CONDITIONS OF APPROVAL{cont.):
Ordinance Requirements:
Site Plan Related
_ What is the dimension between the new parking row near College Avenue and the existing
parking row on the adjacent John. Cecil Culpepper property? Does it meet minimum
circulation. aisle requirements? Add the dimension.
_ The dumpster .location is not accessible to the sanitation vehicles. Work with staff to
determine an accessible location.
Detail #1, Concrete Curb & Gutter, is incorrect. The curb and gutter section must total
- 24„.
Detail #2, Reinforced Concrete Pavement -the ordinance requires #4 bars on 18" centers.
Change key note #13 to key note #19.
1Von Site Plan Related.•
_ Submit a drainage report or letter addressing the additional impervious cover being added
to the site.
_ The .awnings shown. are acceptable .with down lighting.
Comments/Concerns:
.Coordinate the electrical .service requirements with Electrical Operations Coordinator
Tony Mchalsky at (409) 764-3660:
_ Changes to the existing. facilities will be at the owner's expense. Coordinate telephone
service details with G.T.E. Representative Laverne Akin at {409) 821-4723.
The motion to approve the. parking of plan with the above mentioned conditions was seconded by
Member Sopasakis which passed unopposed- (6 - 0).
SUBMIT 3 SETS` OF CONSTRUCTION DOCUMENTS WITH THE REVISED SITE PLAN
ATTACHED TO CONTINUE WITH PHASE II OF THE BUII.DING PERMIT PROCESS.
COORDINATE FUTURE .SUBMITTALS WITH DEVELOPMENT COORDINATOR
SHIRLEY YOLK AT (409) 764-3570.
~~o~~,~~
`~""
Ordinance Requirements:
Schlotzsky's Deli in Northgate
Case #97-432
~~
~~
..~~~
Site Plan Related / - '"~"' -`
_ Staff is concerned with the potential. conflict of the existing driveway opening and new
parking of island. '1' ~ ' - ' - -'- - - -„ '- ~-~- ~ _ _ , - Wis. The NRB
discusse possibility of eliminating a few parking space~in this area ,to re~mov ~-
conflict.
What is the dimension between the new parking row near College Avenue and the existing
parking, row on the adjacent Jo ~~ci~Culpepper property? Does. it meet minimum
circulation aisle requirements? '`'''
r o
_ The dumpster location is not accessible to the sanitation vehicles. Work with staff to
determine an accessible location.
i in is et e ' me ro a
S w the loc n of a exist' e h t St on a hat the e hydra t
e e not si ow any e n ose re an
Detail #1, Concrete Curb & Gutter, is incorrect. The curb and gutter section must total
- 24„
Detail #2, Reinforced Concrete Pavement -the ordinance requires #4 bars on 18" centers.
_ erify th e to #1 's orrect. appear it is r e encing w p _a _not
GTE c duit.) ~ j~ ~
Non Site Plan Related.•
_ Submit a drainage report or letter addressing the additional impervious cover being added
to the site.
Comments/Concerns:
_ Coordinate the electrical service requirements with Electrical Operations Coordinator
Tony. Michalsky at (409) 764-3660:
_ Changes to the existing facilities will be at the owner's expense. Coordinate telephone
^~ervice details with G.T.E. Representative Lave~rn/eAkin at (409) 821 7 3. .•
SUBMIT 3 SETS O1~T'~R~cT'~U~1~'~ EI~~`S°V~~r`I`~`REVISED SITE PLAN
ATTACHED TO CONTINUE WITH-PHASE II OF THE BUILDING. PERMIT PROCESS.
COORDINATE FUTURE. SUBMITTALS WITH DEVELOPMENT COORDINATOR
SHIRL,EY JGOLK~AT (409) 764-357Q. ~/~
~Q ~~
~~
NORTHGATE REVITALIZATION BOARD REPORT
November 10, 1997
TO: Dan Palermo & Dick Goldsmith, Christian Development
3131 Fountainview Drive, Houston, TX 77057
Stuart Kling, .Kling Engineering
4103 Texas Avenue, Suite 212, Bryan, TX 77802
FROM: Northgate Revitalization Board Subcommittee:
Tara. Sopasakis, NRB-Member
Richard Benning, NRB Member
Cheryl Anz, NRB Membe
Charles Anderson, NRB ember
Jane Kee, City Pl er
Veronica Morgan, As ' t City E er .
Others: Attending
Natalie Ruiz, Planning Technci
Shirley Volk, Development Coordinator
Todd McDaniel, Economic Development yst
TonyMichalksy, Electrical Operations Coordinator
Laverne Akin, GTE Representative
SUBJECT: Parking Lot Plan: - Schlotzsky's Deli at 107 South College Avenue; proposed
restaurant to be 1located in the. Northgate zoning district, previously Mr. Gatti's
restaurant. {97-432)
A Northgate Revitalization Board subcommittee meeting was.. held Wednesday, November 5,
1997 to discuss thabove mentioned parking lot plan. Member Anderson moved to approve the
site plan with the' following. conditions: {The following is a list of ordinance requirements and
comments identified by the PRC. This list does not relieve he applicant of total compliance with
all current ordinance requirements.)
CONDITIONS OF APPROVAL:
Ordinance Rqurements:
Site Plan Related
_ Proposed signage must. be submitted, reviewed and approved by the NRB prior to
permitting... (The sgnage _is being. reviewed separately from the site. plan.) There is an
existing variance to use the two freestanding sign poles.
_ Staff is concerned with the potential conflict of the. existing driveway opening and new
parking lot island. The NRB discussed the possibility of eliminating a few parking spaces
and reconfigure and include a raised island. in this. area to remove the conflict.
NORTHGATE REVITALIZATION BOARD REPORT
February 2, 1998
TO: Dan Palermo & Dick Goldsmith, Christian Development
3131 Fountainview Drive, Houston, TX 77057
Stuart Kling, Kling Engineering
4103 Texas Avenue, Suite 212, Bryan, TX 77802
Bill Logue, Bell Sign Company
1200Be11 Avenue, Panama City, FL 32401
FROM: Northgate Revitalization .Board Subcommittee:
Julius Gribou, NRB Chairman
Tara Sopasakis, NRB Member.
Cheryl Anz, NRB'Mernber
Ron Silvia, P&Z Representative
Jane Kee, City Planner
Veronica Morgan, Assistant City Engineer
Others Attending
Natalie Ruiz, Planning T a
Sabine McCully, Senior Planner
Lee Battle, Staff Planner
SUBJECT: Sign. Package - Schlotzsky's Deli at 107 South College Avenue; proposed sign
package for a free standing and attached signage for the new restaurant currently
under .construction in the Northgate zoning district,. previously Mr. Gatti's
restaurant. (97-432)
A Northgate Revitalization Board subcommittee meeting was held Wednesday, January 28, 1998
to discuss the above mentioned proposal. After a site visit, the Board determined that the height
of the proposed freestanding sign is acceptable. Chairman Gribou moved to approve the sign
package as proposed. NRB Member Sopasakis seconded the motion which passed unopposed
(6 - 0).
COORDINATE THE NECESSARY SIGN PERMITS AND FUTURE SUBMITTALS WITH
BUILDING OFFICIAL LANCE SINIlVIS AT (409) 764-3570.