avenue College Station, TX 77842
Tel: 409 764 3500
August 8, 1997
Mike Wick
DMC Builders
6363 Woodway, Suite 1000
Houston, Texas 77057
Dear Mr. Wick:
In response to your letter dated August. 7, 1997, .the City of College. Station .understands that
preliminary clearing and grading work has. began on the Holleman Arn>Is Apartzrients site. Sanitary
sewer service will be provided to this development.
If you should have any further questions or concerns, please give me a call at 409-764-3570.
Sincerely,
~/ `~
W. Paul Kaspar
Graduate Engineer
xc: Kent I,aza, City Engineer
Steve Homeyer, Assistant to the City Engineey
.Shirley Vollc, Development Coordinator
Home of °fexas A&M University
I
9
(409) 764-3500
i
July 14, 1997
i
~~ Lou Ann Montana
Sitech Engineering Corp.
~, 2202 Timberloch Place, Suite 100.
The Woodlands, Texas 77380
Dear Ms. Montana:
I am writing this letter in reference to the'Holleman Arms Apartments,' im pecific the capacity existing in
the 15 inch sanitary sewer interceptor line located along Christine. Lane which serves the property. The
City of College Station Engineering Department has analyzed the effects of the demands given to us by
Mr. Ron Saikowski, P.E in a letter dated June 5,1997 on the City's sewer system. The interceptor lines
serving your property are near or at capacity at present time. Any improvements that must be made to
downstream interceptor lines will be the-City of College Stafion's responsibility. Although the City is
responsible for these upgrades, the City cannot guarantee when they will be made.
If you have any questions, please call meat 409-764-3570,
Sincerely,
~G /`~C
W. Paul ICaspar
Graduate Engineer
xc: Steve Homeyer, Assistant to the City Engineer
Kent Laza, City Engineer
Shirley Volk, Development Coordinator
`Homeof Texas AEM ilniversity
J
~•I CITY OF COLLEGE STATIOI`I
.Post Office Box 9960 1101 Texas Avenue
Colle a Station, Texas 77842-9960
April 17, 1997
The Dinerstein Companies
Attn: Mr. Gary Fairchild
6363 Woodway, Suite 1000
Houston, Texas 77057
VIA: Fax and Regular Mail
RE: .Utility .Availability for 20.9 Acres on the Southwest Corner of Wellborn Road and
Holleman Drive
Dear Mr. Fairchild:
This letter is in response. to your request of the. availability of water. and sewer .services for the
above referenced property. There is an eighteen (18) inch water line located along the western
property line and a fifteen. (15) inch sewer line located approximately 500 feet south of this
properly. Although there are accessible utilities located within close proximity of this. property, it
is not safe', to assume that there is adequate capacity to meet the demands that some developments
may create. In order to determine adequate utility service, the City would need to receive utility
demands for the,proposed use. If the potential buyer has this .information, the City would be more
than happy to analyze. this data. The City treats this .information with .utmost confidentiality and
would not release this information to the public until there-has been a formal application submitted.
Ifyou have any questions, feel free to contact me at 764-3570.
Sincerely,
Steve Homeyer
Asst. to the City Engineer
xc: Kent Laza, City Engineer
Shirley Volk, Development Coordinator
~" 041.16/1997 07.37
713-260'-7825
DMC BUILDERS
THE
DINERSTEIN
COMPANIES
April 15, 1997.
Mr. Steve Hvmeyer
City of Colllege Station
1101 Texas Ave.
College Station, TX 77882
409-764-3592
Dear Steve,
PAGE 02
We are required by our lending institution to have Letters of Availability on future sites.
lease rovide us with your generic
Due to this requirement we are requesting that you p P
letter, on your letterhead, stating that you are capable of .providing service or that
service could be made available to our. site.. development. It istmperative that we have
this letter prior tv closing. tam faxing a map marking the location of our future site,
along with the following description:
20.9 acres just south of Texas A8~M's Anderson. tracklfield. The southwest
corner of Welbom Dr. or 2154 and Holleman Drive. It borders 500 feet on the
north by Holleman, 850 feet on the east by Welborn Rd. or 2154, and Marion
Pugh Dr. on the west.
In addition, on another page, please advise us as to what part of the service your
company performs, any fees, and what is expected of us as the developer, along with
any construction specification information which would aid in a preliminary site plan for
a future meeting. A map showing any utilities and easements would also be very
helpful.
1 look forward to meeting you and hope to be working together very soon. If you have
any questions please cal! me at 7131977-4844 ext. 346.
Sincerely ,
Student Apartment Contractors, Ltd.
