Shirle Volk CS Vehicle Maintenance :Bldg Addition ::...:::::.....:;::.:.:.; ::::.---::::::---::.:,.:::..::,::::...:::..:.:---:.~:::.:..::::::::.:;:::::....::::.
From: Shirley Volk
To: Mark Smith
Subject: CS Vehicle Maintenance 131dg Addition
Mark,1've been trying to figure out who to contact to talk about the pavement which. still needs to be
replaced before a C.O. can be issued at the addition to the maintenance building, and all leads point to
you! So I'm contacting you to (1 )find out the schedule for replacing the pavement and (2)to see if there
is anything I can helpyou,with and (3)remind you that since that pavement is part of the approved site
plan (I think, since it's really drawn kinds "funny"), it .needs to be complete before the C.O. can be issued.
Final inspections were beginning to be called in and that's what triggered my contact with the "project
manager", and in tracking down that person, l found that there have. been some interior changes planned
which we didn't know about which must be completed before a C.O. is issued, so my contact. may be
premature+.
Anyway, if you're not the p.m., please let me know who is and I'll work with them in the future. Thanks.
_ ___
FROM ARKITEX STUDIO INC PHONE N0. 4098468224 May. 29 1998 11:57AM P1
FAX TRANSMISSION COVER SHEET
TO: Paul Kasper
COMPANY: City of College Station Development Services
FROM: Mike Record
PROJECT: CS Vehicle Maintenance Facility NO: 9707
DATE: 29 May 1998
PAGES (including cover}: 02 FAX NUMBER: 764-3496
!f you do not recer've al! indicated pages, please call us Immediately at (409J~60-2635.
NOTES: Response to plan review comments. Original to follow in
the mail.
Mike Record, AIA
Project Architect
Priacipale
CgaiFle Surrl9, AIA
JbU[CIS~ ~ i~fRCX.Ca]Rl
Chad Gxa7rke, iIA
e ,com
e rau a[klt x
& ~°
'', Dr. $ltoe Abbots, A1A
eabbalt~?a r ki 17:X. C7][rt
Mlke tlbhetta, AIA
metibb +Qawbell.na
Austin Office
vdtoe 3721x4+-fbf0
Fac q5t:1eai-oR37
Mfi} i t~~~~3~~s
~~s~ kt;~':~C
511 Urrive[sRy Dr Fact
8ulU 207
G[Oepe 8T~e717Y 77aC0
Pas eaueM1eaxxa
•wvr.arkli~s.70om
FROM : ARKITEX STUDIO INC PHONE N0. 4098468224 May. 29 1998 11:57AM P2
~,
29 May 1998
City a# Coltiege Station
Building and Site Pian Review
1101. Texas Avenue
College Station, TX 77842
RE: College Station Vehicle Maintenance Facility
9707
The following are in response to the plan review comments:
Sife Plan Review:
O~ • Detail #3 is referenced an the site plan to the right of key 2/A1 at the NW
corner of the new building.
OJT- • Omit details #~ and #6. Detail #4 is a duplicate of detail #3 and detail #s is
51i V~uvsreliy Or. Eaet
Sage xc, not used.
Coaaga 6faLm~TX naao Revise the note "EDGE OF FLOOD CHANNEL" to "LINE OF FLOODWAY".
Ydca ao[[seoze+s No work for this project is within the floodway.
Fax 90B8iG8229
vom.~skitea[.oom
If you have any questions or comments, please calf.
L..~~t e, 5~"' Si~ rel ~,,,~~ ,~.aD f - ~o~~•~re,. ~-° fiizm~4- l~tti I~'C~s.
~~x~ Mike Record, AIA
(,,e,,~„t, ~ Project Architect
i3.
~t'1„t ~ ~w~arov~~odss
,arc. ~ ~~. ~~
Principals
Charlie liturrio, AIA
daurria~arki[ex.eom
Chad Oaeuke, AlA
egraukeng a rki[ea[.cvm
Dr. Eltoa Abbott, AfA
r_abUoat~tkitcx.com
Mike 'Cibbette, AIA
matibbQk~vhell.ndt
~ustia Office
voloe Ji21FCa•7670
~aa tty7g4a-02ay
oi2i#iRfiRE::%2~£~<RKS^.:kt:t:~f
~~.