By:
Gary Fairchild
8363 Woodway 14th Floor Houston, Tsxas 77Q57-1717
. _ r w v wlll 71 9_~77_dG2(lf1
~` 04/:16!1997 07:37 713-260-7E25 D~1C BUILDERS
''' i ~.. , ~ n ...• Hansel Park ~.,
I
ii
i
I, /
l
ti
A&M
Fialt!
sta[ion
~~ ~i ~ 8r
i
~ pa
i 3
` , a
~ 1 _~~
~ ~ C Collage Starion Apts
.I `s
~ SW Comer of WElbom ~ Hollattlan
~ ~Eaace[~aod FiBld (Ciq ~~ 18.539 Ac & 2374 ~qc Trs
,9 ~ ~
~~
l ~
1 ~~:
.~.,
s
~ ~ ~
~f dpi' NE.S P
I ~ ~ o~A~
1
f ~ F Y
;. t
' 1 _
1 9
f
~ `,y
ex ,s' ~ ~ o oDDe
G f."" S a
s
~ :,;; ~.
F~
//t f ...... ~ 5R. cfi / a~ ;'f
E;
U
o~~
V ~ ~•
1 \ /
V ~ { . °'~
~ 1
c ~ a.,5
f
~' I ~. ~,
~~ 7, 96 Dc sme eet Ad U5A ."
........... .._.._...
PAGE 03
~' i
t I
~- ~
.1, ~4_
r°
ST1-~TION
OLLEGE
C
P. O. Box 9960 • 1101 Texas Avenue College Station, TX 77842
Tel: 409 764 3500
July 29, 1997
Claude Arnold
DMC Builders
6363 Woodway, Suite 1000
Houston, Texas 77057
Dear Mr. Arnold:
This letter should act as a clarification to the letter addressed to Lou Ann Montana on July 17,
1997 concerning the sanitary sewer capacity for Holleman Arms Apartments. The City of College
Station does not reserve capacity in our sanitary sewer lines. In the previous letter it was stated
that any existing capacity in the line can be utilized by Holleman Arms Apartments for their
development. Once Holleman Arms Apartments is under construction, the City of College Station
will not stop such construction based solely upon lack of capacity in the sanitary sewer system.
If you should have any further questions or concerns, please give me a call at 409-764-3570.
Sincerely,
W. Paul. Kaspar
Graduate Engineer
xc: Kent Laza, City Engineer
Steve Homeyer, Assistant to the City Engineer~-°
Shirley Volk, Development Coordinator /
Lou min Mflntana, Sitech Engineering Corp.
2202 Timberloch Place, Suite 100
The Woodlands, Texas 77380
Home of Texas A&M University
THE
D~NERSTE'N
CO M PAN I ES
Ms. Shirley Volk
Development Coordinator
City of College Station
1101 Texas Avenue
College Station, TX 77842
RE: Holleman Arms: Apartments -College Station
Dear Ms. Volk,,
As we discussed by telephone last week, this letter is to notify you that we are officially under
construction at the project site.
We were issued a grading permit yesterday and plan to complete our preliminary clearing and
construction surveying immediately.
By copy of this letter, we are also informing Mr. W. Paul Kasper of our commencement of
construction activities on site. We do so in order to reserve existing capacity in the sanitary
sewer line serving the site.
Should you have questions now or any time during the construction process, please give me a
ca1L
W c~~ ~r,~ly y~.~rs,
Student Apartment Contractors, Ltd.
,~,~`~"
By:
C u e M. Arnold
Sr. ice President, Construction
CMA/wb
cc: W. Paul: Kasper, Graduate Engineer
Jack Dinerstein, Mike Wick, Bill Lawrence
One Woodway Centre 6363 Woodway 10th Floor Houston,. Texas 77057-1717
(713) 977-4844 FAX'NO. 713-977-4806
Page 1 `
Shirley Volk Re .Holleman Arms Parkland Dedication Forwarded
From: Steve Beachy ~~
To: Jane Kee, Ric Ploeger
Date: 8/5/97 5:03PM
Subject: Re: Holleman Arms -Parkland Dedication -Fowarded
thanks -keep us posted. We are interested in the configuration of the dedication. I told Paul Clarke that it
should be adjacent and contiguous to the existing park site. He asked if they could include the old RR
right of way and I said. yes.
»> Jane Kee 08/05/97 10:21AM »>
'~
'I
i
FILE NOTE
Holleman Arms Apartments
Case. #97-500
After a site inspection, Nanette Manhart noticed that the landscaping installed at this location did not
match the landscape plan. While the site looked nice and it appeared that the intent of the ordinance
was met, the landscaping in the field was so different from the approved plan, that staff could not
determine if the points were met. I requested that the builder submit an "as built" landscape plan so that
at a minimum, we would be able to go into code enforcement in the future. I explained that since the
drought over the summer, we .would .probably do a sweep of everything recently constructed to make
sure that the landscaping was installed and still living.. Without an "as built", we would be forced to use
the approved landscape plan and the management would have to comply with a plan that was never
installed in the first place.
DMC Builders submitted an "as built" landscape plan for our use on October 7, 1998. Staff did not
verify that the plan met the minimum point requirements, etc. We accepted the plan and issued the final
C.O. without any conditions. The plan appeared to meet the intent of the ordinance and have
approximately the. same number of trees, shrubs and groundcover as the approved plan.
Natali Thomas Ruiz
Assistant Development Coordinator