STAFF REVIEW REPORT
December 11, 1997
TO: Mark Smith, Director of Public Works
City of College Station
Chad Grauke, The Arkitex Studio
511 University Drive East, Suite 201, College Station, TX 77840
FROM: Reviewing Staff
Sabine McCully, Senior P
Paul Kasper, Crraduate Ci ngineer
Others Attending
Natalie Ruiz, Assistant Development Coon a
Shirley. Volk, Development Coordinator
Tony Michalsky, Electrical Operations Coordinator
Laverne Akin, GTE Representative
SUBJECT: Parking Lot Plan -Vehicle Maintenance Facility; proposed addition to the
existing vehicle maintenance facility located at the City of College Station's Public
Works building at 2613 Texas Avenue South. (97-436)
The following is a list of ordinance requirements and comments identified by staff. This list does
not relieve the applicant of total- compliance with all current .ordinance requirements.)
Ordinance Requirements:
Situ Plan Related
Note the area of new and existing buildings shown on the site plan.
Label the size of existing and proposed water and sanitary sewer lines.
Provide a key map.
_ Submit a drainage report for the proposed expansion. (It appears that the filling in the
floodplain will require a LOMR-F to be processed through the City and FEMA.)
Provide a utility demand. legend to include minimum, maximum and average demands for
water and sanitary sewer..
Show meter locations.
Show the fire lanes.
Show the floodway line.
_ Dimension the new paved areas & clarify the pavement edge of the proposed pavement
contained in the-shaded area near the ma,~ntenance facility addition. (See detail #5. If the
public has access to this area, the pavement ~ust'be curbed.)
__ u
___
Parking Lot Plan
Vehicle Maintenance Bldg.
Case #97-436
Page 2 of 2
Comments/Concerns:
j _ Coordinate electrical service requirements with Electrical Operations Coordinator Tony
Michalsky at (409) 764-3660.
Coordinate telephone service details with G.T.E. Representative Laverne Akin at (409}
821-4723.
SUBMIT 3 COMPLETE SETS DF CONSTRUCTION DOCUMENTS WITH THE REVISED
'' TTACHED TO CONTINUE WITH PHASE II OF THE
SITE & GRADING PLAN A
BUILDING PERMIT PROCESS. COORDINATE FITTURE SUBMITTALS WITH
DEVELOPMENT COORDINATOR SHIRLEY YOLK AT (409) 764-3570.
STAFF NOTES
Vehicle Maintenance Facility
Case #97-436
Ordinance Requirements:
Site Plan Related
Note the area of new and existing buildings shown on the site plan.
Label the size of existing and proposed water and sanitary sewer lines.
Provide a key map.
Submit a drainage report for the proposed expansion. (It appears that the filling in the
floodplain will require aLOMB-F to be processed through the City and FEMA.)
Provide a utility demand legend to include minimum, maximum and average demands for
water and sanitary sewer.
Show meter locations.
Show the fire lanes.
Show the floodway line.
bimension the new paved areas.
_ Clarify. the pavement edge, of the proposed pavement contained in the shaded area near the
maintenance facility addition. (See detail #5. If the public. has access to this area, the
pavement must be curbed.)
Comments/Concerns:
_ Coordinate the electrical service requirements with Electrical Operations. Coordinator
Tony Michalsky at (409) 764-3660.
_ Changes to the existing facilities will be at the owner's expense. Coordinate telephone
service details with G.T.E. Representative Laverne Akin at (409) 821-4723.
SUBMIT 3 COMPLETE SETS OF CONSTRUCTION DOCUMENTS WITH THE REVISED
SITE & GRADING PLAN ATTACHED TO CONTINUE WITH PHASE II OF THE
BUILDING PERMIT PROCESS. COORDINATE FUTURE SUBMITTALS WITH
DEVELOPMENT COORDINATOR SHIRLEY VOLK AT (409) 764-3570.
From: Shirley Volk
To; Mark Smith
Subject: Addition to Fleet building
Mark, the contractor-has brought in some plans for this building because he wants. to get a building
permit and .get started on the project. The problem is that not one item which was either redlined or
questioned on the first reviewwe made of this proposal back in December has been addressed on the
plans the contractor has submitted for a building permit! Not even the one rather simple. question the
building .plans checker and Tony M. had regarding location of service to the building! How do you want
to proceed? Should we return the -plans to someone? Who? We sent back the staff review report to
both you and ArkiTex Studio in December, but somehow`the contractor got plans which had not been
revised to address our review. Please advise as to how to handle this. Thanks. P.S. That's what I left a
phone message for you about this rooming.
CC:
Jane Kee, Jim Callaway, Lance Simms, tee Battle...
l ~
jl~
,...
t'
From: Mark Smith
To: SVOLK~c~' City of College Station.City Hall
Date: 5/4/98 1:09PM
Subject: Re: Addition to Fleet building
I will forward this concern to Chad at Arkitex
»> Shirley Volk 05/04/98 12:55PM »>
Mark, the contractor has brought in some plans for this building because he wants to get a building
permit and get started on th'e project. The problem is that not one item which was either redlined or
questioned on the first review we made of this proposal back in December has. been addressed on the
plans the contractor has submitted for a building permit! Not even the .one rather simple question the
building plans checker ar-d Tony M. had regarding location of service to the building! How do you want
to proceed? Should we return the plans to someone? Who? We sent back the staff review report to
both you and ArkiTex Studio in December, but somehow the contractor got plans which. had not been
revised to address our review. Please advise as to how to handle this. Thanks. P.S. That's what I lefta
phone message for you about this morning.
CC: Jane Kee, Jim Callaway, Lance Simms, Lee Battle...
~L/
oCiC'~~~
'~/ ~ ~~
G~r~e ~ ' A
~, / /Oi . ^ /_ VII ~ - t ~ . i~i~~
--.;::
.. n.+.+ + .,., +~ Glco+ hi iilrling
vervnwa mvi au ~,~~~.~~••
'1-~3~
From: Shirley Volk
To: Mark Smith ~-`11.9
-Date: 5/ /~' 12:55PM °~; ~Q
Subject:. Addition to Fleet building ~ "
Mark, the contra roug din some plans for this building because he wants to' get a building
permit and get started on the project. The problem is that not one item which was either redlined or
questioned on the first review we made of this proposal back in December has been addressed on the
plans the contractor has submitted for a building permit! Not even the one rather simple question the
building plans checker and Tony M. had regarding location of service to the building! How do you want
to proceed? Should we return the plans to someone? Who? We sent back the staff review report to
both you and ArkiTex Studio in December, but somehow the contractor got plans which had.-not been
revised to address our review. Please advise as to how to handle this. Thanks. P.S. That's what I left a
phone message for you about this morning.
CC: Jane Kee, Jim Callaway, Lance Simms, Lee Battle...
~}
FAX TRANSMISSION COVER SHEET 0~'~ .l~ 3~
TO: Paul Kaspar
COMPANY:. City of College :Station Development Services
FROM: Mike Record
PROJECT: CS Vehicle Maintenance Facility NO: 9707
DATE: 29 May 1998
PAGES (including cover): 02 _ FAX NUMBER: 764-3496
' I t (409)260-2635
_~'!- ~~~ _ If you do not receive all indicated pages, please call us immediate y a
s~~te"'"eB'ry°`E o, NOTES: Response to plan review comments. Origir~ai to foiiow in
College StaBon,Tx 77840 the mail.
Vdca 4092602635
Fax 409 846 8224
www.arkitez.oom
~~~~~'~/
Mike Record, AIA
Project Architect
~~ i
Principals
Charlie Harris, AIA
cburris@arkitex.com
Chad Grauke, AIA.
cgrauke@arkitex.com
Dr. Elton Abbott, AIA
eabbott@arkitex.com
Mike Tibbetts, AIA
metibb@swbell.net
Austin Office
Voice 512/244-7870
Fax 512(244.0237
~~
~8~
f v
/~
~I I~
29 May 1998
City of College Station
Building and Site Plan Review
1101 Texas Avenue
College Station, TX 77842
RE: College Station Vehicle Maintenance Facility
9707
511 Unlverelty Dc East
5tl lte za,
College Statlon,TX 77840
Voice 4092602635
Fax 4008469224
www.arkite:. oom
Principals
The following are in response to the plan review comments:
Site Plan Review:
• Detail #3 is referenced on the site plan to the right of key 2/A1 at the NW
corner of the new building..
• Omit details #4 and #6. Detail #4 is a duplicate of detail #3 and detail #6 is
nat used.
• Revise the note "EDGE OF FLOOD CHANNEL" to "LINE OF FLOODWAY".
No work for this project is within the floodway.
If you have any questions or comments, please call
Sincerely,
Mike Record, AIA
.Project Architect
Charlie Harris, AIA
cburris@arkitex.com
Chad Grauke, AIA
cgrauke@arkitex.com
Dr. Elton Abbott, AIA
eabbott@arkitex.com
Mike Tibbetts, AIA
metibb@swbell.net
Austin Office
Voice 572/244.7870
Faz 512/244-0237